TransGlobe Energy Corporation

TransGlobe Energy — Investor Presentation (January 2016)

23 slides from TransGlobe Energy's investor presentation, January 2016

  1. Slide 1: TransGlobe Energy Corporate Presentation January 2016

    TRANSGLOBE ENERGY CORPORATE PRESENTATION JANUARY 2016

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation may include certain statements that may be deemed to be “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Such statements relate to possible future events. All statements other than statements of histo

  3. Slide 3: About TransGlobe

    ABOUT TRANSGLOBE Operations in Egypt began in 2004 • Currently 100% of production Proven track record with extensive Alexandria International experience Suez Cairo Extensive and diversified portfolio of development and exploration opportunities Focused on building a diversified Egypt International p

  4. Slide 4: Undervalued with Balance Sheet Strength

    UNDERVALUED WITH BALANCE SHEET STRENGTH CAPITAL STRUCTURE (US$) Shares Outstanding (01/06/16) ~72.2 Million  Holding cash of $126.9 Market Capitalization (01/06/16) $122.7 Million MM or ~$1.76/share Debt (30/09/15) $65.7 Million  Paid $0.025/share Working Capital (30/09/15) $166.2 Million dividend

  5. Slide 5: Q3 Financial Review

    Q3 FINANCIAL REVIEW Sales volumes averaged 13,620 Bopd in Q3-2015, increased inventory of entitlement crude to 350,869 bbls Negative funds flow of $1.5MM ($0.02/share-diluted) Net Loss of $46.6MM ($0.65/share-diluted) $3.6MM spent on capital projects $42.6MM collected from EGPC, A/R balance reduced

  6. Slide 6: Oil Marketing

    OIL MARKETING • Marketing has improved liquidity, EGPC AR Outstanding decreased credit risk and resulted $250,000 $200,000 in West Bakr production being $150,000 sold at market price $100,000 • TransGlobe marketed and sold $50,000 $0 1,601,038 barrels during the first three quarters of 2015 • Most r

  7. Slide 7: Netback Sensitivity to Oil Prices

    NETBACK SENSITIVITY TO OIL PRICES 20.00 $16.43 15.00 $13.82 Increases to oil prices have a greater impact on netbacks in a low price environment $10.40 Netback 10.00 $5.82 5.00 $1.18 0.00 $40.00 $50.00 $60.00 $70.00 $80.00 Brent Oil Price Per Bbl Assumptions: • Total Company production equal to Q3-2

  8. Slide 8: Current Daily Production

    CURRENT DAILY PRODUCTION TRANSGLOBE TOTAL DAILY 20,000 Production (bopd) 15,000 10,000 Block 32 Block S-1 5,000 East Ghazalat West Bakr West Gharib 0 Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Q4 ESTIMATE – Q2 – 15,064 BOPD Q3 – 14,683 BOPD ~13,400 BOPD 8

  9. Slide 9: 2016 Capital Guidance

    2016 CAPITAL GUIDANCE TransGlobe Net Capital ($MM) Gross Well Count Concession Development Exploration (Wells) Total Wells Maint Projects Wells Bonus Seismic Devel Expl Total West Gharib $ - $ 3.5 $ 2.5 $ - $ - $ - $ 6.0 - - - West Bakr $ 4.5 $ 3.6 $ 2.1 $ - $ - $ - $ 10.2 3 - 3 NW Gharib $ - $ - $

  10. Slide 10: Investment Highlights

    INVESTMENT HIGHLIGHTS 1.5 Million gross acres of land • 2016 Exploration focus  8 Projects in Egypt  In Eastern Desert, drill up to 22 exploration prospects Strong balance sheet with net working  In Western Desert, interpret new 3-D in South capital of $166.2 MM (30/09/15) Ghazalat and prepare fo

  11. Slide 11: Eastern Desert Exploration Program

    EASTERN DESERT EXPLORATION PROGRAM Red Bed Prospects • 8 prospects (COS 17% avg) • 4-12 mmbbls prospective resource** Miocene Clastic Prospects • 8 prospects (COS 32% avg) • 2-8 mmbbls prospective resource** Pre-Rift Prospects • 6 prospects (COS 18% avg) • 2-6 mmbbls prospective Eastern Desert explo

  12. Slide 12: West Gharib: 100% WI - Operated

    WEST GHARIB: 100% WI - OPERATED Production • Q3-2015 – 8,520 Bopd 2016 Plan • Water flood optimization at Hana/Hana West • Several smaller development projects at Arta and Hoshia to improve recoveries • Maintenance projects (water handling, etc.) to optimize production and reduce costs 12

  13. Slide 13: NW Gharib: 100% WI - Operated

    NW GHARIB: 100% WI - OPERATED 16 3 2 2016 Plan • Progress three (NWG #1, #3 & #5) 14 oil developments toward first 1 production in late 2016 • ~1,500-2,000 Bopd initial production potential* • Drill up to 13 new exploration 5 prospects * Internally estimated 13

  14. Slide 14: West Bakr: 100% WI - Operated

    WEST BAKR: 100% WI - OPERATED H Production • Q3-2015 - 5,760 Bopd M 2016 Plan K • Drill 3 new exploration wells in the south lobe of K field • Increased water handling at H & K stations to increase production/recoveries • Maintenance/development projects to optimize production and reduce costs * Int

  15. Slide 15: Eastern Desert Development - K South Plan

    EASTERN DESERT DEVELOPMENT-K SOUTH PLAN • South K OOIP: ~ 55 MMbo • Production to date: 5.8 MMbo (10.5% recovery) • Initial group of four locations identified and evaluated • Plan to drill 3 of the locations in 2016 • Principal target of all wells is Asl A sand • IP: 300-400 bopd* K South Asl A Top

  16. Slide 16: Egypt Assets: Western Desert

    EGYPT ASSETS: WESTERN DESERT • Three operated concessions • Acquired 400 km² 3-D in South Ghazalat during Q2-2015 16

  17. Slide 17: Western Desert Exploration - NW Sitra & S. Ghazalat

    WESTERN DESERT EXPLORATION – NW SITRA & S. GHAZALAT: 100% WI - OPERATED S. Ghazalat • Awarded in 2013 2016 Plan: • Map and prepare prospect inventory for 2017 drilling S. Ghazalat N.W. Sitra NW Sitra • Awarded in 2014 • Ratified January 2015 • 3-D seismic in late 2016/17 Total • Combined Concession

  18. Slide 18: South Ghazalat Seismic Dip Line

    SOUTH GHAZALAT SEISMIC DIP LINE Rift Margin Edge Several structures along rift margin • Excellent quality data from & Tertiary Seal U. Cretaceous 2015 3D acquisition • The rift margin is well imaged with good data to Jurassic U. Cretaceous Reservoirs level • Early work is showing several structures

  19. Slide 19: South Ghazalat Seismic Strike Line

    L. Jurassic U. Cretaceous U. Cretaceous Cretaceous Reservoirs & Tertiary Seal Reservoirs Reservoirs 19 SOUTH GHAZALAT SEISMIC STRIKE LINE L. Jurassic Cretaceous Reservoirs Reservoirs U. Cretaceous U. Cretaceous Reservoirs & Tertiary Seal

  20. Slide 20: Summary

    SUMMARY Opportunity Rich Attractive valuation Average Q4 production of ~13,400 Bopd $166MM positive working capital $126.9MM in cash @ Sept 30th, 2015 Growth potential with a large drilling campaign in 2016 and 2017 20

  21. Slide 21: Executives and Directors

    EXECUTIVES AND DIRECTORS • Robert G. Jennings - Director, Chairman • Ross G. Clarkson - Director, President and CEO • Lloyd W. Herrick - Director, VP and COO • Geoffrey C. Chase - Director • Fred J. Dyment - Director • Susan MacKenzie – Director • David Cook – Director • Bob MacDougall - Director •

  22. Slide 22: Analyst Coverage

    ANALYST COVERAGE • Christopher Brown, Canaccord Genuity, Calgary, Canada • David Popowich, CIBC, Calgary, Canada • David Phung, Credit Suisse Securities, Calgary, Canada • David Dudlyk, Dundee Capital Markets, London, UK • Darren B. Engels, First Energy Capital Corp., Calgary, Canada • Ian Macqueen,

  23. Slide 23: Concession Summary

    CONCESSION SUMMARY Working Concession Size (acres) Year Concession First Production Concession Interest Gross Net Acquired Type Date West Gharib 100% 24,035 24,035 2007 Development January 2000 NW Gharib 100% 148,300 148,300 2013 Exploration N/A SW Gharib 100% 48,000 48,000 2013 Exploration N/A SE G

TransGlobe Energy — Investor Presentation (January 2016) on 6ix