Venus Metals Corporation Limited · ASX:VMC

Venus Metals — Investor Presentation (August 2014)

24 slides from Venus Metals's investor presentation, Aug 11, 2014

  1. Slide 1: Company Presentation August 2014

    For personal use only ACN: 123 250 582 Company Presentation August 2014

  2. Slide 2: Disclaimer

    DISCLAIMER • This presentation has been prepared by Venus Metals Corporation Limited (ABN 99 123 250 582 ) (“VMC”) based on information For personal use only available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the i

  3. Slide 3: Competent Person Declaration

    Competent Person Declaration: The information in this report that relates to Exploration Targets, Exploration Results, Target Potential Mineral Resources is based on information compiled by: For personal use only Mr Scott Raymond Bishop, who is a Member of the Australasian Institute of Mining and Me

  4. Slide 4: Directors and Management Team

    DIRECTORS AND MANAGEMENT TEAM For personal use only Terry Hogan Matthew Hogan Kumar Arunachalam Barry Fehlberg Non Executive-Chairman Managing Director Executive Director Senior Geological Consultant +40 yrs Corporate +25 yrs Corporate +30 yrs Experience in +40 yrs of multi-commodity Management, pas

  5. Slide 5: Capital Structure

    CAPITAL STRUCTURE For personal use only ASX: VMC Ordinary Fully Paid Shares 50.6 M Listed Options ex 30/11/16 @ $0.20 25.3 M Unlisted Options- granted 400,000 ex 31/07/15 @ $2.00 Unlisted ESOP Options- granted 125,000 ex 30/11/16 @ $0.20 Unlisted Consultant Options- granted 200,000 ex 30/11/16 @ $0.

  6. Slide 6: Venus Exploration Projects

    VENUS EXPLORATION PROJECTS For personal use only 6

  7. Slide 7: Copper Hills

    COPPER HILLS PROJECT For personal use only A first class drilling target has been identified at PM Prospect, Copper Hills based on recent geological mapping, sampling and airborne EM data evaluation. The prospect occurs in metamorphic Proterozoic rocks of the Rudall Complex, a Proterozoic province t

  8. Slide 8: Copper Hills

    COPPER HILLS PROJECT For personal use only 8

  9. Slide 9: Copper Hills Simplified Paterson Orogen Geology Map

    COPPER HILLS PROJECT For personal use only Simplified Paterson Orogen Geology Map (adapted from Anderson, BR (1999 PhD Thesis) 9

  10. Slide 10: Copper Hills/PM Prospect Surface Grab Sample Locations

    COPPER HILLS/PM PROSPECT For personal use only Location of surface grab samples at PM Prospect 10

  11. Slide 11: Copper Hills/PM Prospect Shallow Trenches

    COPPER HILLS/PM PROSPECT For personal use only Shallow Trenches with boulders of secondary Copper Mineralization 11

  12. Slide 12: Copper Hills/PM Prospect

    COPPER HILLS/PM PROSPECT For personal use only 12

  13. Slide 13: Paterson Tempest CDI Line 10820 and Model Plate

    COPPER HILLS/PM PROSPECT For personal use only Paterson Tempest CDI for Line 10820 and Model Plate looking towards Southwest with historical drillholes 13

  14. Slide 14: Youanmi Sandstone Joint Venture

    YOUANMI SANDSTONE PROJECT For personal use only  Joint Venture VMC 90%  The Joint Venture tenement package comprises a major holding in the Youanmi greenstone belt, a strongly mineralised area known for substantial past gold production, together with strong copper, nickel, zinc and a large outcrop

  15. Slide 15: Youanmi - Sandstone

    YOUANMI - SANDSTONE PROJECT For personal use only 15

  16. Slide 16: Youanmi Project

    For personal use only YOUANMI PROJECT 16

  17. Slide 17: Geology Map of Youanmi Layered Intrusion

    YOUANMI PROJECT For personal use only Geology Map of Youanmi Layered Intrusion 17 (modified from Sirius Resources)

  18. Slide 18: Sandstone Project

    For personal use only SANDSTONE PROJECT 18

  19. Slide 19: Curara Well

    CURARA WELL PROJECT For personal use only  New Exploration Licence Applications (ELA 52/3068 and ELA 52/3069) at Curara Well in Peak Hill Mineral Field.  The tenements are located 6-10 km north–northeast of the large high grade DeGrussa massive sulphide deposit of Sandfire Resources NL and the new

  20. Slide 20: Curara Well

    CURARA WELL PROJECT For personal use only 20

  21. Slide 21: Yalgoo Iron Ore Project JV

    YALGOO IRON ORE PROJECT JV For personal use only Yalgoo Iron Ore Project (YIOP) is centrally placed within Western Australia’s Mid-West Iron Ore Province. A JORC compliant total Magnetite Mineral Resource of 698.1 Million Tonnes (being an Indicated Resource of 311.2 Mt and an Inferred Resource of 38

  22. Slide 22: Yalgoo Nickel

    YALGOO NICKEL PROJECT For personal use only NE-SW striking ultramafic units approximately 1300 m long by 300m wide within E59/1611. Encouraging Nickel- Cobalt assays have been received from reverse circulation drill hole YGR001 (refer ASX Release 5 June 2014). Recently DMP awarded $150,000 drilling

  23. Slide 23: Yalgoo Projects

    YALGOO PROJECTS For personal use only Bilberatha Hill Iron Ore Deposit Yalgoo Nickel Project 23

  24. Slide 24: Contact Details

    CONTACT DETAILS For personal use only REGISTERED OFFICE & PRINCIPAL PLACE OF BUSINESS Level M, BGC Centre 28 The Esplanade Perth WA 6000 Tel: +61 8 9321 7541 Fax: +61 8 9486 9587 Internet: www.venusmetals.com.au 24

Venus Metals — Investor Presentation (August 2014) on 6ix