  1. Slide 1: Resolute Mining Limited – Denver Gold Forum

    RESOLUTE MINING LIMITED www.resolute-Itd.com.au DENVER GOLD

  2. Slide 2: Outline

    OUTLINE ¾ Overview ¾ Summary of 2005 Results ¾ Outlook for Operations ¾ Update on Development & Exploration ¾ Uranium

  3. Slide 3: Growing Gold Producer

    GROWING GOLD PRODUCER ¾ Experienced African/Australian Gold Producer ¾ Reserves 2.8m ozs, Total Resources 10.0m ozs ¾ Producing 300,000+ ozs pa ¾ Two Operations ¾ Significant Development Project ¾ Focused Exploration

  4. Slide 4: Project Pipeline

    PRO) ECT PIPELINE Finance Discovery

  5. Slide 5: Corporate Summary

    CORPORATE SUMMARY Capitalisation Board of Directors ƒ Issued Shares: 228.3 million ƒ Peter Huston – Non Exec Ch ƒ Unlisted Options: 4.2 million ƒ Peter Sullivan - MD ƒ 6 mth Price Range: A$1.25 - $0.85 ƒ Tom Ford – Non Exec ƒ Avg Monthly T/O: 9.7 million ƒ Bill Price – Non Exec Major Shareholders ƒ

  6. Slide 6: Financial Results

    FINANCIAL RESULTS (Year to 30 June 2005) ¾ 315,388 ozs Produced @ Cash Cost US$325/oz ¾ Profit after Tax: US$10.6m (A$13.9m) ¾ Cash/Bullion: US$29.4 m (A$38.7m) ¾ Total Debt: US$22.9m (A$30.2) ¾ Net Assets: US$126m (A$166m) ¾ No Dividend

  7. Slide 7: Golden Pride

    RESOLUTE MINING LIMITED

  8. Slide 8: Golden Pride

    GOLDEN PRIDE ¾ 149,886 ozs @ Cash Cost US$269/oz ¾ Throughput 2.8 mtpa, Grade 1.6 g/t Au ¾ Grade Improvement Later This Year After Cutback at Western End Completed ¾ Mine Life of 3+ Years ¾ Production Level ~180,000 ozs @ ~US$220/oz

  9. Slide 9: Golden Pride Near Mine Exploration

    GOLDEN PRIDE NEAR MINE EXPLORATION

  10. Slide 10: Ravenswood

    RESOLUTE MINING LIMITED

  11. Slide 11: Ravenswood

    RAVENSWOOD ¾ 165,522 ozs @ Cash Cost US$375/oz ¾ Throughput 5.5 mtpa, Grade 1.1 g/t Au ¾ Open Pit Feed – Sarsfield ¾ Underground Feed – Nolans North ¾ Mine Life of 4 Years ¾ Production Level ~180,000 oz pa @ ~US$325/oz

  12. Slide 12: Ravenswood

    RAVENSWOOD ¾ Cost and Efficiency Drive Completed with 25% Cost Per Tonne Reduction ¾ Improving Business Plan for Operation ¾ Focus on New Feed Sources • Low Grade Screening • Mt Wright ¾ Extend Mine Life

  13. Slide 13: Ravenswood Low Grade Screening

    RAVENSWOOD LOW GRADE SCREENING ¾ Crush and Screen Process • Reject 80% of Crusher Feed • Improve Grade 250% ¾ Low Grade 0.4 – 0.7g/t ¾ 20mt Available from Pit and Stockpiles ¾ Process ~4mtpa of Low Grade

  14. Slide 14: Mt Wright Development

    MT WRIGHT DEVELOPMENT ¾ Located 15km from Ravenswood ¾ Total Resources of 970,000 ozs ¾ Bulk Scale Underground Operation, ~1.0mtpa ¾ Significant Impact on Ravenswood Mine Plan

  15. Slide 15: Syama Development

    » SYAMA DEVELOPMENT Bamako e

  16. Slide 16: Syama

    SYAMA ¾ Resolute 80%, Govt of Mali 20% ¾ Care and Maintenance Since Early 2001 ¾ Significant and Robust Resource – 6.4m oz @ 3g/t ¾ Potential for 10+ Year Operation ¾ Positive Feasibility Completed March 2005

  17. Slide 17: Syama Metallurgy

    SYAMA METALLURGY Issues - Carbonaceous - Refractory BHP Design Randgold Design Resolute Design ƒ Whole of Ore Roast ƒ Whole of Ore Roast ƒ Concentrate Roast ƒ Carbonate Host Rock ƒ Added Concentrate ƒ Carbonate for SO2 for SO2 Capture Feed Capture ƒ Dry SAG Milling ƒ Carbonate Host Rock ƒ Wet Millin

  18. Slide 18: Syama Economics

    SYAMA ECONOMICS ¾ Reserve 13.6 mt @ 4 g/t, 1.8 m ozs ¾ Throughput 2.4 mtpa, 87.7% recovery ¾ Production 250,000 - 270,000 ozs pa ¾ Average Cash Cost US$291/oz ¾ Capex US$82.0 million ¾ Net Cash Return US$124.3 million ¾ IRR 18.4% ¾ Design and Construct 18 months

  19. Slide 19: Syama Inclusion of Underground Resource

    SYAMA INCLUSION OF UNDERGROUND RESOURCE Long Projection (Looking West) Showing +3g/t Ore Outline & 2004 Drilling

  20. Slide 20: Syama Improvement Opportunities

    SYAMA IMPROVEMENT OPPORTUNITIES ¾ Royalty and Fiscal Terms ¾ Power Costs ¾ Hedging ¾ Financing Package

  21. Slide 21: Exploration

    EXPLORATION ¾ Increased Commitment to Exploration ¾ Key to Adding Value at Existing Assets ¾ Budget for 2006 – US$10m ¾ Expenditures Primarily • Tanzania • Ravenswood • Mali • Ghana

  22. Slide 22: Tanzania Regional Exploration

    TANZANIA REGIONAL EXPLORATION Greenstone Belt

  23. Slide 23: Ravenswood Exploration

    RAVENSWOOD EXPLORATION Location and Tenure

  24. Slide 24: Syama Exploration

    SYAMA EXPLORATION Location, Geology, Tenure & Prospects

  25. Slide 25: Uranium

    110° 4 115° 120° 4 125° BEATRICE SOUTH 33%) T T 2 yg 8 8 e : Mt, GILRUTH (33.33%) BIGRLY! | (41.71%) ——— MALAWIRI (47.96%) Approx. 1000km (47.96%) - Resolute Interest 150° — 158 — 145° VALHALLA

  26. Slide 26: Uranium – Valhalla Cross Section

    URANIUM © CROSS SECTION 40420 N Ss Z SURFACE z= OmRL | incl.13.0m | 0.90 1.99 9.0m | 0.90 1.99 i | 44.3m | 0.75 1.65 -100mRL —} | incl.9m_| 0.54 1.19 MINERALISED ZONE i ; 10.3m_|_ 2.39 | 5.26 = = 933m 531 -200mRL —| incl.13.6m B 16.0m| 3.17 | 7.00 19.0m) 1.72 3.80 10.2m| 9.67 | 21.31 = -300mRL —] i

  27. Slide 27: Uranium

    URANIUM ¾ Dormant Assets ¾ Mt Isa Uranium JV, Qld • 50% JV Interest - Summit Resources • Valhalla and Skal Deposits • Total Resource 30,000t U O 3 ¾ Exploration JV’s, NT ¾ Spin Out Float

  28. Slide 28: Summary

    SUMMARY ¾ Gold ¾ Experienced Operator ¾ African/Australian Focus ¾ High Leverage to Gold Price ¾ Good Growth Potential ¾ Uranium Interest