American Electric Power Company, Inc. · NASDAQ:AEP
American Electric Power — Midwest Utilities Conference 2011
37 slides from American Electric Power's conference presentation, Apr 4, 2011
Slide 1: Midwest Utilities Conference
Midwest Utilities Conference Chicago April 4, 2011 1
Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995
“Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934. Although AEP and each of its Registrant Subsidiaries believe that their expectations are
Slide 3: Chuck Zebula – Treasurer & SVP Investor Relations
Chuck Zebula – Treasurer & SVP Investor Relations 3
Slide 4: American Electric Power
American Electric Power Generation owned11 (GW) Generation owned (GW) Southern 42.9 Serving electric customers in Co NextEra 11 states 42.7 Energy AEP 39.9 Duke 38.5 One of the largest Energy U.S. electricity generators Transmission miles11 (‘000s) Transmission miles (‘000s) A EP 39.0 Southern 27.0
Slide 5: Highly Diversified Regulated Utility Platform
Highly Diversified Regulated Utility Platform 2010 On-Going Earnings 2010 Retail Load Contribution Public Service of Kentucky Southwestern Oklahoma Power 3% Wholesale * 10% Electric 6% Power 11% Residential Ohio Power 30% 24% Texas Industrial 8% 33% All Others Columbus 5% Southern Power Indiana & 17
Slide 6: Domestic Generation Fleet
Domestic Generation Fleet Generation Capacity by Fuel Type 2010 Generation Production by Fuel Type Based on 39,910 MW Based on 173.2 TWh Pumped Pumped Storage/Hydro/ Nuclear Storage/Hydro Wind/Solar 9.0% 0.5% Nuclear 7% 5% Nat. Gas/Oil 8.0% Nat. Gas/Oil 23% Coal/Lignite 65% Coal/Lignite 82.5% Genera
Slide 7: AEP Generation Capacity
AEP Generation Capacity East Capacity – 27,253 MW West Capacity – 11,677 MW AEP Ohio, APCo, I&M, AEG, KPCo, Wind, Solar, Hydro PSO, SWEPCO, TNC, Wind Wind Renewables 9% Coal 5% 38% Nuclear Coal Source 8% Coal Source NAPP 46% NG CAPP 30% PRB 75% 11% PRB 22% Lignite 25% Others 2% Avg. Delivered Cost A
Slide 8: Emissions Reductions since 2000
Emissions Reductions since 2000 U.S. Power Plant SO2 Emissions AEP SO2 Emissions 11.2 10.6 10.2 10.6 10.3 10.2 1,020 997 9.4 924 937 in million U.S. tons 8.9 915 900 in thousand U.S. tons 853 7.6 749 55% 5.7 49% 638 reduction reduction 457 since 2000 since 2000 2000 2001 2002 2003 2004 2005 2006 200
Slide 9: Pending EPA Regulations
Pending EPA Regulations TRANSPORT RULE MERCURY AND HAP MACT Proposed Transport Rule (July 2010) limits utility SO2 and NOx Proposed rule issued in March 2011 emissions Final HAP regulations must be issued by November 2011 SO2 and NOx subject to caps in 2012, with further SO2 reductions requi
Slide 10: Transmission Investment Strategy
Transmission Investment Strategy Near-Term Investment – Electric Transmission Texas (ETT) secures near term investment opportunities, allowing AEP to invest in the large, growth-oriented Texas transmission market. Total project cost of $3 billion with a 9.96% ROE. Mid-Term Investment – Seven who
Slide 11: Joint Venture Strategy: Long-term
Joint Venture Strategy: Long-term Strategy: JV’s secure new investment opportunities with local utilities to diversify AEP’s investment outside AEP’s traditional footprint while providing longer-term incremental earnings. JV projects are well-suited for FERC formula rate recovery mechanism, includ
Slide 12: AEP Ohio ESP Filing – Core Policy Issues
AEP Ohio ESP Filing – Core Policy Issues Investment in Ohio Jobs in Ohio Energy Security Supports economic Jobs are a key Secure, reliable and development and component of growth predictable electricity essential tax base potential in Ohio supply is basis for sustained investment and employment in O
Slide 13: Capital Allocation
Capital Allocation In this economic recovery cycle, capital allocation requires balance for spending that considers the obligation to serve, the ability to obtain rate increases, a balance sheet to support the plan, and the total return proposition to shareholders Capital for Growth – Capital budg
Slide 14: Capital Expenditures
Capital Expenditures $3,000 $2,900 $2,615 AEP Transco $2,487 $350 $2,500 $160 JV Equity $1 $47 $113 $280 Contributions, net $77 $2,243 $34 AEP River Ops & $50 $223 Other Non-Utility $457 $24 $56 Environm ental $2,000 $303 $319 $256 New Generation $ in millions $62 $263 $82 $133 Corporate/Other $1,50
Slide 15: 2011 Ongoing Earnings Guidance
2011 Ongoing Earnings Guidance 2010A: $3.03/share 2011E: $3.00-$3.20/share Near-Term Earnings Drivers AEP Total Normalized GWh Sales Quarter % Change vs. Prior Year Recovering economy 15% 10% Rate recovery from returns on capital 5% investment 2.5% 1.9% 1.7% 0.8% 1.1% 0% Continued O&M discipli
Slide 16: Earnings and Dividends
Earnings and Dividends On-Going EPS History Since 2004 Dividend History Since 2004 $/share $/share 3.60 2.00 3.40 .1% .0 % $1.84 = 4 1.80 4 R $3.24 = 3.20 C AG $3.10 G R $1.71 $3.00 $2.97 $3.03 A $1.64 $1.64 C $1.58 3.00 1.60 $2.77 $1.50 2.80 $2.73 $1.40 $1.42 2.60 1.40 $2.33 2.40 1.20 2.20 2.00 1.0
Slide 17: Long-term EPS Growth Rate
Long-term EPS Growth Rate 4-6% EPS growth 2012-14 – Average annual capital spend between $2.9-3.4B Average Annual EPS Growth – Utility platform replacement capital defined over two periods of about $1.4B (annual depreciation) – Growth in rate base of $1.5-2.0B Period of 4-6% average per year, allo
Slide 18: AEP Highlights
AEP Highlights Regulated Electric Utility – Regulatory and economic diversity – Operating Company Model Focus on Capital Allocation – Capital for Growth – Return of Capital to Shareholders Strong Balance Sheet – Stable credit ratings – Capital plan supported by cash flow – Strong liquidity pos
Slide 19: Appendix
Appendix 19
Slide 20: Detailed Ongoing Earnings Guidance
Detailed Ongoing Earnings Guidance 2010A: $3.03 2011E: $3.00 - $3.20 American Electric Power Financial Results for 2011 Guidance vs 2010 Actual 2010 2011 Actual Guidance Performance Driver ($ millions) Performance Driver ($ millions) UTILITY OPERATIONS: Gross Margin: 1 East Regulated Integrated Util
Slide 21: 2011 Earnings Drivers
2011 Earnings Drivers $3.50 $3.10 $3.03 0.32 $3.00 0.10 0.06 0.01 0.05 (0.22) (0.08) $2.50 (0.07) (0.05) (0.05) $2.00 $1.50 $1.00 $0.50 $0.00 Weather Other Utility Ohio OSS, net of Non-Utility Trans O&M, net of SEET Load Rate 2011E 2010A Costs, net Switching sharing / Parent Operations offsets Recov
Slide 22: Normalized Load Trends
Normalized Load Trends AEP Residential Normalized GWh Sales AEP Commercial Normalized GWh Sales %Change vs. Prior Year %Change vs. Prior Year 15% 15% 10% 10% 5% 5% 2.1% 1.3% 2.0% -0.3% 0.6% 1.9% 0.7% 0% 0% -1.2% -0.3% -0.4% -1.6% -1.6% -5% -5% 1Q10 2Q10 3Q10 4Q10 2010A 2011E 1Q10 2Q10 3Q10 4Q10 2010
Slide 23: Cash Flow Guidance
Cash Flow Guidance $ in millions 2010A 2011E Cash From Operations Income from Continuing Operations $ 1,218 $ 1,499 Depreciation & Amortization 1,641 1,611 Pension Funding (500) (150) Other Cash Flow Items 659 834 Litigation Resolution 1 - (449) Working Capital 2 279 7 Cash From Operations $ 3,297 $
Slide 24: Capitalization & Liquidity
Capitalization & Liquidity 70% Total Debt/Capitalization Current Liquidity Summary 65% Liquidity Summary Actual 62.5% (unadited) 12/31/10 60.7% ($ in millions) Amount Maturity 59.1% 59.1% Revolving Credit Facility $1,500 Jun-13 60% Revolving Credit Facility 1,454 Apr-12 57.2% 57.2% 57.0% 1 Revolving
Slide 25: Environmental Project Status Report
Environmental Project Status Report MW Plant Name Capacity SCR Status FGD Status East Plants Amos 1 800 In-service In-service Amos 2 800 In-service In-service Amos 3 1300 In-service In-service Big Sandy 2 800 In-service Cardinal 1 600 In-service In-service Conesville 5 375 In-ser
Slide 26: Rate Changes
Rate Changes $700 Pending/Future $600 $500 Secured $ in millions $400 $659 $300 $527 $235 $450 $35 $200 $352 $329 $100 $200 $0 2006A 2007A 2008A 2009A 2010A 2011E Note: Rate changes in this chart exclude revenues with offsetting costs Pending/future rate cases includes amounts from the Ohio environm
Slide 27: Summary Rate Case Information
Summary Rate Case Information AEP Ohio Distribution Rate Case – Docket #351/352-EL-AIR On February 28, 2011, AEP Ohio filed a distribution base rate case with the Public Utilities Commission of Ohio requesting a net increase of $93.8 million, and requesting authority to recover previously approved r
Slide 28: Summary Rate Case Information
Summary Rate Case Information APCo Virginia Base Rate Case On March 31,2011 APCo filed an update to its pre-biennial base rate case for recovery of generation and distribution costs requesting an increase of $75 million ($126 million total increase less $51 million deferral of depreciation increase)
Slide 29: Approved Rate Bases & ROEs
Approved Rate Bases & ROEs Jurisdiction Rate Base Approved ROE Approved Debt/Equity Effective Date APCo-Virginia * 10.53% 58/42 8/1/2010 $2,060MM APCo-West Virginia $1,656MM 10.50% 57/43 7/28/2006 KPCo-Kentucky $995MM 10.50% 57/43*** 6/30/2010 I&M-Indiana $2,000MM 10.50% 44/56 3/4/2009 I&M-Michigan
Slide 30: Summary of ESP Filing - Continued
Summary of ESP Filing - Continued Pre-tax earnings impact from proposed ESP (excluding potential earnings impact from trackers) Net base $54MM or 1.4% in year 1 (2012) Net base $106MM or 2.7% in year 2 (2013) 2012 2013 2014 Revenue $/MWh % Revenue $/MWh % Revenue $/MWh % Proposed ESP Changes B
Slide 31: Price to Compare
Price to Compare Proposed SSO Rates Redesigned To Resemble Market Pricing Structures 100 90 80 $/MWh 70 60 50 40 CSP RS OP RS CSP GS1 OP GS1 CSP GS2 OP GS2 CSP GS3 OP GS3 CSP GS4 OP GS4 Tariff Class 2012 Rates before ESP 2012 ESP Rates 2013 ESP Rates Rates do not reflect mitigation impact of market
Slide 32: Market Transition Rider – Mitigates the Initial Impact of Rate Realignment
Market Transition Rider – Mitigates the Initial Impact of Rate Realignment Three‐Year Market Transition Plan Summary of AEP Ohio ESP Generation Rate Changes Illustration of Market Transition Rider on ESP Generation Rate CSP Current CSP New Increases Customer Class Customer Class 2012 Increase 2013 I
Slide 33: List of ESP Riders – Existing and Proposed
List of ESP Riders – Existing and Proposed Line Rate Mechanism Abbreviation Bypassable Distribution Notes 1 Current Riders 2 Universal Service Fund Rider USF -- Yes 3 Advanced Energy Fund Rider AEF -- Yes Expired 12/31/2010 4 kWh Tax Rider kWh Tax -- May be self-assessed under specific terms 5 Provi
Slide 34: Ohio Timeline
Ohio Timeline Distribution Recovery & ESP FAC Case Risk Mitigation Regulatory Activity 1Q10 2Q10 3Q10 4Q10 1Q11 2Q11 3Q11 4Q11 1Q12 2Q12 3Q12 4Q12 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Merger of
Slide 35: Texas Transmission Growth Strategy: Near Term Investment
Texas Transmission Growth Strategy : Near Term Investment Ownership Structure: 50/50 (AEP/MidAmerican Energy Holding Company) Total Project Cost: Over $3 Billion Growing Rate Base: Current rate base is $412 million; expected to grow as follows: 2011: $473 million 2012: $778 million 2013: $1,352 mill
Slide 36: Transco Update
Transco Update Filing Status Update: Ohio (filed and approved) – PUCO approved the Ohio Transco December 29, 2010 West Virginia (filed) – Procedural schedule is set, with company testimony filed January 6; Intervenor's testimony is due April 6 and rebuttal is due April 20; Hearings in June Ark
Slide 37: Transmission (Transco/JV's) – Capital/Earnings Profile
Transmission (Transco/JV’s) – Capital/Earnings Profile Transco and JV’s have the potential to significantly add earnings growth to AEP. Cumulative Capital Spending, 5 After Ownership Division ($M) Annual Earnings Potential ($M) $7,000 $350 High Case 1 2 $6,000 AEP Transco $300 3 PATH + Prairie Wind
American Electric Power Company — Midwest Utilities Conference 2011 on 6ix