Mol Hungarian Oil & Gas Plc Class A · BET:MOL

Mol Hungarian Oil & Gas Plc Class A — MOL Group — Technical Presentation

17 slides from Mol Hungarian Oil & Gas Plc Class A's technical presentation

  1. Slide 1: Unconventional exploration as a way of organic growth in Upstream

    Unconventional exploration as a way of organic growth in Upstream

  2. Slide 2: Resource Pyramid

    Conventional Reservoirs Small volumes that are easy to develop Unconventional Large volumes diffic 6 to develop an Shales . Oily a Improved technology MOL GROUP 2

  3. Slide 3: Strategic joint venture with ExxonMobil in Hungarian unconventional exploration

    Strategic joint venture with ExxonMobil in Hungarian unconventional exploration MOL-ExxonMobil strategic joint venture relies on synergies based on: UNCONVENTIONAL BASINS IN HUNGARY ► MOL’s understanding of local geology ExxonMobil-MOL ► MOL’s acreage position in the Mako Derecske Strategic Joint Ve

  4. Slide 4: Technical program of the joint venture in Makó trough area

    Technical program of the joint venture in Makó trough area ► Joint Technical Study prepared for MOL 107 Makó and Békés basins EXPLORATION BLOCK ► Based on the promising results of MOL (50%) – FALCON MINING ExxonMobil (50%) the JTS MOL-ExxonMobil decided to PLOT agreement Retained by launch an explor

  5. Slide 5: Uncertainty / Project Evaluation

    Project Evaluation 2-4 years 2 years 30 years ► Exploration Appraisal Exploration Appraisal ► Reduce uncertainty on HC resource Resource delineation distribution Seismic and drilling activity ► Reservoir producibility Stop / Go Exit the project ► Development Pilot ► Select development Development Pi

  6. Slide 6: Makó Trough work program

    MAKÓ WEST AREA Makó Trough work program Committed Exploration Work Program based on MOL- ExxonMobil Joint Technical Study Field Development and Goal: Prove commerciality of production Stop / Go Piloting Production • Drilling 4-6 new wells • Testing, fracturing wells Exit the project 2009 2012 2008 2

  7. Slide 7: Requirements for Petroleum Accumulation

    Requirements for Petroleum Accumulation rock containing original organic matter is a source rock: 80% of the world's sedimentary rock volume 1% to 2% organic matter less than 1%, is able to undergo migration out of the source bed to accumulate within a porous and permeable reservoir. Source: IHRDC I

  8. Slide 8: Requirements for Petroleum Accumulation

    Requirements for Petroleum Accumulation Material originated from different kinds of living organisms, with different kinds of biological molecules, kerogens will not all have the same chemical compositions and will yield different types and amounts of petroleum. Source: IHRDC IPIMS.ep 8

  9. Slide 9: Conventional reservoirs

    Conventional reservoirs Oil Well @ XL Gas Well Source Rocks Migration Paths Reservoir Trap Cap Rock/Seal oF ON = Generation Intensity Immature Zone Temperature (°C) > MOL GROUP

  10. Slide 10: Unconventional tight gas – Basin Centered Gas Accumulation

    Unconventional tight gas – Basin Centered Gas Accumulation (Pollastro and others, 2003) 10

  11. Slide 11: Basin Centered Gas Accumulation – Makó trough

    Basin Centered Gas Accumulation – Makó trough Conventional Accumulations Gas Maturity Potential Reservoir Intervals Unconventional Accumulation Source Intervals (Source: Horvath) 11

  12. Slide 12: Basin Centered Gas Accumulation – Makó trough

    Basin Centered Gas Accumulation – Makó trough ► Source Intervals ► Reservoir Intervals Algyo Field ► Present Gas maturity window ► Conventional HC accumulation ► Potential Unconventional HC Accumulations 12

  13. Slide 13: ExxonMobil’s Multiple Zone Stimulation Technology

    ExxonMobil’s Multiple Zone Stimulation Technology Piceance Basin, Colorado, USA

  14. Slide 14: SPE – PRMS Classification system

    SPE – PRMS Classification system Field Development Risk Discovery Geological Risk

  15. Slide 15: Initial assumptions on resource distribution of the Makó Trough

    Initial assumptions on resource distribution of the Makó Trough Field Development ► Continuous field It would require ~2000 wells to Approximately 50 wells can be Discounted payback period of produce all hydrocarbons from drilled in one year in our development a well is 2-3 year Makó area current kn

  16. Slide 16: Economic valuation – main assumptions

    Economic valuation – main assumptions Cost Estimates ► Surface facilities: USD 22-28 million + USD 6-11 million/year ► OPEX: USD 2-3/boe ► Well cost: USD 8-12 million Comparison of Single Producer wells in the Makó Trough Area Well Cost Depth ► Unconventional wells vs. conventional are Conventional

  17. Slide 17: Unconventional exploration as a way of organic growth in Upstream

    Unconventional exploration as a way of organic growth in Upstream ► Unconventional resources play an increasing role in worldwide hydrocarbon production, mainly due to pricing and technical developments ► In Hungary, due to pricing and regulatory issues, the time has just come to start to put seriou