Vault Minerals Limited · ASX:VAU

Vault Minerals — Technical Presentation (July 2025)

50 slides from Vault Minerals's technical presentation, Jul 31, 2025

  1. Slide 1: Leonora Operations Analyst & Investor Site Tour

    For personal use only Leonora Operations Analyst & Investor Site Tour July 2025 www.vaultminerals.com

  2. Slide 2: Important Notice and Disclaimer

    VAULT MINERALS | 2 Important Notice and Disclaimer Investor Presentation For personal use only Vault Minerals Limited ACN 068 647 610 has prepared this investor presentation based on information available to it at the time of preparing the presentation. No representation or warranty, express or impl

  3. Slide 3: Corporate overview

    VAULT MINERALS | 3 Corporate overview Vault Minerals Limited (ASX: VAU) Board of Directors Share price (30 July 2025) A$0.38 For personal use only Russell Clark Luke Tonkin Rebecca Prain Kelvin Flynn Non-Executive Chair Managing Director & Non-Executive Director Non-Executive Director Shares on issu

  4. Slide 4: Balanced, diverse portfolio across established mining jurisdictions

    VAULT MINERALS | 4 Balanced, diverse portfolio across established mining jurisdictions FY25 Gold Sales For personal use only 28% 385 50% koz 22% Ore Reserves1 15% 70% +3.9 Moz Au 7% Sugar Zone Ontario, Canada 8% (Development) Leonora Western Australia Mineral Resources1 (Producing) 30% Deflector Wes

  5. Slide 5: Leonora, Western Australia

    VAULT MINERALS | 5 Leonora, Western Australia For personal use only Enviable position in world class mining region ▪ 2.5hrs north of Kalgoorlie in Western Australia’s prolific “Northern Goldfields” region ▪ Town of Leonora serves as a regional hub, serviced by a major highway, airport, recreational

  6. Slide 6: Regional geological setting – prolific greenstone belt

    VAULT MINERALS | 6 Regional geological setting – prolific greenstone belt For personal use only Classic Archean Greenstone Belt Geology ▪ Archean greenstone-hosted gold deposit on the eastern margins of the Kalgoorlie Terrane (Eastern Goldfields Superterrane of Western Australia’s Yilgarn Craton) ▪

  7. Slide 7: King of the Hills – Leonora, Western Australia

    VAULT MINERALS | 7 King of the Hills – Leonara, Western Australia For personal use only

  8. Slide 8: Leonora, 12 months under Vault: Understand, improve, deliver

    VAULT MINERALS | 8 Leonora,12 months under Vault: Understand, improve, deliver First 12 months: Leonora reset – Complete For personal use only Identify key focus areas/value drivers from acquisition due diligence Deliver updated Mineral Resource, Ore Reserves – including changes to estimation Delive

  9. Slide 9: Leonora – Long-life asset poised for growth

    VAULT MINERALS | 9 Leonora – Long-life asset poised for growth For personal use only Demonstrable scalability and expandability ▪ Largest, lowest cost processing facility1 in the Northern Goldfields ▪ 18 year+ baseload feed from KoTH open pit adjacent to the processing facility supplemented by high-

  10. Slide 10: Leonora: Long life production base with multiple ore sources

    VAULT MINERALS | 10 Leonora: Long life production base with multiple ore sources …feeding the largest, lowest cost and most scalable processing plant in the region1 For personal use only KoTH Open Pit ▪ 2.2 million ounces Ore Reserve adjacent to KoTH mill KoTH Processing Facility ▪ Multiple stages p

  11. Slide 11: King Of The Hills (KoTH) open pit

    VAULT MINERALS | 11 King Of The Hills (KoTH) open pit For personal use only

  12. Slide 12: KoTH OP: Overview

    VAULT MINERALS | 12 KoTH OP: Overview Contract Summary For personal use only Contractor Macmahon Contract Type Schedule of rates Contract Term 5yrs (commenced Jan 2022, expiry Dec 2026) Primary Mining Method Conventional open cut load and haul Personnel (Total KoTH) Vault 150 Contract Personnel 317

  13. Slide 13: KoTH OP: Dependable baseload feed

    VAULT MINERALS | 13 KoTH OP: Dependable baseload feed KoTH OP – Mined Ore/Grade KoTH OP – Waste Mined/Indicative Strip Ratio For personal use only 800,000 0.9 3,500,000 7.0 700,000 0.8 Indicative Strip Ratio (W:O) 3,000,000 6.0 600,000 0.7 Mined Grade (g/t) Waste -Tonnes 0.6 2,500,000 5.0 500,000 Or

  14. Slide 14: KoTH OP: Updated Mineral Resource – Full first principles remodel

    VAULT MINERALS | 14 KoTH OP: Updated Mineral Resource – Full first principles remodel KoTH open pit Mineral Resource at 30 April 2025 For personal use only ▪ Updated KoTH open pit Mineral Resource is 116 million tonnes at 0.91 g/t for 3.4 million ounces of gold. ▪ The updated open pit Mineral Resour

  15. Slide 15: KoTH OP: Updated Ore Reserve – Larger, longer life operation

    VAULT MINERALS | 15 KoTH OP: Updated Ore Reserve – Larger, longer life operation1 KoTH open pit Ore Reserve at 30 April 2025 For personal use only ▪ The updated open pit Ore Reserve of 110 million tonnes at 0.61 g/t for 2.2 million ounces is based on a 0.23 g/t cutoff grade, compared with the 0.33 g

  16. Slide 16: KoTH: Understand, improve, deliver – drill and blast

    VAULT MINERALS | 16 KoTH: 12 months under Vault: Understand, improve, deliver For personal use only Drill and blast: Taking control of key functions ▪ Drill and blast performance has been a key focus of open pit mining improvements post merger, with management of dilution and ore loss critical in th

  17. Slide 17: KoTH: Leveraging a large, long-life orebody

    VAULT MINERALS | 17 KoTH: Leveraging a large, long-life orebody Larger, more valuable operation provides 18 years of baseload ore feed at Leonora1 For personal use only Current open pit surface Current underground voids Final open pit design (Stages 1 to 5) Resource shell (AU$4,500/oz) Final undergr

  18. Slide 18: KoTH: Leveraging a large, long-life orebody

    VAULT MINERALS | 18 KoTH: Leveraging a large, long-life orebody For personal use only 1. Topography, designs and figures as at 30 April 2025.

  19. Slide 19: KoTH: Open Pit Schedule

    VAULT MINERALS | 19 KoTH: Open Pit Schedule1 FY 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 For personal use only Stage 2 Stage 3 Stage 4 Stage 5 Scale, expandability ▪ Distribution of ounces between the stages provides valuable optionality, with the higher-strip stage

  20. Slide 20: KoTH: Remediation of the 2004 slip (northern pit)

    VAULT MINERALS | 20 KoTH: Remediation of the 2004 slip (northern pit) For personal use only Slip remediation considered as part of Stage 4 (~2029) ▪ Slip at the northern end of the pit occurred in 2004 (then known as Tarmoola under Sons of Gwalia Ltd ownership) ▪ Area continues to be closely monitor

  21. Slide 21: King Of The Hills underground

    VAULT MINERALS | 21 King Of The Hills underground For personal use only

  22. Slide 22: KoTH UG: Overview

    VAULT MINERALS | 22 KoTH UG: Overview For personal use only Contract Summary Contractor Macmahon Contract Type Schedule of rates Primary Mining Method Long hole open stoping with pillars Fleet Drill Fleet 2x Sandvik 421i Jumbos 1x Sandvik 431-15C Solo drill 1x Sandvik 421 Solo drill Load Fleet 2x Sa

  23. Slide 23: KoTH UG: Bulk-underground feed source

    VAULT MINERALS | 23 KoTH UG: Bulk-underground feed source KoTH Underground KoTH UG Gold Production Contribution For personal use only 300,000 2.50 80,000 70,000 250,000 2.00 60,000 Contained Gold (ozs) 200,000 Mined Grade (g/t) 1.50 50,000 Ore- Tonnes 150,000 40,000 1.00 30,000 100,000 20,000 0.50 5

  24. Slide 24: KoTH: Underground exploration delivering extensions beyond Resources

    VAULT MINERALS | 24 KoTH: Underground exploration delivering extensions beyond Resources Highly successful first phase program with 31 intersections >10 gram metres1 For personal use only ▪ Drilling from newly established W5000 drill drive to test for down plunge and down dip extensions to mineralis

  25. Slide 25: KoTH UG: GC drilling focus mostly complete

    VAULT MINERALS | 25 KoTH UG: GC drilling focus mostly complete For personal use only Central East Regal West Current mining areas and proposed FY26 GC drilling FY26 LOM As built

  26. Slide 26: KoTH UG: Allowing the focus to move to Resource definition

    VAULT MINERALS | 26 KoTH UG: ….Allowing the focus to move to Resource definition For personal use only Central East Regal West Current mining areas and proposed FY26 GC drilling inclusive of Resource definition infill FY27 LOM FY26 Resource Definition Infill FY26/27 LOM Grade Control FY26 LOM As bui

  27. Slide 27: KoTH UG: Significant step out drilling programs for FY26

    VAULT MINERALS | 27 KoTH UG: Significant step out drilling programs for FY26 For personal use only Package of approved drilling over FY26 designed to unlock future potential of KoTH UG ▪ Testing several “near-term” targets, particularly along the (poorly defined) extents of the granodiorite contact

  28. Slide 28: Darlot: Opportunity through the drill bit

    VAULT MINERALS | 28 Darlot: Opportunity through the drill bit For personal use only Darlot – Newest members of the fleet!

  29. Slide 29: Darlot: Overview

    VAULT MINERALS | 29 Darlot: Overview Operator Summary For personal use only Operator Vault Minerals – Owner operator Primary Mining Method Mechanised Long hole open stoping Personnel Vault 169 Contract Personnel 88 Fleet DRILL FLEET 1 - DD321 Sandvik Development Drill 1 - DD421 Sandvik Development D

  30. Slide 30: Darlot UG: Consistent high-grade sweetener

    VAULT MINERALS | 30 Darlot UG: Consistent high-grade “sweetener” For personal use only Darlot Underground Darlot UG Gold Production Contribution 250,000 3.5 80,000 3.0 70,000 200,000 2.5 60,000 Contained Gold (ozs) 150,000 50,000 2.0 Mined Grade (g/t) Ore- Tonnes 40,000 1.5 100,000 30,000 1.0 20,000

  31. Slide 31: Darlot: Drilling increases the scale of potential new mining fronts

    VAULT MINERALS | 31 Darlot: Drilling increases the scale of potential new mining fronts Recent drilling targeting Pipeline area to enhance the potential of new mining fronts1 For personal use only ▪ 15-hole program completed during Q3FY25, targeting infill and extension of Pipeline area ▪ Results in

  32. Slide 32: Darlot: Active mining areas with potential new Chappell/Pipeline area

    VAULT MINERALS | 32 Darlot: Active mining areas with potential new Chappell/Pipeline area For personal use only 1. Refer ASX Announcement 29 April 2025 “Quarterly Activities Report”

  33. Slide 33: Darlot: Pipeline area – Lodes open!

    VAULT MINERALS | 33 Darlot: Pipeline area – Lodes open! For personal use only 1. Refer ASX Announcement 29 April 2025 “Quarterly Activities Report”

  34. Slide 34: Leonora Processing

    VAULT MINERALS | 34 Leonora Processing For personal use only

  35. Slide 35: Milling Physicals/Performance

    Tonnes For personal use only Tonnes 100,000 200,000 300,000 500,000 400,000 600,000 0 100,000 200,000 300,000 400,000 500,000 600,000 0 Jul-23 Jul-23 Aug-23 Aug-23 Sep-23 Sep-23 Oct-23 Oct-23 Nov-23 Nov-23 Dec-23 Dec-23 Jan-24 Jan-24 Feb-24 Feb-24 Dry Tonnes Milled Mar-24 Mar-24 Ore Tonnes Crushed A

  36. Slide 36: Leonora Processing

    VAULT MINERALS | 36 Leonora Processing Baseload OP feed supplemented by high-grade UG Capacity expansion through bolt-on expansion For personal use only Existing Capacity: 5.3mtpa ~75% Feed (Inc. Stockpile) Gravity Circuit Primary Crusher SAG Mill KOTH Open Pit Gold Doré (P80-180µm) CIL Circuit ~15%

  37. Slide 37: Leonora – Internally funded processing facility upgrades

    VAULT MINERALS | 37 Leonora – Internally funded processing facility upgrades A strategic asset with the potential to further increase its competitiveness 1 For personal use only $172 million investment to expand modern KoTH process facility & further increase competitiveness Stage 1 – construction w

  38. Slide 38: Modern KoTH plant layout drives low risk & low capital intensity expansion

    VAULT MINERALS | 38 Modern KoTH plant layout drives low risk & low capital intensity expansion A strategic asset with the potential to further increase its competitiveness1 For personal use only Additional cyclone banks 4 x new Stage 3 adsorption tanks New primary Ball mill crusher Stage 2 Tailings

  39. Slide 39: Stage Processing upgrade: Crusher installation

    VAULT MINERALS | 39 Stage 1 Processing upgrade: Cusher installation For personal use only

  40. Slide 40: Stage Processing upgrade: Crusher installation

    VAULT MINERALS | 40 Stage 1 Processing upgrade: Cusher installation For personal use only

  41. Slide 41: Stage Processing upgrade: Absorption tanks

    VAULT MINERALS | 41 Stage 1 Processing upgrade: Absorption tanks For personal use only

  42. Slide 42: Regional exploration/development

    VAULT MINERALS | 42 Regional exploration/development For personal use only

  43. Slide 43: Exploration: Overview

    VAULT MINERALS | 43 Exploration: Overview For personal use only Regional opportunities within our portfolio ▪ Region plays host to some of Australia’s largest gold deposits ▪ Extensive regional land holding1: − Darlot ~710km2 − KoTH ~166km2 ▪ Hierarchy of exploration priorities; − UG extensions of K

  44. Slide 44: Leonora: Enhanced KoTH mill reinvigorates regional exploration

    VAULT MINERALS | 44 Leonora: Enhanced KoTH mill reinvigorates regional exploration For personal use only Opportunity for regional growth within reach of the region’s largest, lowest cost mill ▪ Severn, Rainbow, Centauri, Cerebus-Eclipse account for a current Mineral Resource of ~290koz Au and ~118ko

  45. Slide 45: Ore Reserve & Mineral Resource Statements

    For personal use only VAULT MINERALS | 45 Ore Reserve & Mineral Resource Statements Appendix A

  46. Slide 46: Ore Reserves (other than KoTH OP/Stockpiles) as at June 2024

    VAULT MINERALS | 46 Ore Reserves (other than KoTH OP/Stockpiles) as at 30 June 2024 Gold Proved Ore Reserves Probable Ore Reserves Total Ore Reserves Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces ('000s) (g/t Au) (Au '000s) ('000s) (g/t Au) (Au '000s) ('000s) (g/t Au) (Au '000s) Leonor

  47. Slide 47: Mineral Resources (other than KoTH OP/Stockpiles) as at 30 June 2024

    VAULT MINERALS | 47 Mineral Resources (other than KoTH OP/Stockpiles) as at 30 June 2024 Gold Measured Mineral Resources Indicated Mineral Resources Inferred Mineral Resources Total Mineral Resources Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces ('000s) (g/t Au) (Au

  48. Slide 48: Other information

    For personal use only VAULT MINERALS | 48 Other information Appendix B

  49. Slide 49: LTM mill throughput and processing cost

    VAULT MINERALS | 49 LTM mill throughput and processing cost Gold Project Company LTM Throughput (kt) LTM Processing Cost (A$M) Implied Unit Cost (A$/t Processed) Source File (Announcement Date) 1 1 1 Bellevue Bellevue Gold Limited 1,069 $76 $71 Quarterly Activities Report (29 April 2025) For persona

  50. Slide 50: Contact Vault

    For personal use only Contact Vault Phone: (61) 8 6313 3800 Email: info@vaultminerals.com www.vaultminerals.com

Vault Minerals — Technical Presentation (July 2025) on 6ix