Duke Energy Corporation (holding Company) · NYSE:DUK
Duke Energy Corporation (holding Company) — Bernstein Environmental Utilities Conference 2011
17 slides from Duke Energy Corporation (holding Company)'s conference presentation, Apr 5, 2011
Slide 1: EPA's Cooling Water Intake Proposed Rule
EPA’s Cooling Water Intake Proposed Rule John Roebel - SVP of Generation Support, Duke Energy April 5, 2011
Slide 2: Safe Harbor Statement; Reg G Disclosure
SAFE HARBOR STATEMENT This document contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements are typically identified by words or phrases such as “may,” “will,” “should,” “anticipate,” “estimate,” “expect,” “project,”
Slide 3: Duke Energy Overview
Duke Energy Overview Regulated Businesses Commercial Businesses U.S. Franchised Electric & Gas Commercial Power International • ~27,000 MW of regulated generation • ~7,600 MW of unregulated • ~4,200 MW of Latin American • Electric transmission & distribution generation generation assets • Natural ga
Slide 4: Overview of Proposed 316(b) Rule
Overview of Proposed 316(b) Rule U.S. Environmental Protection Agency (EPA) proposed 316(b) cooling water intake rules on March 28, 2011 Subject to 90 day comment period after publication Final rules anticipated in July 2012 Impingement requirements Prevention of aquatic mortality due to c
Slide 5: Summary of the Four Options Presented for Comment
Summary of the Four Options Presented for Comment Option 1 - EPA's Preferred Option Option 2 Option 3 Option 4 DIF Threshold for 50 MGD Impingement 2 MGD 2 MGD 2 MGD [BPJ between 2 and 50 MGD] Requirements DIF Threshold for Entrainment 2 MGD 125 MGD 2 MGD 2 MGD Requirements Mandatory impingement Man
Slide 6: 316(b): EPA's Preferred Option – Option 1
316(b): EPA’s Preferred Option – “Option 1” Impingement requirements Affects all facilities >2 million gallons per day (MGD) of design intake flow (DIF) (which covers just about everyone, including combined cycle and “new” plants) Attain mortality rates below a standard or achieve flow velocit
Slide 7: Duke's Interpretation of the Proposed Rule
Duke’s Interpretation of the Proposed Rule Impingement Most likely involves modifications to intake screens Closed cycle cooling retrofits should not be warranted Documenting compliance could be challenging If the mortality rates cannot be demonstrated, then the intake velocity limit could
Slide 8: How Will Duke Make Project Decisions?
How Will Duke Make Project Decisions? Duke uses a multi-step economic modeling and project development process to build information for decision making purposes This includes a modeling process that combines all of the pending environmental requirements together Air, water, waste No individu
Slide 9: Will this Proposed Rule Ultimately Affect Duke's Decisions?
Will this Proposed Rule Ultimately Affect Duke’s Decisions? Impingement mortality controls alone are not expected to be costly enough to affect run/retire decisions Those decisions will still be based on the sum total of all air, water, and waste requirements Entrainment controls will be based
Slide 10: Duke Position Under the Proposed Rule
Duke Position Under the Proposed Rule Duke Energy Domestic Steam Capacity, Share MW Total System (including capacity under construction) 27,681 Units With Closed-Cycle Cooling, or Not Affected by the Rule 42% Announced Retirements 4% Other Unscrubbed Coal Affected by the Rule 11% Scrubbed Coal & Nuc
Slide 11: Potential Impacts to Nuclear Units vs. Fossil Units
Potential Impacts to Nuclear Units vs. Fossil Units Special considerations for retrofitting cooling towers at existing nuclear plants Interaction with safety related equipment Nuclear Regulatory Commission licensing Refueling outage extensions for equipment tie-in Costs of cooling tower re
Slide 12: Cost Recovery
Cost Recovery Regulated Units Duke does not currently have Commission pre-approval for cost recovery of these types of projects in any of our regulated operating jurisdictions Duke has strong historical experience with environmental cost recovery Clean Air Rules resulted in costs of approxim
Slide 13: Appendix
APPENDIX Pe Eneray.
Slide 14: Duke Facility Data
Duke Energy Steam Capacity, Duke Units by Facility Share MW Type Structure Current Cooling Method Cayuga 1,005 Fossil Reg Once-Through Gibson 2,845 Fossil Reg Cooling Lake, No NPDES Permit Facility Wabash River 668 Fossil Reg Once-Through Edwardsport IGCC 617 Fossil Reg Closed Cycle - No Intake Gall
Slide 15: 15
15
Slide 16: Duke Energy Corporation Non-GAAP Reconciliations
Duke Energy Corporation Non-GAAP Reconciliations Bernstein Environmental Utilities Conference April 5, 2011 2011 Adjusted Diluted EPS Outlook The materials for Duke Energy’s Bernstein Environmental Utilities Conference presentation on April 5, 2011, include a discussion of the forecasted 2011 adjust
Slide 17: Adjusted segment EBIT non-GAAP measure
Adjusted segment EBIT is a non-GAAP financial measure as it represents reported segment EBIT adjusted for the impact of special items and the mark-to market impacts of economic hedges in the Commercial Power segment. Special items represent certain charges and credits which management believes will
Duke Energy — Bernstein Environmental Utilities Conference 2011 on 6ix