  1. Slide 1: Sale of the Rustenburg Operations

    SALE OF THE RUSTENBURG OPERATIONS 1

  2. Slide 2: Disclaimer

    DISCLAIMER Certain statements included in this presentation, as well as oral statements that may be made by Sibanye or Anglo American Platinum, or by officers, directors or employees acting on their behalf related to the subject matter hereof, constitute or are based on forward- looking statements.

  3. Slide 3: Contents

    CONTENTS 1. Introduction – Chris Griffith 2. Transaction overview – Chris Griffith 3. Rustenburg transaction rationale – Neal Froneman 4. Empowerment – Neal Froneman 5. Management capacity and retaining focus – Neal Froneman 6. Conclusion – Chris Griffith & Neal Froneman 7. Appendix 3

  4. Slide 4: Introduction

    INTRODUCTION “Pleased to announce Anglo American Platinum’s sale of the Rustenburg Operations to Sibanye” 4

  5. Slide 5: AAP – Repositioning our portfolio

    AAP – REPOSITIONING OUR PORTFOLIO • Announced the restructuring in 2013 • Cost benefits of R4.2bn realised - above the R3.8bn target by 2015 – Consolidated Rustenburg from 5 to 3 mines and Union from 2 to 1 mine – Optimisation of Union and Rustenburg mines well progressed • Next stage is the reposit

  6. Slide 6: The future AAP portfolio

    THE FUTURE AAP PORTFOLIO Operational improvement, debottleneck, Mogalakwena potential for future expansion Investment in replacement ounces, 1 High quality asset portfolio Amandelbult potential to expand Twickenham Mechanise and establish ideal scale 2 Low cost production Unki Expand to infrastructu

  7. Slide 7: Background to the transaction

    BACKGROUND TO THE TRANSACTION Anglo American Platinum announced its decision to exit from Rustenburg during 2014 • “…confident that the assets will receive greater management focus under different ownership… • …where the mines will not be competing for allocation of capital… • ...exit in a responsib

  8. Slide 8: Contents

    CONTENTS 1. Introduction 2. Transaction overview 3. Rustenburg transaction rationale 4. Empowerment 5. Management capacity and retaining focus 6. Conclusion 7. Appendix 8

  9. Slide 9: Rustenburg Operations: transaction perimeter

    RUSTENBURG OPERATIONS Transaction perimeter includes mining, processing & surface infrastructure RPM Transaction perimeter Rustenburg section Operating mines Excluded from transaction Smelting and refining Thembelani (including Khuseleka) Siphumelele (including Khomanani) Bathopele 1 operations Kroo

  10. Slide 10: Next steps towards completion

    NEXT STEPS TOWARDS COMPLETION 1 Management of Rustenburg • Will remain part of the AAP portfolio until completion of the transaction • Will be run under different executive management (Executive Head: Joint Ventures) as a separate entity and according to the operational plan • Management information

  11. Slide 11: Terms of the transaction

    TERMS OF THE TRANSACTION • Sibanye will acquire the Rustenburg Operations from Anglo American Platinum for a minimum consideration of R4.5 billion made up of: 1. An upfront consideration of R1.5 billion in cash or shares (at Sibanye’s election) 2. A deferred payment of 35% of distributable free cash

  12. Slide 12: Contents

    CONTENTS 1. Introduction 2. Transaction overview 3. Rustenburg transaction rationale 4. Empowerment 5. Management capacity and retaining focus 6. Conclusion 7. Appendix 12

  13. Slide 13: Confirming Sibanye's investment thesis

    CONFIRMING SIBANYE’S INVESTMENT THESIS 13

  14. Slide 14: Confirming Sibanye's investment thesis

    CONFIRMING SIBANYE’S INVESTMENT THESIS 14

  15. Slide 15: Confirming Sibanye's investment thesis

    CONFIRMING SIBANYE’S INVESTMENT THESIS 15

  16. Slide 16: Sibanye transaction rationale

    SIBANYE TRANSACTION RATIONALE • Consistent with Sibanye’s strategy to enhance its cash flows and ability to pay industry leading, sustainable dividends • Transaction structure balances short term downside protection for Sibanye and mid-term upside sharing with AAP • Secures a meaningful entry into t

  17. Slide 17: Free cash flow generative

    FREE CASH FLOW GENERATIVE R million 1,630 1,514 2 670 3 522 212 (597) 2010 2011 2012 2013 2014 2015 1H Source: AAP reporting Notes: 1. Operating free cash flow equals net sales revenue less direct cash operating costs, processing costs, allocated other costs, on-mine stay-in-business capital and all

  18. Slide 18: Sibanye transaction rationale

    SIBANYE TRANSACTION RATIONALE • Consistent with Sibanye’s strategy to enhance its cash flows and ability to pay industry leading, sustainable dividends • Transaction structure balances short term downside protection for Sibanye and mid-term upside sharing with AAP • Secures a meaningful entry into t

  19. Slide 19: Structured to comply with investment thesis

    STRUCTURED TO COMPLY WITH INVESTMENT THESIS • The phased transaction structure facilitates shared risk exposure • Deal structure provides down side protection to Sibanye in a “lower for longer” platinum price scenario, while earn out provides AAP upside exposure in the event of higher PGM prices in

  20. Slide 20: Sibanye transaction rationale

    SIBANYE TRANSACTION RATIONALE • Consistent with Sibanye’s strategy to enhance its cash flows and ability to pay industry leading, sustainable dividends • Transaction structure balances short term downside protection for Sibanye and mid-term upside sharing with AAP • Secures a meaningful entry into t

  21. Slide 21: Rustenburg Operations - a top global PGM producer

    RUSTENBURG OPERATIONS - A TOP 5 GLOBAL PGM PRODUCER 4E Reserves1,2 (moz) 4E Resources1,2 (moz) 2015E 4E Production1,4 (moz) AAP- ex AAP - ex AAP - ex Rustenburg 194.7 Rustenburg 814.4 Rustenburg 3.4 Operations³ Operations³ Operations Norilsk Nickel 128.2 Impala 395.2 Norilsk Nickel 3.4 Major global

  22. Slide 22: Sibanye transaction rationale

    SIBANYE TRANSACTION RATIONALE • Consistent with Sibanye’s strategy to enhance its cash flows and ability to pay industry leading, sustainable dividends • Transaction structure balances short term downside protection for Sibanye and mid-term upside sharing with AAP • Secures a meaningful entry into t

  23. Slide 23: Sibanye operating model

    SIBANYE OPERATING MODEL Reduce Premium rating costs and paylimits Robust Increase dividends flexibility SIBANYE Strong cash Increase flows margins Optimise all capital including balance sheet Increasing the operational focus, managing capital and rewarding shareholders 23

  24. Slide 24: Sibanye operational track record

    SIBANYE OPERATIONAL TRACK RECORD 2,500 Production and All-in cost 1750 1500 2,000 1250 US$/oz 000oz 1,500 1000 1,000 750 500 500 2007 2008 2009 2010 2011 2012 2013 2014 F2015 Production (koz) Gold Price ($/oz) All-in cost Gold Fields Sibanye Historical Forecast 50.0 Reserve growth 45.1 40.0 37.5 35.

  25. Slide 25: Rustenburg restructuring by AAP complete

    RUSTENBURG RESTRUCTURING BY AAP COMPLETE 4E Production (koz)1 Employees1 ~1,300 24,000 ~1,000 16,500 ~800 ~800 Base 2013 2015E 2017+ 2012 2015 1H Source: AAP H1 2015 reporting 1. Restructuring concluded by APP Restructured for sustainability and optimisation ongoing 25

  26. Slide 26: Production, cost & capex profiles

    PRODUCTION, COST & CAPEX PROFILES Rustenburg Operations (incl. WLTR) 4E Production and cash cost 1,250 14,000 1,000 13,000 4E production, koz Costs, R/4E oz 12,000 750 11,000 500 10,000 250 9,000 0 8,000 2012a 2013a 2014a 2015f¹ 2016e 2017e 2018e 2019e 2020e 2021e 2022e 2023e 2024e 2025e Historical

  27. Slide 27: Sibanye transaction rationale

    SIBANYE TRANSACTION RATIONALE • Consistent with Sibanye’s strategy to enhance its cash flows and ability to pay industry leading, sustainable dividends • Transaction structure balances short term downside protection for Sibanye and mid-term upside sharing with AAP • Secures a meaningful entry into t

  28. Slide 28: Sibanye's PGM market view

    SIBANYE’S PGM MARKET VIEW Despite our bullish fundamental view, US$ PGM pricing headwinds are likely to persist over the near term for a variety of reasons • Excess above ground PGM stocks remain difficult to quantify. Deficit drawdowns and working capital cycle underpin should see an accelerated dr

  29. Slide 29: Contents

    CONTENTS 1. Introduction 2. Transaction overview 3. Rustenburg Transaction rationale 4. Empowerment 5. Management capacity and retaining focus 6. Conclusion 7. Appendix 29

  30. Slide 30: Empowerment

    Shine’s Management experience in PGM EMPOWERMENT • Consistent with Sibanye’s strategic intent of creating value for all stakeholders, its approach to Black Economic Empowerment is of a broad based nature • Sibanye will facilitate the creation of a fully empowered, low risk, vendor financed, SPV (“BE

  31. Slide 31: Contents

    CONTENTS 1. Introduction 2. Transaction overview 3. Rustenburg transaction rationale 4. Empowerment 5. Management capacity and retaining focus 6. Conclusion 7. Appendix 31

  32. Slide 32: New divisional units – retaining the focus

    NEW DIVISIONAL UNITS – RETAINING THE FOCUS Gold Uranium Platinum Sibanye Gold and Uranium Division Sibanye Platinum Division Wayne Robinson Shadwick Bessit Ensuring minimum disruption and clear role clarity 32

  33. Slide 33: Sibanye Platinum – management expertise

    SIBANYE PLATINUM – MANAGEMENT EXPERTISE Platinum Division Barry Davison – Non Executive Previously Executive Chairman of AAP, > 40 years’ industry Director experience Shadwick Bessit – SVP Operations Previously Executive Director of Operations at Impala Platinum from 2005 to 2010 Robert Van Niekerk

  34. Slide 34: Contents

    CONTENTS 1. Introduction 2. Transaction overview 3. Rustenburg transaction rationale 4. Empowerment and transformation 5. Management capacity and retaining focus 6. Conclusion 7. Appendix 34

  35. Slide 35: Conclusion

    CONCLUSION Close engagement between Sibanye and AAP has resulted in a sensible commercial transaction, which is beneficial for both parties Anglo American Platinum Sibanye  Successful step in portfolio repositioning  Successful entry into the PGM sector  In line with strategy to focus on core ass

  36. Slide 36: Contents

    CONTENTS 1. Introduction 2. Transaction overview 3. Rustenburg transaction rationale 4. Empowerment 5. Management capacity and retaining focus 6. Conclusion 7. Appendix 36

  37. Slide 37: Additional Rustenburg Operations information

    ADDITIONAL RUSTENBURG OPERATIONS INFORMATION Bathopele key facts Siphumelele key facts Mine commenced 1999 Mine commenced Sinking 1979 and production in 1983 Mining right coverage 17km2 Mining right coverage 43km2 Infrastructure Two decline shafts (Central and East) Infrastructure One vertical shaft

  38. Slide 38: Rustenburg – reserves and resources

    RUSTENBURG – RESERVES AND RESOURCES As of 31 December 2014 Tonnes Grade 4E Tonnes Grade 4E 100% basis 100% basis (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) Reserves Resources (incl. reserves) UG2 61.0 3.30 6.5 UG2 407.8 4.69 61.5 Merensky 13.9 5.57 2.5 Merensky 123.1 6.06 24.0 Subtotal 75.0 3.73 9.0 Subtotal