Slide 1: Cobre Panama Project Update
Cobre Panama Project Update January 28, 2014 TSX: FM; LSE: FQM
Slide 2: Cautionary Note Regarding Forward-Looking Statement
Cautionary Note Regarding Forward-Looking Statement Some of the statements contained in the following material are forward looking statements and not statement of facts. Such statements are based on the current beliefs of management, as well as assumptions based on management information currently a
Slide 3: Cobre Panama Project - Early Operations Area
COBRE PANAMA PROJECT - EARLY OPERATIONS AREA 3
Slide 4: Cobre Panama Project - Early Laydown Areas in Preparation
COBRE PANAMA PROJECT – EARLY LAYDOWN AREAS IN PREPARATION 4
Slide 5: Cobre Panama Project - Large Earthmoving Equipment Assembly Area
COBRE PANAMA PROJECT – LARGE EARTHMOVING EQUIPMENT ASSEMBLY AREA 5
Slide 6: Cobre Panama Project - Process Plant Site Earthworks
COBRE PANAMA PROJECT – PROCESS PLANT SITE EARTHWORKS 6
Slide 7: Cobre Panama Project - Mill Pad Earthworks
COBRE PANAMA PROJECT – MILL PAD EARTHWORKS 7
Slide 8: Cobre Panama Project - Process Plant Stockpile Pad
COBRE PANAMA PROJECT – PROCESS PLANT STOCKPILE PAD 8
Slide 9: Cobre Panama Project - Power Station Area
COBRE PANAMA PROJECT – POWER STATION AREA 9
Slide 10: Cobre Panama Project - Breakwater and Material Offloading Facility
COBRE PANAMA PROJECT – BREAKWATER AND MATERIAL OFFLOADING FACILITY 10
Slide 11: Cobre Panama Project - Operating Parameters
COBRE PANAMA PROJECT – OPERATING PARAMETERS Years 1 – 10 About 70 Mtpa Average Grade (years 1 – 10) 0.5 % Cu Years +10 ± 100 Mtpa (3rd train to offset lower grade) Average Grade (+ year 10) 0.37 % Cu Recovery ± 92 % Average life of mine Cu Production 320 KT Cu per annum Concentrate Grade 26% LOM (cu
Slide 12: Cobre Panama Project - Process Plant Looking North
COBRE PANAMA PROJECT – PROCESS PLANT LOOKING NORTH 12
Slide 13: Cobre Panama Project - Process Plant Looking South
COBRE PANAMA PROJECT – PROCESS PLANT LOOKING SOUTH 13
Slide 14: Cobre Panama Project - Overall Cost Status
COBRE PANAMA PROJECT – OVERALL COST STATUS INMET FIRST QUANTUM Original Committed at Incurred at Committed at Incurred at Revised Estimate Major Areas Budget March 2013 March 2013 November 2013 November 2013 (US$M) (US$M) (US$M) (US$M) (US$M) (US$M) Mine, Port & Infrastructure 3,447 3,124 480 3,034
Slide 15: Cobre Panama Project - Key Target Dates
COBRE PANAMA PROJECT – KEY TARGET DATES KEY ACTIVITY DATE Coast road available for use Q1 – 2014 230 KV overland power line complete Q4 – 2015 Power station construction complete (300MW) Q1 – 2017 Tailings management facility complete Q2 – 2017 Process plant construction complete Q3 – 2017 Process c
Slide 16: Notice
Notice IMPORTANT: You must read the following before continuing. The following applies to the confidential information following this page (the “Information”), and you are therefore advised to read this carefully before reading, accessing or making any other use of the Information. In accessing the
Slide 17: Overall changes to Capital Structure
Overall changes to Capital Structure First Quantum Minerals Ltd. (“First Quantum”, “FQM”, or the “Company”) is seeking to optimize its capital structure and financial flexibility. This involves: – Refinancing the short-term US$2.5 Bn revolver at FQM (Akubra) with a five year Term and Revolving Cre
Slide 18: Current Corporate Structure Chart
Current Corporate Structure Chart (Figures as of 30 September 2013) US$350 MM Senior Notes LTM Sep-13 EBITDA: US$1.1 Bn Total Debt / Total Leverage: US$0.8 Bn / 0.7x Total Assets: US$8.2 Bn US$2.0 Bn Senior Notes 100% 100% 100% 100% 100% 100% 100% US$2.5 Bn RCF FQM FQM Australia Metal Corp FQM
Slide 19: Pro Forma Corporate Structure Chart
Pro Forma Corporate Structure Chart (Figures as of 30 September 2013) US$2.28 Bn (1) New Senior Notes US$350m Senior Notes US$2.5 Bn 5 year Term and RCF LTM Sept-13 EBITDA: US$1.6 Bn Total Debt / Total Leverage: US$3.5 Bn / 2.1x Total Assets: $15.0 Bn 100% 100% 100% 100% 100% 100% 100% 100% 10
Slide 20: Summary Terms - New US$2.5 Bn Term and RCF
Summary Terms – New US$2.5 Bn Term and RCF Borrower • First Quantum Minerals Ltd. Mandated Lead Arrangers and • Standard Chartered Bank and BNP Paribas Underwriters • US$2,500 million Senior Credit Facility Facility – US$1,500 million Revolving Credit Facility – US$1,000 million Term Loan Maturity •
Slide 21: Summary Terms - Exchange Notes
Summary Terms – Exchange Notes Issuer • First Quantum Minerals Ltd. Maturity • 6 years • 7 years • Non-call 3 years, callable at a premium thereafter, • Non-call 4 years, callable at a premium thereafter, Redemption rateably declining to par rateably declining to par Coupon • 6.75% • 7.00% • Guarant
Slide 22: Cobre Panama Project Update
Cobre Panama Project Update January 28, 2014 TSX: FM; LSE: FQM
First Quantum Minerals — Corporate Update (January 2014) on 6ix