Landore Resources Limited · LSE:LND
Landore Resources — Investor Presentation (October 2015)
19 slides from Landore Resources's investor presentation, October 2015

Slide 1: October 2015
October 2015 www.landofe.com

Slide 2: Landore Properties
Landore Properties 6 in Eastern Canada plus 30% Interest in West Graham CANADA USA NEWFOUNDLAND Hudson Bay AND LABRADOR QUEBEC ONTARIO Miminiska Lessard Lake Root Lake Junior Chibougamau Lake Mt. Fronsac Thunder Bay Seeley Lake NEW Sudbury BRUNSWICK Lake Superior Montreal West Graham Lake Huron Toro

Slide 3: Junior Lake Project
Junior Lake Project B4-7 Nickel-Copper-Cobalt-PGE Deposit NI 43-101 – January 2013 RESOURCE CLASS VOLUME (tonnes) GRADE (% NiEq) Contained Metal (tonnes NiEq) Indicated 2,695,000 1.24 33,248 1,500,000 to Exploration Target ~1.24 ~20,000 2,000,000 Remains open along strike and down plunge Metallu

Slide 4: Corporate Strategy
Corporate Strategy Focus on the highly prospective Junior Lake Nickel- Copper-Cobalt-PGEs Property Growth of the existing resource to a minimum of 100,000 tonnes of Nickel Equivalent with the objective to: Sell to 3rd party or J.V. partnership to Development 4

Slide 5: Mineral Potential Investigation
Mineral Potential Investigation Junior Lake Property Landore retained the services of RPA Inc. (RPA) independent engineers of Toronto, Canada, to review and report on the Mineral Potential of the Junior Lake Nickel-Copper-PGE Project. The report is to Canadian National Instrument NI 43-101 standards

Slide 6: Mineral Potential Investigation
Mineral Potential Investigation 23,744 Hectares Junior Lake Property Mining Leases 21-year Grassy Pond renewable Sill mining, surface rights VW Ni Deposit ONTARIO B4-7 Ni/Cu Junior Deposit Lake 6

Slide 7: B4-7 – VW zones - Exploration Targets
Mineral Potential Investigation B4-7 – VW zones - Exploration Targets 7

Slide 8: B4-7 Deposit Growth Potential
Mineral Potential Investigation B4-7 Deposit Growth Potential Landore carried out drilling programs from 2013 to 2015 that tested the down-plunge extension of the B4-7 Deposit. These down- plunge drilling programs have been successful in extending the limits of the B4-7 Deposit along the down-plunge

Slide 9: B4-7 Deposit – Down Plunge Potential
Mineral Potential Investigation B4-7 Deposit – Down Plunge Potential 9

Slide 10: Recommendations
Mineral Potential Investigation Recommendations • Update the Mineral Resource estimate for the B4-7 Deposit to incorporate the results obtained from the 2013, 2014, and 2015 drilling programs. • Carry out additional drilling to test the down-plunge projection of the B4-7 Deposit at a drill hole spac

Slide 11: Geophysical Review
Geophysical Review Landore retained independent geophysicist Alan King of Sudbury, Canada, for the completion of a review and report of geophysical work to date on the Junior Lake property. Regional Gravity The large regional gravity anomaly to the west is due to the mafic intrusive rocks of the M

Slide 12: Geophysical Review – Recommended for Further Follow-up
Geophysical Review Recommended for Further Follow-up MCR type negative magnetic anomalies: Strong isolated negative (remnant) magnetic anomalies are characteristic of one of the early Ni-Cu mineralizing events in the MCR (i.e. Tamarack, Eagle - Baraga dykes). 12

Slide 13: Geophysical Review – Priority Targets
Geophysical Review – Priority Targets Quantec Orion 3D DC/IP/MT Survey 2012 (West Block) Local grid line 1300W to 300E, including western portion of B4-7 deposit DC5W DC2W B4-7 DC1W Plan View Down dip on the central and western portions of the B4-7 deposit (resistivity anomalies DC1W and DC2W).

Slide 14: Geophysical Review – Priority Targets
Geophysical Review – Priority Targets Quantec Orion 3D DC/IP/MT Survey 2014 (East Block) Local grid line 300E to 3700E, including eastern portion of B4-7 deposit and VW deposit B4-7 DC1 DC3 DC4 DC2 IP7 DC7 VW DC6 Plan View Induced Polarization IP1 zone indicating possible down dip extension of the

Slide 15: Geophysical Review – Priority Targets
Geophysical Review – Priority Targets Quantec Orion 3D DC/IP/MT Survey 2014 (East Block) IP1 DC4 DC6 VW Extensions of VW zone IP1/DC6 Plan View - DC Resistivity 1 ohm- m isosurface (red) and IP 60 milliradian isosurface (brown). 15

Slide 16: Geophysical Review – Priority Targets
Geophysical Review – Priority Targets Quantec Orion 3D DC/IP/MT Survey 2014 (East Block) IP7 DC7 DC7 and IP7 Plan View with DC Resistivity 1 ohm-m isosurface (red) and IP 80 milliradian isosurface (green). 16

Slide 17: Borehole Electromagnetic (BHEM) Survey
Geophysical Review – Priority Targets Borehole Electromagnetic (BHEM) Survey BHEM surveys were carried out on 7 drill holes, 4 of which on the VW deposit. The BHEM surveys in the VW deposit showed interesting results. An interpretation of drill hole 0405-40 indicates a good (300S) conductor abou

Slide 18: 2015/16 Proposed Work Plan
2015/16 Proposed Work Plan Phase 1 Mineral Potential Investigation Completed Junior Lake Geophysics Review Phase 2 Exploration and Technical Works Follow up Priority Targets as identified by Mineral Potential Investigation and Subject to Geophysical Review Funding Complete metallurgical works fo

Slide 19: 2015/16 Proposed Work Plan
2015/16 Proposed Work Plan Phase 3 Drilling Subject to Resource drilling 12,000 metres to prove completion up resources identified by independent of Phase 2 engineers and Phase 2 exploration Phase 4 Subject to Resources Updates Completion of Phases 3 19
Source: Internet Archive copy of landore.com
More decks from Landore Resources Limited
Investor Presentation (June 2026)23 slides · Jun 4, 2026
Investor Presentation (January 2024)29 slides · January 2024
Investor Presentation (November 2023)19 slides · November 2023
Investor Presentation (October 2023)27 slides · Oct 16, 2023
Investor Presentation (September 2023)26 slides · September 2023
Investor Presentation (August 2023)23 slides · August 2023