TransAtlantic Petroleum Ltd

TransAtlantic Petroleum — Enercom Dallas March 2017

45 slides from TransAtlantic Petroleum's conference presentation, Feb 28, 2017

  1. Slide 1: TransAtlantic Petroleum Ltd. Enercom Dallas March 2017

    TRANSATLANTIC petroleum ltd. Enercom dallas march 2017 Bahar 11H Exhibit 99.1

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Outlooks, projections, estimates, targets and business plans in this presentation or any related subsequent discussions are forward-looking statements. Actual future results, including TransAtlantic Petroleum Ltd.’s own production growth and mix; financial results; the amo

  3. Slide 3: Overview of Balance Sheet Improvement

    Net debt is close to zero. The company’s non-property assets and non-preferred stock liabilities essentially off set each other. 1 FX changes are immaterial to balance sheet on non GAAP basis Rule of law in Turkey has remained stable despite political headlines The market has not recognized the chan

  4. Slide 4: Company Transformation

    COMPANY TRANSFORMATION NYSE AMEX: TAT TSX: TNP-TO

  5. Slide 5: Company transformation

    Company transformation Entered new credit facility with Deniz bank replacing BNP-IFC Exchanged and redeemed approximately $45mm of convertible notes due 6-1-17 for Preferred Series A shares Closed sale of Thrace Basin Natural Gas with Valeura Energy (VLE.TSX) on February 24th For the sale of all of

  6. Slide 6: Historical production and Financial Metrics

    Historical production and Financial Metrics (1) General and administrative expenses are calculated in accordance with U.S. GAAP and divided by total production (Mboe) (2) 2016 metrics are estimates and are unaudited. We have provided a range of estimates as amounts are preliminary and are subject to

  7. Slide 7: Historical and Pro Forma Credit Statistics

    Q2’2015 Q3’2015 2015 Q1’2016 Q2’2016 Q3’2016 Pro Forma(2) -6.3x 2.1x -3.6x -4.2x -3.2x -4.7x -1.8x Historical and Pro Forma Credit Statistics (1) Adj. EBITDAX is annualized (2) Pro Forma amount assumes 100% conversion of Series A Preferred Shares, $4.3mm redemption in January of the 2017 notes, Term

  8. Slide 8: Improving balance sheet

    Improving balance sheet * Note: Pro Forma amount assumes 100% conversion of Series A Preferred Shares, $4.3mm redemption in January of the 2017 notes, Term Loan payments from October 2016 through February 2017, and partial payment of ANBE loan of $898K in December 2016 and the remainder of the ANBE

  9. Slide 9: Reserves Year End 2016

    reserves year end 2016 Bahar Production Facility

  10. Slide 10: Reserves - Overview

    Reserves - Overview OPPOSING PRICING TRAJECTORIES YEAR-OVER-YEAR SEC Price dropped from $55 to $44, Beginning Forward Strip increased from $47 to $58 YE2016 Ex-TBNG is Proforma

  11. Slide 11: Reserves – year over year comparison

    Reserves – year over year comparison 200% production replacement overshadowed by asset sales YE2016 reserves are preliminary D&M results. YE2016 TBNG reserves are internal. YE2015 reserves are final, audited D&M results.

  12. Slide 12: Reserves – year over year comparison

    Reserves – year over year comparison Sec value down 45% *while strip value up 18%* * Ex TBNG YE2016 reserves are preliminary D&M results. YE2016 TBNG reserves are internal. YE2015 reserves are final, audited D&M results. TBNG reserves are unaudited, internal reserves. SEC VALUE Increase due to fowar

  13. Slide 13: Overview – SEC pricing vs. forward strip

    Overview – sec pricing VS. FORWARD STRIP YE2016 reserves are preliminary D&M results. YE2015 reserves are final, audited D&M results. ye2016 sec reserves YE2016 forward strip reserves Net Reserves (MMBoe) Proved (1P) 1P + Probable (2P) 12/31/2015 18.6 48.3 Production -1.7 -1.7 Adds/Revisions 3.5 3.9

  14. Slide 14: Southeast Turkey

    South east turkey Source IHS with production through the end of 2010 TransAtlantic’s licenses are surrounded by numerous fields of significant reserve size TransAtlantic license outline 3D shoot outline Producing field outline Barbes field 23.79 MMBO Barbes Derin field 12 BCF, 1.04 MMB cond. Yenikoy

  15. Slide 15: Southeast Turkey – Molla Area – Bahar Field

    Southeast Turkey – Molla Area – Bahar Field Reserves other than Bahar are internal estimates for gross reserves. Reserves for Bahar are externally prepared gross reserves by D&M. Pinar 1 Catak 1 Expansion of License 4845 Molla Goksu 1P = Proved 2P = Proved + Probable nr = Not Reserved Reserve Estima

  16. Slide 16: Turkey reserves – Molla area – Bahar field

    Turkey reserves – molla area – bahar field Growth of reserves & production at bahar field Reserves are SEC pricing. Reserves for Bahar are externally prepared net reserves by D&M.

  17. Slide 17: Southeast Turkey activity

    Southeast Turkey activity Currently Drilling Bahar 11 Well Path on Seismic Offset well IP Hazro F-3 Bahar 4: 1826 BOPD Bedinan (vertical) Bahar 6: 757 BOPD Plan for 2200’ vertical section with 4-5 fracs in Bedinan Plan to complete and commingle Hazro F3 and Bedinan Karababa A BCU - Hazro Hazro F4 Ha

  18. Slide 18: Overview – SEC pricing vs. forward strip

    Overview – sec pricing VS. FORWARD STRIP YE2016 reserves are preliminary D&M results. YE2015 reserves are final, audited D&M results. $/Share based on 12/31/16 outstanding shares of 47,220,525. $/Share Preferred Converted assumes 100% conversion of the Series A Preferred Shares. There is no assuranc

  19. Slide 19: Growth Plan

    GROWTH PLAN EX: TAT TSX: TNP.TO

  20. Slide 20: Better fiscal terms than North America

    Better fiscal terms than North America Turkey 87.5% NRI Bulgaria 97.5% NRI until cost recovery and 70% NRI thereafter Albania 93.0% NRI Products price premiums Brent indexed oil – dollar based $6.00/mcf gas – mixed currency Unsatisfied local demands Our near term growth projects Pinar (Pē-nar), Turk

  21. Slide 21: Southeast Turkey – Molla Area – Bahar field

    Southeast Turkey – Molla Area – Bahar field Reserves other than Bahar are internal estimates for gross reserves. Reserves for Bahar are externally prepared gross reserves by D&M. Pinar 1 Catak 1 Expansion of License 4845 Molla Goksu 1P = Proved 2P = Proved + Probable nr = Not Reserved Reserve Estima

  22. Slide 22: Southeast Turkey – Molla Area – Pinar Redrill

    Southeast Turkey – Molla Area – Pinar Redrill Reserves other than Bahar are internal estimates for gross reserves. Reserves for Bahar are externally prepared gross reserves by D&M. Pinar 1 Catak 1 Expansion of License 4845 Molla Goksu 1P = Proved 2P = Proved + Probable nr = Not Reserved Reserve Esti

  23. Slide 23: Southeast Turkey – Molla Area

    Southeast Turkey – Molla Area Reserves other than Bahar are internal estimates for gross reserves. Reserves for Bahar are externally prepared gross reserves by D&M. Pinar 1 Catak 1 Expansion of License 4845 Molla Goksu 1P = Proved 2P = Proved + Probable nr = Not Reserved Reserve Estimates do not inc

  24. Slide 24: Southeast Turkey – Molla Area – Cavuslu

    Southeast Turkey – Molla Area – Cavuslu Reserves other than Bahar are internal estimates for gross reserves. Reserves for Bahar are externally prepared gross reserves by D&M. Pinar 1 Catak 1 Expansion of License 4845 Molla Goksu 1P = Proved 2P = Proved + Probable nr = Not Reserved Reserve Estimates

  25. Slide 25: Southeast Turkey – Molla Area

    Southeast Turkey – Molla AreA Reserves other than Bahar are internal estimates for gross reserves. Reserves for Bahar are externally prepared gross reserves by D&M. Pinar 1 Catak 1 Expansion of License 4845 Molla Goksu 1P = Proved 2P = Proved + Probable nr = Not Reserved Reserve Estimates do not inc

  26. Slide 26: Southeast Turkey – Molla Area – new license

    Southeast Turkey – Molla AreA – new license Reserves other than Bahar are internal estimates for gross reserves. Reserves for Bahar are externally prepared gross reserves by D&M. Pinar 1 Catak 1 Expansion of License 4845 1P = Proved 2P = Proved + Probable nr = Not Reserved Reserve Estimates do not i

  27. Slide 27: Southeast Turkey – Molla Area

    Southeast Turkey – Molla Area Reserves other than Bahar are internal estimates for gross reserves. Reserves for Bahar are externally prepared gross reserves by D&M. Pinar 1 Catak 1 Expansion of License 4845 1P = Proved 2P = Proved + Probable nr = Not Reserved Reserve Estimates do not include Dadas S

  28. Slide 28: Bulgaria – North Koynare Prospect

    Bulgaria – North Koynare Prospect *Reserves are internal estimates for gross reserves. A A’ B B’ R1 R2 1400 Acres 30 MMBO* Prospect to be tested through sidetrack Potential for 5000 BOPD with 5 MMBO per well Multiple additional leads have been identified on license (165,000 acres) Koynare Production

  29. Slide 29: Bulgaria – North Koynare Prospect

    Bulgaria – North Koynare Prospect Reserves are internal estimates for gross reserves. North Koynare Structure Dolni Dabnik Field 29MMBO Dolni Dabnik Fm. Lower Cretaceous Unconformity C C’ Proposed Location Graben (Kitchen Area) R1 Down thrown Dolni Dabnik in R1 Compilation of 2D seismic for comparis

  30. Slide 30: Delvina gas field

    Delvina gas field 25% Operated Interest Reserves are internal estimates from Chevron report Plan to workover two existing wells and install a gas treatment facility in 2017 Delvina Field Estimated net TAT recoverable reserves in Delvina range from 61 BCF (10 Mbo) to 279 BCF (46 Mbo) (per prior Chevr

  31. Slide 31: Summary

    Delevered balance sheet Back to drilling Using proved reserves strip pricing for company value: Company worth 4x if preferred redeemed Company worth 2x if preferred converted Near term plan for reserve growth and potential recognition 14 Mboe 1P reserves now 160 Mboe (140 Mboe Net) reservoir tests i

  32. Slide 32: Questions? Discussion

    EMILEE UPSON INVESTOR RELATIONS ADMINISTRATIVE COORDINATOR 972.590.9912 ext1012 emilee.upson@tapcor.com Questions? discussion

  33. Slide 33: Appendix

    APPENDIX NYSE AMEX: TAT TSX: TNP-TO

  34. Slide 34: Experienced Management

    EXPERIENCED MANAGEMENT NAME TITLE YEARS’ EXPERIENCE PRIOR EXPERIENCE Malone Mitchell III Chairman & CEO 30 Todd Dutton President 37 Chris Elmore CAO & Controller 16 Chad Burkhardt VP, GC & CS 17 Selami Uras VP, Land 30 David Mitchell VP, Engineering 10 Lee Muncy VP, Geosciences 38 Fabian Anda VP, Fi

  35. Slide 35: Appendix – SEC pricing reserves snapshot

    appendix – sec pricing Reserves snapshot Reserves outlined are Preliminary YE2016 D&M Reserves as of Jan 31st, 2017 except TBNG reserves. TBNG reserves are unaudited, internal reserves.

  36. Slide 36: Appendix – forward strip pricing reserves snapshot

    appendix – forward strip pricing BRENT FORWARD Reserves snapshot Reserves outlined are Preliminary YE2016 D&M Reserves as of Jan 31st, 2017 except TBNG reserves. TBNG reserves are unaudited, internal reserves.

  37. Slide 37: Appendix – pricing data

    Appendix – pricing data Reserves outlined are Preliminary YE2016 D&M Reserves as of Jan 31st, 2017 except TBNG reserves. TBNG reserves are unaudited, internal reserves. Avg. Realized Prices ($) Oil Natural Gas 12/31/2015 $48.65 $7.65 12/31/2016 $37.16 $6.85 Change -24% -10% Avg. Realized Prices ($)

  38. Slide 38: Appendix – oil pricing highlights

    appendix OIL PRICING HIGHLIGHTS YE2016 reserves are preliminary D&M results. YE2015 reserves are final, audited D&M results. Improved Pricing Environment 19% reduction in SEC Brent Price 2015 - $55.11 2016 - $44.42 Much improved forward strip YE2015 forward strip started at a 26% discount to SEC YE2

  39. Slide 39: Appendix - Turkey reserves, proved reserves by area

    Appendix - Turkey reserves Proved reserves by area - sec YE2016 Non-TBNG reserves are preliminary D&M results. TBNG reserves are unaudited, internal reserves in consolidated numbers. YE2015 reserves are final, audited D&M results. Prices are SEC Brent Price before differentials 12/31/2016 Adds / 201

  40. Slide 40: Appendix - Turkey reserves by area

    Appendix - Turkey reserves Reserves by area - sec YE2016 Non-TBNG reserves are preliminary D&M results. TBNG reserves are unaudited, internal reserves in consolidated numbers. YE2015 reserves are final, audited D&M results. Prices are SEC Brent Price before differentials 12/31/2016 Adds / 2016 12/31

  41. Slide 41: Appendix Production summary

    appendix Production summary Production is reported net wellhead volumes 2015 2016 Y/Y Net Production Volumes Production Production % Change TURKEY Oil (Mbbls) 1,426 1,378 -3% Gas (MMscf) 2,645 1,597 -40% BOE (Mboe) 1,867 1,644 -12% ALBANIA Oil (Mbbls) 248 39 -84% Gas (MMscf) 0 0 0% BOE (Mboe) 248 39

  42. Slide 42: Adjusted EBITDAX reconciliations

    Adjusted ebitdax reconciliations Adjusted EBITDAX from continuing operations ("Adjusted EBITDAX") is a non-GAAP financial measure that represents net income (loss) from continuing operations plus interest and other, net, current and deferred income tax expense, exploration, abandonment and impairmen

  43. Slide 43: Adjusted EBITDAX reconciliations (continued)

    Adjusted ebitdax reconciliations (continued) For the Twelve Months Ended Dec 31

  44. Slide 44: 2016 PV-10 Reconciliation

    2016 PV-10 RECONCILIATION ‘Value of Proved Reserves The following table PV 31, 2016: Turkey Albania TBNG® Total Gathousands) Future net revenue s 219306 $ 3,502 $33,680 $ 256,488, Total PV-102 137490 $ BS $ 2099 $ 159218 Total Standardized Measure $ 126538 $ TBS $ 17,658 $ 144,934 (Q) Our TBNG reser

  45. Slide 45: 2015 PV-10 Reconciliation

    2015 PV-10 RECONCILIATION ‘Value of Proved Reserves 201 Te town Future net revenue) s 340243 S 2738S 402,981 1 Total PV-10,2) s 222.497 $ 26887 249,384 Total Standardized Measure!) s 199227 Ss 26887 226.114 oy ‘As of December 31,2015, our Albanian 10K @ i the use of reconciliation of or PV-10 to our

TransAtlantic Petroleum — Enercom Dallas March 2017 on 6ix