NorthWestern Energy Group, Inc. · NASDAQ:NWE

NorthWestern Energy — Corporate Update (February 2022)

36 slides from NorthWestern Energy's corporate update, Feb 23, 2022

  1. Slide 1: NorthWestern Energy – ETAC Meeting

    NorthWestern Energy – ETAC Meeting February 23, 2022 1. Intro and Discussion of Ascend Analytics (9:00-9:10) 2. AMI Update (9:10-9:40) 3. DSM Update (9:40-9:55) 4. Break (5 min) 5. Portfolio Modeling Update (10:00-10:55) 6. Public Comments (10:55-11:05) 7. Break (5 min) 8. Resource Costs (11:10-11:5

  2. Slide 2: AMI Update

    r AMI Update NorthWestern in righ

  3. Slide 3: DSM Update

    DSM Update 3

  4. Slide 4: Portfolio Modeling Update

    Portfolio Modeling Update 4

  5. Slide 5: Portfolio Modeling Plan

    Portfolio Modeling Plan Task Description Target Month for Completion Resource Adequacy Calculation capacity requirements to maintain March adequacy targets for Loss of Load Hours (2.4 hours per year) Capacity Expansion Future resource additions to the portfolio May Production Cost Modeling Simulatio

  6. Slide 6: Base Portfolio for 2022 - Capacity

    Base Portfolio for 2022 - Capacity • NorthWestern is capacity long until 2028 • Starting in 2028 contracted capacity declines • Solar and wind provide a small portion of capacity due to the low ELCC values 6

  7. Slide 7: Base Portfolio for 2022 - Energy

    Base Portfolio for 2022 - Energy • NorthWestern expects an energy surplus until 2035 • Wind and hydro generation provide the majority of energy 7

  8. Slide 8: Base Portfolio - Thermals

    Base Portfolio - Thermals Thermal/Natural Gas Generation Nameplate Capacity (MW) Accredited Capacity (MW) End Year Basin Creek 52 49.4 2036 Dave Gates 150 145.5 Yellowstone (fka Laurel; 2024 COD) 165 159.6 Thermal/Coal Generation Colstrip 222 203.7 2042 Yellowstone Energy Limited 52 Partnership (BGI

  9. Slide 9: Base Portfolio – Hydro

    Base Portfolio – Hydro Hydro Generation Nameplate Capacity (MW) Accredited Capacity (MW) End Date Thompson Falls 94 56.4 Cochrane 62 37.2 Ryan 71 42.6 Rainbow 64 38.4 Holter 53 31.8 Morony 49 29.4 Black Eagle 21 12.6 Hauser 19 11.4 Mystic 12 7.2 Madison 8 4.8 Turnbull Hydro LLC 13 7.8 2032 State of

  10. Slide 10: Base Portfolio - Wind

    Base Portfolio - Wind Nameplate Capacity Accredited Capacity Wind Generation - Online End Year (MW) (MW) Judith Gap Energy LLC 135 17.6 2026 Stillwater Wind LLC (WKN) 80 10.4 2043 South Peak Wind LLC 80 10.4 2035 Spion Kop Wind 40 5.2 Greenfield Wind LLC 25 3.3 2041 Big Timber Wind LLC (Greycliff) 2

  11. Slide 11: Base Portfolio - Solar

    Base Portfolio - Solar Solar Generation - Online Nameplate Capacity (MW) Accredited Capacity (MW) End Date Green Meadow Solar LLC 3 0.2 2042 South Mills Solar 1 LLC 3 0.2 2042 Black Eagle Solar LLC 3 0.2 2042 Great Divide Solar LLC 3 0.2 2042 Magpie Solar LLC 3 0.2 2042 River Bend Solar LLC 2 0.1 20

  12. Slide 12: Base Portfolio – Hybrid and Storage Resources

    Base Portfolio – Hybrid and Storage Resources Solar Hybrid - Future Nameplate Capacity (MW) Accredited Capacity (MW) End Date Trident Solar (160MW Solar + 80MW BESS; 80 MW Tx) 80 63 2044 Broadview I (160 MW Solar + 50 MW BESS; 80 MW Tx) 80 37 2042 Meadowlark (30 MW Solar + 12.5 MW BESS) 30 8 2042 Wi

  13. Slide 13: Candidate Resources

    Candidate Resources Typical Size Technology (MW) Natural Gas Combined Cycle 250 Natural Gas Internal Combustion Engine 18 Natural Gas Aeroderivative Turbine 50 Pumped Hydro 100 Green Hydrogen TBD DSM 10 Geothermal 20 Li Ion Battery 25 Wind 100 Solar 100 Hybrid – (wind or solar plus storage) 100 Adva

  14. Slide 14: Public Comments

    Public Comments Key Themes 1. Concerned about climate change 2. Want to see decarbonization plan 3. Early retirement analysis of Colstrip 4. Renewable energy and storage 5. Energy efficiency and demand response 14

  15. Slide 15: Specific Modeling Requests

    Specific Modeling Requests # Model Request Other Requests 1 Close Colstrip at end of 2022, 2025, 2026, 2027, Access to model. Target absolute emissions 2028, and 2030. Modeling scenarios should reductions. Climate change risks. More efficient include renewable resources plus storage, utilization of

  16. Slide 16: Specific Modeling Requests

    Specific Modeling Requests # Model Request 5 1) Model a range of DR resources (irrigation, commercial, residential) to meet capacity needs after 2023. 2)Model a scenario that considers limited availability of hydro resources due to aggressive drought 3)Model standalone operation of Colstrip Unit 4 w

  17. Slide 17: Specific Modeling Requests

    Specific Modeling Requests # Model Request 6 1. Use automated resource selection 2. Include a proxy market capacity resource based on the Powerex contract recently acquired through an RFP process. NorthWestern should consider whether it would be reasonable to adjust the contract capacity rate to ref

  18. Slide 18: Specific Modeling Requests

    Specific Modeling Requests # Model Request 6 (cont) • The model should be set up with the objective of achieving resource adequacy while limiting the addition of new natural gas generating capacity to no more than 315 MW • To the extent NorthWestern assumes non-operational QF projects that have obta

  19. Slide 19: Specific Modeling Requests

    Specific Modeling Requests # Model Request 7 • The 2022 plan should include accurate ELCCs that are based upon actual performance of Montana wind and solar resources. Further, because battery storage increases ELCC it should be included in all modeled wind/solar portfolios. • The 2022 procurement pl

  20. Slide 20: Proposed Scenarios

    Proposed Scenarios Core Scenarios: Theme Detail “Unconstrained Capacity Meet reserve margin with NWE portfolio. Otherwise, unconstrained model Expansion” “Decarbonization Plan” 100% net carbon free by 2050, interim targets TBD “Early Colstrip Retirements” Retire Colstrip in 2025, 2030, 2035 Sensitiv

  21. Slide 21: Capacity Accreditation

    r Capacity Accreditation NorthWestern sonnise

  22. Slide 22: E3 ELCCs from 2020 Supplement

    E3 ELCCs from 2020 Supplement 22

  23. Slide 23: Capacity Accreditation Review

    Capacity Accreditation Review • ELCCs calculated by E3 with RECAP for 2020 Supplement • Refreshed by NorthWestern with RECAP in 2021 • Updated Portfolio and Load Forecast • Laurel Natural Gas (175 MW) • Powerex Contract (100 MW) • Expected QFs • 305 MW Wind (Teton, Pondera, Wheatland, Jawbone, CBC 2

  24. Slide 24: Resource Costs

    r Resource Costs NorthWestern in righ

  25. Slide 25: MT 2022 Plan – Resource Cost Updates

    MT 2022 Plan – Resource Cost Updates ETAC Review Meeting – February 23, 2022

  26. Slide 26: New Resource – Cost Update Overview

    New Resource – Cost Update Overview • Generation + storage + combinations • Renewables – wind, solar, geothermal • Storage – batteries, pumped hydro • Thermal – CT, RICE, combined cycle • Overnight installed costs in 2022$ and 2023$ • Earliest notice to proceed (NTP) of 2023 • EPC project costs + ow

  27. Slide 27: New Resource – Sources Considered

    New Resource – Sources Considered • Previous NorthWestern Plans • RFP bid data • Actual project developments • Regional IRPs • Industry publications • Indicative pricing from equipment suppliers NWE MT 2022 Plan – Resource Cost Updates 27

  28. Slide 28: New Resource Cost Updates

    NWE MT 2022 Electricity Supply Resource Procurement Plan (Plan) New Resource Cost Updates 1 2020 Plan Supplement 2022 Plan Inputs 2,3 2,3 Resource Type Scale Overnight Capex Scale Overnight Capex (MW) (2020 $/kW) (MW) (2022 $/kW) 100 $ 1,611 100 $ 1,623 Wind 300 $ 1,453 100 $ 1,325 100 $ 1,460 Solar

  29. Slide 29: Slide 29

  30. Slide 30: Portfolio Requests

    r Portfolio Requests NorthWestern in righ

  31. Slide 31: Stakeholder Portfolio Requests

    Stakeholder Portfolio Requests • Submit requests by Dec 1 using new feedback form (link here and below) • We will review and follow up with any questions (can discuss at Dec mtg) • Key factors to consider: • To be comparable, portfolios must have the same level of reliability (capacity contribution)

  32. Slide 32: Stakeholder Portfolio Requests

    Stakeholder Portfolio Requests • Submit requests by Dec 1 using new feedback form (link here and below) • We will review and follow up with any questions (can discuss at Dec mtg) • Key factors to consider: • To be comparable, portfolios must have the same level of reliability (capacity contribution)

  33. Slide 33: RA Program Update

    r RA Program Update NorthWestern in righ

  34. Slide 34: Western Resource Adequacy Program Update

    Western Resource Adequacy Program Update www.westernpowerpool.org 34

  35. Slide 35: New Website

    New Website • Supply Planning Website: • https://www.northwesternenergy.com/about-us/gas-electric/electric-supply- resource-procurement-plan • Please sign up for the email distribution list: • https://lp.constantcontactpages.com/su/XE0SdNG • Submit portfolio requests and other feedback via the new f

  36. Slide 36: NorthWestern Energy – ETAC Meeting

    NorthWestern Energy – ETAC Meeting August 4, 2021 Thank you. 36