Grounded Lithium Corp · TSXV:GRD

Grounded Lithium — Investor Presentation (October 2023)

31 slides from Grounded Lithium's investor presentation, October 2023

  1. Slide 1: Corporate Presentation October 2023

    Corporate Presentation October 2023 W W W G R O U N D E D L I T H I U M . C O M ` DEFINING OUR PATH TO COMMERCIAL CANADIAN LITHIUM PRODUCTION www.groundedlithium.com | TSX.V: GRD.V | OTCQB: GRDAF

  2. Slide 2: Disclaimer

    Disclaimer This presentation material contains forward-looking statements and forward-looking information within the meaning of Section 27A of the Securities Act of 1933, as amended, Section 21E of the Securities Exchange Act of 1934, as amended, and applicable Canadian securities laws. The opinions

  3. Slide 3: Corporate Vision

    Resource quality. Starts and ends with the rock. Corporate Vision: Torque in investment Build a Best-in-Class, Environmentally Responsible, - Top tier resource potential - Significant land base under control in Canadian Lithium Producer friendly jurisdiction (333 sections or ~86,000 hectares) W W W

  4. Slide 4: Macro Economic Critical Mineral Environment

    Macro Economic Critical Mineral Environment North America poised for significant growth Global supply/demand forecasted to be in major deficit North America playing catch-up… W W W G R O U N D E D L I T H I U M . C O M Share of worldwide Share of industry worldwide industry Source: Benchmark Mineral

  5. Slide 5: Lithium from Brine ("LFB") – Commercial 'Playbook'

    Lithium from Brine (“LFB”) – Commercial ‘Playbook’ Key Attributes Investors Should Consider in LFB Development ATTRIBUTES FACTORS GROUNDED FACTS GRD • 220 million bbls/section @ 74 mg/litre W W W G R O U N D E D L I T H I U M . C O M Rock and Resource Lithium + Deliverability + Volume • 14,000 tonne

  6. Slide 6: Grounded PEA – Technical & Economic Vision

    Grounded PEA – Technical & Economic Vision Robust Project Economics – 11,000 tonne/yr lithium hydroxide monohydrate (“LHM”) Phase 1 Total Capital = USD$335 Million W W W G R O U N D E D L I T H I U M . C O M NPV(AT) 8% USD$1.0 Billion IRR(AT) 48.5% Capital Intensity per installed tonne capacity/yr U

  7. Slide 7: Leading LFB IRR's with Downside Protection

    Leading LFB IRR’s with Downside Protection …with leverage to the upside • Grounded’s -20% 1 2 downside case exceeds W W W G R O U N D E D L I T H I U M . C O M our peer’s stated base case IRR’s. Enterprise Value (Millions of CAD$) • Project protected with economic resilience in a volatile commodity

  8. Slide 8: Grounded – Discounted on a Few Metrics

    Grounded – Discounted on a Few Metrics More established peers trade at higher valuations, PEA or Net Asset Value (“NAV”) Opportunity for GRD investors W W W G R O U N D E D L I T H I U M . C O M 3 EV to Published PEA 20.0% 18.4% 18.0% 16.0% 13.6% GRD compared to Brine 14.0% Developers 12.0% 10.0% 8.

  9. Slide 9: Generating Returns For Investors – Compelling Project Economics

    Generating Returns For Investors Compelling Project Economics Source: Grounded Lithium filed PEA on August 9, 2023, PHASE 1 ONLY Only a 10 year forward look. PEA goes out to 2046 W W W G R O U N D E D L I T H I U M . C O M Kindersley Lithium Project - Phase 1, US$25,000/tonne realized sale price, 11

  10. Slide 10: Funds Flow on Equity Investment

    Funds Flow on Equity Investment Hard-pressed to find other risk adjusted opportunities Equity Financings Forecasted to Achieve Operations Total Equity Invested (high-end of range) W W W G R O U N D E D L I T H I U M . C O M Commercial Pre-pilot/Pilot Pre-Commercial Round Round Round (equity only) CA

  11. Slide 11: Preliminary Economic Assessment Conclusion – Rerate not reflected in share price

    Preliminary Economic Assessment Conclusion – Rerate not reflected in share price • PEA’s provide a 3rd party independent corroboration of the economic viability of a project • In Grounded’s case, PEA ranks among the highest results to date for project economics W W W G R O U N D E D L I T H I U M .

  12. Slide 12: Capitalization | TSX.V – GRD | OTCQB: GRDAF

    Capitalization| TSX.V – GRD | OTCQB: GRDAF Clean balance sheet with capital structure conducive for growth and returns for all shareholders Capitalization (as at Oct 4'23) GLC Ownership TSXV: GRD - Share Price $ 0.13 14% W W W G R O U N D E D L I T H I U M . C O M Outstanding Common Shares (shrs mil

  13. Slide 13: GLC Project Area – The Leduc Formation

    GLC Project Area The Leduc Formation / AKA the Duperow in Saskatchewan Leduc formation: extensively dolomitized ancient carbonate complex that spans 100s km2 and is over 200 m thick Southern Alberta & Saskatchewan contain massive shallow W W W G R O U N D E D L I T H I U M . C O M water carbonate re

  14. Slide 14: Robust Resource Potential

    Robust Resource Potential Proven Deliverability & Low-Cost Development Compelling Geology • Thick porous reservoir with confirmed lithium con • 220 million barrels/square mile W W W G R O U N D E D L I T H I U M . C O M • 14,000 tonnes LCE/square mile • Proven high deliverability/well Low Drilling C

  15. Slide 15: GLC Project Area – Kindersley Lithium Project Inferred Resource

    GLC Project Area Kindersley Lithium Project (”KLP”) - Inferred Resource1 – 4.2 million tonnes LCE ➢ Sufficient acreage for multiple phases GLC 1St Test Well ➢ Flexibility at this point to produce either lithium (2nd Lithium Well in Sask) AB SASK MB carbonate or lithium hydroxide – will be a function

  16. Slide 16: KLP Production Forecast

    KLP Production Forecast Multi-stage build-out minimizes risk on several fronts Future Phases Kindersley Lithium Project • Sufficient land holdings to support W W W G R O U N D E D L I T H I U M . C O M 44,000 multiple 11,000 tonne/yr phases LHM • Grounded continues to add to portfolio 33,000 where o

  17. Slide 17: Tier 1 Operating Jurisdiction to Build Business

    -Tier 1 Operating Jurisdiction to Build Business Saskatchewan Chose GLC, We Did Not Chose Saskatchewan! Resource Potential Lead GLC Efforts Saskatchewan ranked 3rd in the world for Easy access to infrastructure and services including: investment attractiveness in the Fraser Institute’s • High graded

  18. Slide 18: ESG & Lithium from Brine

    ESG & Lithium from Brine DLE delivers improved social and environmental license Environmentally Friendly Current Lithium Sources • Much lower environmental impact (less land disturbance, minimal water consumption and Large Environmental Footprint W W W G R O U N D E D L I T H I U M . C O M emissions

  19. Slide 19: Direct Lithium Extraction - DLE

    Direct Lithium Extraction - DLE Deploy capital to resource development, not R&D DLE: Key to Future of Clean Energy in Western Canada • Applies innovative process to Western Canada’s tremendous lithium resource potential while W W W G R O U N D E D L I T H I U M . C O M leveraging oil & gas expertise

  20. Slide 20: DLE – Noteworthy Industry Progression/Advancement

    DLE – Noteworthy Industry Progression/Advancement Grounded – Fast Follower at Low Valuation W W W G R O U N D E D L I T H I U M . C O M Standard Lithium Announces Positive Preliminary Feasibility Study Results for Its South West Arkansas Project “Our team has also been hard at work at our Demonstrat

  21. Slide 21: Direct Lithium Extraction Technology

    Direct Lithium Extraction Technology Potential Game Changer in Battery Supply Chain Industry DLE - Koch Technology Koch Technologies Solutions (Current Status) ➢ Sorption and Ion-exchange based technology (Li-ProTM) ➢ Grounded working with Koch to finalize pilot ➢ Would be first of its kind in Canad

  22. Slide 22: Operational Milestones and Objectives

    OPERATIONAL MILESTONES AND OBJECTIVES FINANCING PROJECT FUNDING DEBT & EQUITY OFFTAKE PRE-FID DISCUSSIONS FINANCING. & AGREEMENT(S) LEGEND IC COMPLETED INMATIVES IME GICTBC (INFRASTRUCTURE & FACILITIES) GC TBC (WELLS & PIPELINES) 1M PROJECT MILESTONES AV POTENTIAL VALUATION RE-RATE (PROJECT DE-RISKI

  23. Slide 23: Why Invest

    Why Invest Robust Value Proposition to Investors • Provides critical exposure to the global energy- transition shift Measured strategy designed to achieve operational wins and • Quality resource in quality rock in the least W W W G R O U N D E D L I T H I U M . C O M successes, while minimizing dilu

  24. Slide 24: Appendix

    W W W G R O U N D E D L I T H I U M . C O M APPENDIX 24

  25. Slide 25: PEA Support References

    PEA Support References The economic analysis of the PEA is based on the following main assumptions: • realized sales price of USD $25,000 per tonne of LHM; • annual production of 11,000 tonnes per year of LHM; W W W G R O U N D E D L I T H I U M . C O M • commerciality of KTS’ Li-ProTM lithium extra

  26. Slide 26: Leadership Team – We Build

    Leadership Team – We Build Disciplined resource development professionals with history of economic success Over 35 years combined technical and managerial Over 28 years of combined experience in finance and Gregg Smith Greg Phaneuf W W W G R O U N D E D L I T H I U M . C O M experience leadership di

  27. Slide 27: Board of Directors & Advisors

    Board of Directors & Advisors Wisdom and expertise to guide management and steward shareholder interests Board Member Experience Chair Other Committees John Wright Chairman of GLC, Mr. Wright also serves as the Chairman of two resource Board, development companies in the oil and gas sector (Touchsto

  28. Slide 28: Lithium from Brine Developer Comparables

    Lithium from Brine Developer Comparables Grounded is extremely inexpensive to market peers – compelling entry point COMP SHEET LITHIUM FROM BRINE DEVELOPERS Primary Traded Market TSXV TSXV TSXV CSE TSXV ASX W W W G R O U N D E D L I T H I U M . C O M Stock Symbol GRD ETL LBNK EMPS SLI LKE Jurisdicti

  29. Slide 29: Kindersley Lithium Project – Strong Capital Efficiencies

    Kindersley Lithium Project – Strong Capital Efficiencies Profitability Index (“PI”) Ranks Favourably to Peers • Grounded’s PI ratio at 5 sensitivity compares favourably with peers at W W W G R O U N D E D L I T H I U M . C O M 1 2 higher pricing Enterprise Value (Millions of CDN$) • Project remains

  30. Slide 30: Deliverability per Well is Mission Critical

    Deliverability per Well is Mission Critical Project economic and/or commercial hurdles require deliverability Analysis – how many wells are needed to GRD @ 19,500 bblds/day and 74 mg/litre maintain 11,000 tpa of = 450 tonnes LHM annually per well battery grade lithium (ie. LHM) production at W W W G

  31. Slide 31: Lithium from Brine – Low Cost & Sustainable

    Lithium from Brine – Low Cost & Sustainable W W W G R O U N D E D L I T H I U M . C O M Lithium from brines dominate low end of the cost curve DEVELOPING SASKATCHEWAN'S UNTAPPED LITHIUM RESOURCES 31

Grounded Lithium — Investor Presentation (October 2023) on 6ix