  1. Slide 1: June Quarter FY26 Presentation

    For personal use only ASX:CXO June Quarter FY26 Presentation 15 July 2026

  2. Slide 2: Important and Cautionary Notes

    IMPORTANT AND CAUTIONARY NOTES This presentation has been prepared by Core Lithium Ltd (“Core”, “Company”) and provides a general “Updated Ore Reserve at Carlton” on 10 September 2025 and “Updated Grants Mine Plan and Ore overview of the Company and its strategy. Reserve” on 10 November 2025. The Co

  3. Slide 3: June Quarter Highlights

    JUNE QUARTER HIGHLIGHTS Momentum building with key operational milestones delivered For personal use only Corporate Operations Logistics Growth > Strong financial position with > All major mining contracts > Commissioned and fully > Blackbeard exploration $182 million of cash at 30 awarded for Grant

  4. Slide 4: Finniss Lithium Operation

    FINNISS LITHIUM OPERATION A low cost, long life operation - strategically located and fully funded to production > First shipment of newly produced product from Grants on track for December quarter providing near term cash flows in addition to funding package Near-term For personal use only > Existi

  5. Slide 5: On Track for Steady State Production in 2028

    ON TRACK FOR STEADY STATE PRODUCTION IN 2028 Moving from funding and mobilisation into execution and staged operational ramp-up Q2 Q3 CY2026- Mid Mid For personal use only 18 March Q2 Q4 2026 CY2026 CY2026 CY2026 CY2026 CY2027 CY2027 CY2028 Grants open Key mining Plant re- First BP33 pre- BP33 BP33

  6. Slide 6: Grants

    GRANTS Significant progress made at Grants open pit since FID For personal use only April 2026 June 2026 April 2026 May 2026 June 2026 Dewatering and preparation of Grants open pit ahead of recommencement of mining Mining commenced Mining ongoing 6

  7. Slide 7: Mining Underway at Grants

    MINING UNDERWAY AT GRANTS Commencement of mining a key milestone in the restart of Finniss For personal use only > Grants provides a low-strip, near-term ore source supporting early cash generation in addition to funding package sources > Mining underway following award of 11-month surface mining co

  8. Slide 8: Processing Plant Upgrades

    PROCESSING PLANT UPGRADES Targeted upgrades to improve performance underway - processing commencing in the September quarter > Plant upgrades aligned to mine plan, increasing plant throughput to 1.2Mtpa from For personal use only 1.0Mtpa1 > Targeted brownfields modifications planned to improve liber

  9. Slide 9: Significant Progress at BP33 Project

    SIGNIFICANT PROGRESS AT BP33 PROJECT Box cut dewatering and remediation progressed ahead of portal cut For personal use only March 2026 May 2026 June 2026 Dewatering Remediation Portal cut 9 1. Refer to the Company's ASX announcements titled "BP33 Underground Portal Commencement and First Shipment"

  10. Slide 10: Executing on BP33 Project

    EXECUTING ON BP33 PROJECT Rapid rate of development execution with underground development commenced > Underground mining contract awarded to For personal use only Develop Global Ltd (ASX:DVP), for a term of three years, plus option for a two-year extension1 > BP33 contract award validates the resta

  11. Slide 11: Fully Funded for Production

    FULLY FUNDED FOR PRODUCTION Strong liquidity position and additional funding available through to production For personal use only $M 320 320 > Ample available funds to fund development through to 35 3 steady state production Liquidity 127 buffer > $193 million of restart capital with contingency re

  12. Slide 12: Finniss Exploration Upside

    FINNISS EXPLORATION UPSIDE Drilling program commenced targeting a maiden MRE at highest priority growth prospect, Blackbeard > 2026 exploration program commenced targeting the Blackbeard prospect For personal use only > Objective to progress Blackbeard toward a maiden Mineral Resource Estimate over

  13. Slide 13: Production Expansion Potential

    PRODUCTION EXPANSION POTENTIAL1,2 Resource growth and potential for plant expansion support increasing scale over time >2Mtpa crushing capacity supports a pathway to For personal use only Plant Throughput Capacity (Mt) lift plant throughput above 1.2Mtpa with incremental plant upgrades Expansion pla

  14. Slide 14: Executing to Plan

    EXECUTING TO PLAN Significant progress made in June quarter with operational momentum building Mobilisation Major mining and Near-term Grants Fully funded Pathways to complete and BP33 civils and production and cash through to steady potential resource For personal use only operations and infrastruc

  15. Slide 15: Contact

    For personal use only This presentation has been approved for release by the Core Lithium Board CONTACT Core Lithium Ltd Level 4, 186 St Georges Terrace, Perth WA 6000 info@corelithium.com.au Investor Enquiries Media Enquiries Paul Brown Cameron Morse Managing Director FTI Consulting +61 8 8317 1700

  16. Slide 16: Appendix – JORC Mineral Resource Estimate

    APPENDIX 1 – JORC MINERAL RESOURCE ESTIMATE Measured Indicated Inferred Total For personal use only Mineral Resource Li2O Li2O Li2O Li2O Tonnes Tonnes Tonnes Tonnes Li2O% Contained Li2O% Contained Li2O% Contained Li2O% Contained (Mt) (Mt) (Mt) (Mt) Metal (kt) Metal (kt) Metal (kt) Metal (kt) Grants

  17. Slide 17: Appendix – JORC Ore Reserve Estimate

    APPENDIX 2 – JORC ORE RESERVE ESTIMATE Ore Tonnes Contained Notes Deposit Category Li2O (%) (Mt) Li2O (kt) 1. Effective date of the Grants Ore Reserves is 30 October 2025. For personal use only Proved 2.6 1.27 32 2. Effective date of the Carlton Ore Reserves is 5 September 2025 (“Updated Ore Reserve