PT ABM Investama Tbk · IDX:ABMM

PT ABM Investama Tbk — Debt Investor Presentation (October 2020)

19 slides from PT ABM Investama Tbk's debt investor presentation, October 2020

  1. Slide 1: Company Presentation October 2020

    ‘empoweringeneray COMPANY PRESENTATION PT ABM Investama Tbk. October 2020 Integrated Value Chain for Sustainable Business BeBOLD Rantai Nilai Terpadu untuk Bisnis yang Berkelanjutan GoBEYSND Copyrig® ©2020 ABM Group. All Rights Reserved

  2. Slide 2: Group structure and restricted group

    Hamami Family 100.00% 93.00% PT Tiara Marga Trakindo Valle Verde Pte Ltd Public (“TMT Group”) 23.00% 56.00% 21.00% Restricted Group 100% 100% 100% 99.99% 100% 100% 100% 99.99% 99.12% PT Tunas Inti Abadi PT Alfa Trans Raya PT Andara Candria (TIA) 100% (ATR) Energi 70.00% PT Mifa Bersaudara 99.99% 99.

  3. Slide 3: Hamami Family and TMT Group

    ◼ TMT Group is 100% owned by the Hamami Family Hamami Family ◼ was founded by AHK Hamami in 1970 and has developed into one of the largest domestic conglomerates in Indonesia for 50 years period ◼ became the sole authorized dealer for Caterpillar in TMT Group 1971 and now has over 70 branches servin

  4. Slide 4: ABM Mining Value Chain (MVC)

    ABM Mining Value Chain (MVC) te Logistics & Transport Solutions Overburden angCoal useing Engineering & Fabrication Industrial shipping “te di sanccarsanaensass Coal o 9 S| & Coal Transshipment Process ‘ es Coal Logistics Solutions é Process Z “= -— 96 conta Toadini 4 ecleaia 4 GS vaacing Coal to Ba

  5. Slide 5: 2020 EBITDA by segment

    2020 EBITDA 10% 70 - 80% 10 - 20% Mining Mining Services Mining Enabler Mining Barging Stevedoring Port Fuel Services Integrated Engineering Contractor Management Logistics 5

  6. Slide 6: Coal price and cost efficiency

    Coal Prices are depressed now, but will recover post COVID Coal Price Initiate many projects for cost Cost Coal Sales & OB Removal volume efficiency, including LEAN Mining Volume Efficiency will achieve a new record in 2020 Project in CK in order to reduce cost Aligned with efforts for cost efficien

  7. Slide 7: Annual World GDP and Australian Thermal Coal price

    Australian Thermal Coal - 6300 GAR, $/MT Annual World GDP (yoy growth) 140 127.1 121.4 120 107.0 100 99.0 96.4 88.5 80 84.6 77.9 71.8 70.1 60 65.7 66.1 58.9 58.5 53.0 40 47.6 49.1 32.3 Source: World Bank Global Economic Prospects 20 25.3 26.1 • GDP is expected to start improving by Q4-2020 - 2001 20

  8. Slide 8: Coal Sales and OB Removal volumes

    Coal Sales (mn ton) ICI 4 Price 14.9 14.6 Mifa 13.4 13.9 TIA 12.3 12.0 49.4 44.9 42.9 42.1 11.8 40.3 37.1 9.9 9.1 12.0 12.0 35.1 10.5 30.6 32.2 12.0 7.9 28.1 7.2 6.8 12.0 6.4 5.3 5.8 4.6 3.2 2.9 2.9 2.6 1.9 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020-O 2021-F 2022-F 2023-F 2024-F 2025-F OB Rem

  9. Slide 9: Lean mining and cost improvement initiatives

    Secure life of mine • Design lean mining • R&M cost improvement Lean mining contracts with the organization o Optimize Undercarriage Lifetime excellent project following criteria : • Development for Dozer and Excavator initiatives : • Strategic program to mining o Reducing un-schedule R&M • Hauling

  10. Slide 10: Road and fleet management indices

    Standard Road Grade % Grade > 8% : % Matching Fleet factor Match Factor: MF Inner Drainage Inspection Inner drainage Index : IDI Speed Road mapping % Road < 19 km/jam: % Front Condition Road Drainage Inspection Front Cond Index : FCI Road drainage Index : RDI 10

  11. Slide 11: CK productivity and utilization improvement 2020

    +85% 15.8 13.8 12.4 In 2020, CK has improved productivity and 11.0 10.1 utilization, also lowered 9.1 fuel index 8.5 8.4 Jan Feb Mar Apr May Jun Jul Aug 11

  12. Slide 12: Concession coal quality and reserves

    MIFA • Coal Quality (GAR): 3,400 • Coal Reserve: 212.0 Mn MT BMB • Coal Quality (GAR): 4,200 MIFA • Coal Reserve: 99.5 Mn MT MHU • Coal Quality (GAR): 5,400 • Coal Reserve: 200 Mn MT KIM • Coal Quality (GAR): 4,700 MHU • Coal Reserve: 68.6 Mn MT KIM BMB DMP TIA TIA • Coal Quality (GAR): 4,200 • Coal

  13. Slide 13: Coal sales and ICI-4 price trends

    670-770 65.5 773.1 45 - 50 690.7 600-700 590.7 42.9 42.1 592.4 35.1 42.9 42.1 35.1 12.6 7.6 32.2 5.6 32.2 28.1 28.1 (1) – (5) 2016 2017 2018 2019 2020 - O 2016 2017 2018 2019 2020 - O ICI-4 Price ICI-4 Price 195.3 170-190 157.1 120-140 166.0 171.6 140.7 42.9 42.1 42.9 42.1 118.9 100-120 101.9 92.2 3

  14. Slide 14: ESG: Good Mining Practices, People and Governance

    Good Mining Practices To minimize the environmental impact of its operational activities, refers to the highest standards (ISO 14001 and PROPER), take part to mitigate carbon emission and water stress E Programs : - Integrated land rehabilitation E - Reclamation & revegetation of ex- concession area

  15. Slide 15: Reclamation and Watershed Rehabilitation

    Reclamation and Revegetation Watershed Rehabilitation Outside the of Ex Concession Area Concession Area (Upstream Area) 2015 2018 2019 Mitigations : Mitigations : • Accelerated land reclamation & rehabilitation using fast growing plants • Upstream watershed land rehabilitation • “Void” usage as a co

  16. Slide 16: Coral Reef Replantation and Biodiversity Conservation

    Coral Reef Replantation (Downstream Area) Biodiversity Conservation of Endangered Animals Mitigations : Mitigations : • Support local conservation response unit • Coral reef replantation with active participatory from local • Strategic partnership for elephant conservation community & practitioners

  17. Slide 17: One Village One Product

    One Village One Product Programs : • Nurture local community in self-sufficient food security • Support local community in building economic resilience through environmental-friendly (organic) product 17

  18. Slide 18: Welder Development Program

    Welder Development Program Fresh Green Mechanic & Operator Programs : Programs : • Capacity building (management skill training) for local community • Local community recruitment & training • Building economic shared value through partnership between • Strategic partnership with stakeholder to devel

  19. Slide 19: Thank you and disclaimer

    =, ABM Integrated Value Chain for Sustainable Business Rantai Nilai Terpadu untuk Bisnis yang Berkelanjutan BeBOLD GoBEYOND TERIMA KASIH Disclaimer: ‘This presentation has been prepared by the company solely for general information, untess clearly stated otherwise in the presentation and does not co

PT ABM Investama — Debt Investor Presentation (October 2020) on 6ix