Redcastle Resources Limited · ASX:RC1
Redcastle Resources — Investor Presentation (May 2026)
16 slides from Redcastle Resources's investor presentation, May 2026
Slide 1: Successful Transition to Gold Producer
Successful Transition to Gold Producer SIGNIFICANT DISTRICT-SCALE EXPLORATION Golden Circle Eastern Goldfields PRESENTATION ASX:RC1 | MAY 2026
Slide 2: Confidential – Important Notices and Disclaimer
Confidential– Important Notices and Disclaimer DISCLAIMER This document is confidential and may not be reproduced, redistributed or passed on, directly or indirectly. This document is neither a prospectus nor an offer to subscribe for Shares. Redcastle Resources Limited ACN 096 781 716 (Redcastle
Slide 3: RC1 Corporate Overview
RC1 Corporate Overview Capital Structure Shares on issue 120,049,561 Listed Options (Expiry 7 Oct 28 @ 15¢) 34,255,579 Unlisted Options (Various strike and expiry) 9,475,000 Share Price (at 7 May 2026) $0.175 Market Capitalisation (undiluted) $21M Unaudited Cash Balance (at 31 March 2026) $0.847M Bo
Slide 4: Redcastle 2026: Transition to 'Gold Producer' with Upside
Transition to‘Gold Producer Redcastle 2026: ’ with Upside Continuous mining operations by late May at Redcastle Gold Project Strategic landholding covering* ~151km2 JV with BML Ventures (RB JV) Expedites Gold Production: • Capital Light tactic to accelerate cashflow • BML funds ~$20-$30M to firs
Slide 5: RB JV Expedites Mobilisation for Mining Operations
RB JV Expedites Mobilisation for Mining Operations RC1 set to unlock first gold revenues in 2026 RB JV delivers critical milestones on schedule Mining Development approval granted • Key regulatory milestone • Mining operations within Mining Lease M39/318 o Hosting QA and RR gold deposits • Heavy
Slide 6: Redcastle Reef Coarse Gold Deposit (RR)
Redcastle Reef Coarse Gold Deposit(RR) RR will be mined first - demonstrates co-development and expansion potential QA and RR are only ~700m apart, RR completely contained in M39/318 JORC-compliant MRE of 13,000oz grading 224 kt at ~1.8g/t Au^ – and technical work underway to update the MRE Hi
Slide 7: RR Grade Control Drilling
RR Grade Control Drilling Delivers stunning, high-grade results GC dataset - 327 RC GC holes completed at RR for 13,539m Results support the high-grade shoot model with 23 holes from the GC drilling program encountering individual assay grades higher than 20 g/t Au Multiple thick, high-grade g
Slide 8: RR - Potential 300m Strike Extension
RR- Potential 300m Strike Extension Sterilization drilling returns high-grade gold and interpreted extension Broad spaced SHRC drilling program of 36 holes for approximately 1,977m; designed to test for gold mineralisation between RR and QA Four holes in the northern sector returned gold mineral
Slide 9: Queen Alexandra Gold Deposit (QA)
Queen Alexandra Gold Deposit (QA) High-grade shallow resource at QA driving near-term production JORC-compliant MRE 29,000oz grading 3.4g/t Au** • (ASX: RC1 30 June 2025) Multiple Shallow +10g/t Intercepts >80 % hit rate on Kestrel Lode holes (>1 g/t) • Confirmed continuous high-grade shoot •
Slide 10: QA Infill Drilling Exceptional Results
QA Infill DrillingExceptional Results Infill results strengthen mining development pathway Infill drilling campaign • 25 holes for ~2,800m • Assay results received for 16 holes for 1,120m Standout infill QA results to date include* • BMRC410: 4m @ 12.3 g/t Au from 32m, including 1m @ 29.4 g/t Au
Slide 11: Morgan's Castle East Prospect and 'The Corridor'
‘The Corridor’ Morgan’s Castle East Prospect and Drilling outlines a broad, low-grade gold system containing isolated higher-grade values Located within an East-West mineralised corridor ~1.7km long Recent Morgan’s Castle East (MCE) RC drilling included 19 holes 1,843m 1m split assay results fro
Slide 12: TBone Belt - Exploration Upside next to Redcastle Project Area
TBone Belt- Exploration Upside next to Redcastle Project Area Under-explored by modern techniques – the excitement of multiple targets ~50% of the TBone Belt area historically sampled with surface geochemistry and limited sparse drilling, offering significant discovery upside potential 16 potent
Slide 13: Building Regional Scale for Sustainable Business
Building Regional Scale for Sustainable Business Kilkenny Belt acquisition expands RC1 footprint to ~151km2 Binding Farm-in and JV Agreement* • Strategic Eastern Goldfields tenure package • 15 tenements and applications covering 64km2 • Nearly contiguous and enhanced structural settings • Yet to b
Slide 14: RC1: On the run to production and more growth
RC1:On the run to production and more growth Q2 2026 Q3 2026 Q4 2026 May June July August September October November December Development / Production (RB JV) Mobilisation and start continuous mining Ongoing mining operations RR GC drilling at QA Mining at QA incl pit extension Milling and processin
Slide 15: Why RC1, Why Now?
Why RC1, Why Now? A 12-MONTH TRANSFORMATION RC1 is no longer just a small explorer story. The company has matured, resources The re-rating Funded casepathway production is building + exploration + have grown, and the RB JV provides a capital-light pathway toward gold production and cashflow. distric
Slide 16: Thank You
Contact RC1 THANK YOU For any queries, please contact our team on the below details: Ron Miller: admin@redcastle.net.au Sam Burns: Six Degrees Investor Relations +61 400 164 067 sam.burns@sdir.com.au www.redcastle.net.au | Page 16
Redcastle Resources — Investor Presentation (May 2026) on 6ix