  1. Slide 1: Yara Improvement Program

    Yara Improvement Program Investor and analyst visit to Sluiskil 12 December 2017

  2. Slide 2: Agenda

    Agenda Timing Agenda Presenter 08:00 AM – 08:15 AM Welcome & introductions Thor Giæver / Svein Tore Holsether 08:15 AM – 08:30 AM Introduction to Model Factory Hannah Paulson 08:30 AM – 09:15 AM Model Factory: Round One 09:15 AM – 09:55 AM YPS Overall (inc. debrief of model factory) Kristin Kaggerud

  3. Slide 3: Safety

    Safety Emergency exit Evacuation meeting point Safety station location Personal protective equipment (PPE) expectations

  4. Slide 4: Productivity video

    Productivity video

  5. Slide 5: Overview of JLW Industries

    Overview of JLW Industries Context • JLW Industries is a mid-size producer of beverages within the JLW group • Its main products are different variations of lemonade and cola which require different additional ingredients, e.g. vanilla essence • These goods are produced in one batch production line

  6. Slide 6: Participants for JLW Industries

    Participants for JLW Industries • We need eight volunteers to run the factories. • In each factory, there will be three operators and one supervisor. • Please put on the coats and PPE provided if you are operating in the factory. • Those who are not operating the factory will need to act as observer

  7. Slide 7: Mining video

    ee ~ ¥ "Ein . tigi Fann =

  8. Slide 8: Review of the first shift

    Review of the first shift From your observation and/or experience in the last shift 1 What went well? 2 What challenges did you observe? 3 Which improvement ideas do you have? 4 How would you go about implementing them?

  9. Slide 9: Yara Productivity System: A significant part of overall Yara Improvement Program target

    Yara Productivity System (YPS): A significant part of overall Yara Improvement Program target USD million, vs. 2015 baseline and 2015 prices 500 ~450 ~30%  Production volume Sustained EBITDA ~300 ~15% Consumption factor  improve- ment ~150 ~30% Variable unit cost  ~25% Fixed cost  2017 2018 2019

  10. Slide 10: Yara Productivity System: Six interdependent and interlinked improvement workstreams

    Yara Productivity System: Six interdependent and interlinked improvement workstreams Strategic response Description Address safety, customer responsiveness, reliability, cost, productivity and 1 YPS Rollout quality on our sites as well as the ability to assess and integrate acquired assets -Focus to

  11. Slide 11: Selected highlights from the YPS roll-out

    Selected highlights from the YPS roll-out YPS roll-out will have reached 50% of the sites by year end • YPS will be rolled out at 27 sites by completion • YPS roll-out completed at seven sites, eight sites are currently being transformed • First mining site being transformed • Diagnostic completed a

  12. Slide 12: Yara Productivity System: Results being delivered in practice

    Yara Productivity System: Results being delivered in practice Five out of seven plants since initial rollout completed, with 12MR In addition, several monthly production production RECORDS either in September or October ’17 records in November’18 TOTAL VOLUMES 12 month rolling - adjusted for Planned

  13. Slide 13: YPS: One of the largest operational transformations in Norwegian industrial history

    YPS: One of the largest operational transformations in Norwegian industrial history To date … By the time rollout complete … 350 change 3,700 man-days of rollout support leaders trained and active 1040 hours of bootcamps and 1,000 managers leadership training directly involved 800 man-days of diagno

  14. Slide 14: YPS is our framework for continuous improvement

    YPS is our framework for continuous improvement – Developed across three dimensions The way physical Technical assets and resources The formal structures, system Management are configured and processes, and optimized to create system Systems through which value and minimize the operating Systems los

  15. Slide 15: YPS standard tool box to eliminate waste

    For all dimensions we have a YPS standard tool box, all helping to eliminate waste How? Engaging all employees to identify improvement Performance management opportunities and eliminate waste Identifying the “best” way to execute a task, Standard operating procedures minimizing the impact of all was

  16. Slide 16: Most transformation efforts fail to deliver full impact

    Most transformation efforts fail to deliver full impact … mainly because culture change is not 70% of change programs fail … addressed fully Other obstacles 14 Inadequate resources or budget 14 % of Management efforts behavior failing to 33 does not 30 achieve 70 support change target Organizational

  17. Slide 17: Mindset and cultural change is the real challenge

    Mindset and cultural change is the real challenge, but is what ultimately determines success Denial Commitment Fear Acceptance Explore Mood Anger Depression Time Adapted from Elisabeth Kubler-Ross

  18. Slide 18: YPS roll-out

    Updated December 2017 YPS roll-out Sep Dec Jan Mar May Jul Oct Dec Jan Mar Apr Jun Aug Oct Dec ‘16 ‘16 ‘17 ‘17 ‘17 ‘17 ‘17 ‘17 ‘18 ‘17 ‘18 ‘18 ‘18 ‘18 ‘18 Sluiskil Rio Grande Porsgrunn transformations Big sites Uusikaupunki Trinidad & Tringen Galvani - Paulina I + II Belle Plaine Pilbara QAFCO Small

  19. Slide 19: Belle Plaine Performance Review Video

    Belle Plaine Performance Review Video 19

  20. Slide 20: Performance management cycle

    Performance management cycle Schedule “What we Standards “How we need to do” operate” Plan “Take action on “Produce the ideas to improve product” production” Act Do Check “Brainstorm ideas “Discuss how to improve” well we did”

  21. Slide 21: An effective performance management system is driven by 3 interlinked elements

    An effective performance management system is driven by 3 interlinked elements 1 Measure performance (KPI) 2 Effective Visualize performance performance management 3 Review performance 21

  22. Slide 22: Frontline performance reporting is visibly displayed and easy to maintain

    Frontline performance reporting is visibly displayed and easy to maintain Accessible Clear Pilbara Target driven Simple Recordable Kokkola

  23. Slide 23: Performance is reviewed with the mindset of continuous improvement

    Performance is reviewed with the mindset of continuous improvement Review 1 Are any KPIs off target? 2 What is causing this? Improve Brunsbuttel 3 How can we fix this? 4 Who will do it? Implement When will 5 they complete it by? Pilbara

  24. Slide 24: Siilinjärvi: Taking a step back prior to SOP definition cuts cool down time

    Silinjarvi: Taking a step back prior to standard operating procedure definition cuts time to cool down of hot electrostatic precipitator by up to 65% Performance board at Silinjarvi Sulphuric Acid plant 24

  25. Slide 25: BCF-in-a-box video

    BCF-in-a-box video 25

  26. Slide 26: Review of the second shift

    Review of the second shift From your observation and/or experience in the last shift 1 What went well? 2 What challenges did you observe? 3 Which improvement ideas do you have?

  27. Slide 27: YPS standard tool box – All helping to eliminate waste

    For all dimensions we have a YPS standard tool Management system Technical system box – All helping to eliminate waste People system How? Engaging all employees to identify improvement Performance management opportunities and eliminate waste Identifying the “best” way to execute a task, Standard ope

  28. Slide 28: Yara Sluiskil

    Yara Sluiskil General presentation

  29. Slide 29: History

    History A company with a rich history, rooted in the region

  30. Slide 30: Yara Sluiskil 1929 - 2016

    Yara Sluiskil 1929 - 2016 1929 Start production Ammoniumsulphate 1940 During World War II huge destructions by bombings. Restart 1950 1966 Switch from cokes gas to natural gas 1979 Development and practice of fluidized bed granulator technology 1979 Aquisition by Norsk Hydro ’80 –’90 Big investments

  31. Slide 31: Key-indicators

    Key-indicators Knowledge grows…

  32. Slide 32: Yara Sluiskil TRI-rate 12 months rolling

    Yara Sluiskil. TRI-rate 12 months rolling. 10 9 8 7 6 5 4 3 2 1 0 2009 2010 2011 2012 2013 2014 2015 2016 2017 32

  33. Slide 33: Key-indicators

    Key-indicators 677 575 5,027 2.0 million euro FTE kiloton product in BCM Yara Turnover in 2016 loaded in 2016 natural gas/yr Ammonia World record in Nitrates reliability 80% Industrial products as feedstock 15% TOTAL PRODUCTION VOLUME OF YARA

  34. Slide 34: Products and processes

    Products and processes ° ° ° ° ° les °o ¢ e ° ° e ° e ‘ e ° 6 e ? eo Or Oo) Ee. .° eed) e @ OC wm Poe Seo ° 0 © £90005 0 9.9 ) ° o © 0008 oo ° e o00°* Oey e CAAT ° iS Be 00 ° ° e ° ° ee ° Oo e @o

  35. Slide 35: Our production system at Yara Sluiskil

    Our production system at Yara Sluiskil 35

  36. Slide 36: Modal split (2016)

    Modal split (2016) Rail Truck 799.186 ton (16%) 91.837 ton (2%) Barges Seagoing 1.145.626 ton (23%) vessels 2.990.579 ton (59%) 947 barges 627 seagoing vessels 1.232 rail wagons 31.087 trucks 36

  37. Slide 37: Innovation and sustainability

    Innovation and sustainability

  38. Slide 38: WarmCO2, Smart Delta Resources and Algae Biocleaning

    WarmCO2 -55.000.000 Nm3 natural gas/yr -135.000 ton CO2/yr 1.000 New jobs created Smart Delta Resources (SDR) Cooperation DOW, ICL, national authorities and Yara 40.000 ton CO2 reduction Strong industrial clustering Algae Biocleaning Pilot installation for cleaning of waste water. Cooperation with l

  39. Slide 39: Urea 7 solution, 2011 and Urea 8, 2017

    Urea 7 solution, 2011 420 mEuro investment 4.200 t/d (20% above design) -35%energy consumption Urea 8, 2017 240 mEuro investment S-urea specialities -50% dust emission 39

  40. Slide 40: Urea 8 expanding value-add production capacity in Sluiskil

    Urea 8 expanding value-add production capacity in Sluiskil  New urea granulator with capacity of 660 kt per year, replacing old prilling unit with capacity of 400 kt per year  Granulator will produce urea with sulphur, a product sold with a premium to regular urea  Granulation will be done in a f

  41. Slide 41: YPS implementation and status

    YPS implementation and status

  42. Slide 42: Plant visit

    Plant visit Safety introduction for visitors

  43. Slide 43: Do's and don'ts

    Do’s and don'ts (only allowed in (where indicated) specific smoking room/area) Obligated on whole plant area Extra during works Extra PPE needed when pass by (wear also long sleeves) production zones indicated by ‘blue lines’ 43

  44. Slide 44: Alarm

    Alarm • Be calm and stay with your yara guide • Tuesday 10:00 o’clock weekly test 44