Chalice Mining Limited · ASX:CHN

Chalice Mining — RRS Gather Round Conference 2025

27 slides from Chalice Mining's conference presentation, Apr 10, 2025

  1. Slide 1: The leading palladium-nickel-copper project in the Western World

    For personal use only The leading palladium- nickel-copper project in the Western World APRIL 2025 ASX:CHN ASX: CHN

  2. Slide 2: Chalice Mining is a leading critical minerals explorer-developer in Western Australia

    Chalice Mining is a leading critical minerals explorer-developer in the world’s best mining jurisdiction – Western Australia Discoverer and 100% owner of the largest palladium- Asset nickel-copper Resource1 in the Western World (Gonneville) For personal use only – 17Moz 3E, 960kt Ni, 540kt Cu, 96kt

  3. Slide 3: Uniquely strong financial position and stable, highly institutional register

    Chalice has a uniquely strong financial position and a stable, highly institutional register Major shareholders3 ASX:CHN 12-month performance ($/share) For personal use only Tim Goyder 2.50 8% 2.00 Retail/Other 54% 38% 1.50 Institutional Paradice (5%) Others (33%) 1.00 0.50 Capital structure Shares

  4. Slide 4: Why palladium? Trump 2.0 policy, hybrid-ICE growth and price at cyclical lows

    Why palladium? Trump 2.0 policy settings, rapid growth of hybrid-ICE vehicles and price at cyclical lows – CHN leveraged to price rebound Chalice share price (A$/share) vs Palladium spot price (A$/oz, LBMA) For personal use only 12.00 Chalice Palladium (A$) 4,500 Norilsk 4,000 flooding 10.00 Auto de

  5. Slide 5: Why palladium? Battery electric vehicle adoption has slowed

    Why palladium? Battery electric vehicle adoption has slowed dramatically and demand for ICE/hybrid vehicles continues to grow Total passenger vehicle sales (China, US, Europe) For personal use only Global BEV market share Vehicles with Pd (ICE, Hybrid) Palladium demand driven largely by automative c

  6. Slide 6: Why palladium? Supply concentrated in Russia and South Africa

    Why palladium? Supply is concentrated in Russia and South Africa where supply risks are high and disruptions are common For personal use only Global Palladium Supply Market Share (2024) The global automotive sector relies on a very unstable and geopolitically problematic supply chain… • Production l

  7. Slide 7: Why palladium? Supply forecasts are always overly optimistic

    Why palladium? Supply forecasts are always overly optimistic – large number of mines are loss making and recycling underperforms For personal use only Primary PGE Supply Actual vs Forecasts Recycled PGE Supply Actual vs Forecasts Supply forecasts are notoriously optimistic, and with growing demand →

  8. Slide 8: Gonneville PGE-Ni-Cu-Co Project Overview

    Gonneville PGE-Ni-Cu-Co Project Overview A new long-life, low-cost, low-carbon, strategic critical minerals project in Western Australia Strategic non-binding MOU with Mitsubishi Corporation For personal use only Top tier development partner, collaborating on the PFS and offtake strategy1 Tier 1 sca

  9. Slide 9: The Project has been substantially de-risked since discovery in 2020

    The Project has been substantially de-risked by Chalice since our discovery in 2020 Drilled out to Indicated category, to depth of ~450m, Inferred Resources Resource For personal use only continue to depth of 1,100m Acquired 22km2 of farmland surrounding the Resource in 2021-22, significantly Tenure

  10. Slide 10: Recent major metallurgical breakthrough simplifies the Project

    Recent major metallurgical breakthrough fundamentally simplifies the Project – saleable concentrates across the full grade range Sizing Grinding For personal use only Oxide feed Crushing Grinding Copper Flotation Nickel Flotation CIL Leach Sulphide feed Blend (~4:1 Sulphide:Oxide) Offtake of Cu- Off

  11. Slide 11: Recent major metallurgical breakthrough simplifies the Project (recoveries)

    Recent major metallurgical breakthrough fundamentally simplifies the Project – saleable concentrates across the full grade range Sizing Grinding For personal use only Oxide feed Crushing Grinding Copper Flotation Nickel Flotation CIL Leach Sulphide feed Blend (~4:1 Sulphide:Oxide) Offtake of Cu- Off

  12. Slide 12: Simplifying the flowsheet has materially reduced costs and risk

    Simplifying the flowsheet has materially reduced costs and risk, and is expected to enhance margins for a bulk open-pit operation Item Impact of new process flowsheet For personal use only Capital costs • Significant reduction due to removal of hydrometallurgical process (~A$260M) (pre-production) •

  13. Slide 13: Gonneville expected to be very competitive, with 2nd quartile AISC

    With open-pit mining costs and simple low-cost processing, Gonneville is expected to be a very competitive asset, with 2nd quartile AISC PGE industry all-in sustaining cost curve (cash costs plus sustaining CapEx), net of by-product credits, US$/oz 4E 2023A1 For personal use only Quartile 1 Quartile

  14. Slide 14: Beyond Gonneville, >40 Cu-Au-Ag and Ni-Cu-PGE targets in West Yilgarn

    Beyond Gonneville, Chalice has defined >40 Cu-Au-Ag and Ni-Cu-PGE targets in the West Yilgarn Province • ~1,200km long western margin of the Yilgarn For personal use only craton largely unexplored Narryer Project • Exciting new search space for intrusion-related / orogenic copper-gold+/-silver and W

  15. Slide 15: Gold-copper focus at Barrabarra has yielded new targets

    Gold-copper focus at Barrabarra has yielded exciting new targets, with results pending for two phases of AC drilling • Exciting new large-scale gold targets at the 4,600km2 Barrabarra Project For personal use only • Recherche West – 15km long gold- in-soil anomaly • Warspite – 2km long gold-in-soil

  16. Slide 16: Fully funded to progress key development and exploration activities

    Chalice is fully funded to progress key development and exploration activities, with ~A$90M in cash and listed investments Milestones achieved Status Forward Plan1 Status For personal use only Gonneville discovery Gonneville variability testwork and Ongoing Mar-20 flowsheet optimisation Maiden Miner

  17. Slide 17: Summary

    Summary For personal use only Chalice owns the leading palladium-nickel-copper development project in the Key value drivers western world 1. Palladium price recovery driven by Trump 2.0 policies, slowing BEV uptake, strong ICE/hybrid vehicle sales and structural challenges in supply Chalice’s team h

  18. Slide 18: Appendix

    For personal use only Appendix ASX: CHN

  19. Slide 19: Cautionary statements and competent person(s) disclosure

    Cautionary statements and competent person(s) disclosure Authorisation Forward Looking Statements This Presentation has been authorised for release by the Disclosure Committee. This Presentation may contain forward-looking statements and forward information, (collectively, forward-looking statements

  20. Slide 20: Cautionary statements and competent person(s) disclosure (cont'd.)

    Cautionary statements and competent person(s) disclosure (cont’d.) Reliance on Third Party Information materially modified from the relevant original market announcements. The views expressed in this Presentation contain information that has been derived from third party sources that have not been P

  21. Slide 21: Our discovery in 2020 defined the Company's DNA

    Our discovery in 2020 defined the Company’s DNA – we have a dual focus on developing Gonneville and making further discoveries For personal use only 01 02 03 Generate New Discoveries Define New Resources De-Risk Development • Conceptualise, define and prioritise new • Make new major discoveries and

  22. Slide 22: Board of Directors and Executive Management

    Board of Directors and Executive Management Board of Directors Key Management Derek La Ferla, Non-Executive Chair Chris MacKinnon, Chief Financial Officer For personal use only • Highly regarded ASX200 chair and company director with • Qualified accountant and lawyer with 15+ years experience of 30+

  23. Slide 23: Big critical minerals discoveries are becoming increasingly rare

    Big critical minerals discoveries are becoming increasingly rare in the western world – demand is likely to outpace supply over long term Number of base metal (Ni, Cu, Zn, Pb) discoveries in the World by size – 1900-2021 50 only Post WWII boom and new Rise of China and surge in 60 modern exploration

  24. Slide 24: Our approach to sustainability

    Our approach to sustainability: Deliver sustained shared value through responsible sustainability practices For personal use only Our Sustainability Vision and Pillars Strong Environmental Manage Climate Create Value for Healthy and Safe Stewardship Change Risk Stakeholders Workforce The Gonneville

  25. Slide 25: The rare Gonneville critical minerals Resource has high-grade optionality

    The rare Gonneville critical minerals Resource has high-grade optionality and compelling growth potential High Grade Mineral Resource Estimate1: Gonneville NSR Grade-Tonnage table2 For personal use only • 59Mt @ 2.0g/t 3E (Pd+Pt+Au), 0.20% Ni, 0.21% NSR Cut-off NSR Cut-off in Total Mass Grade in-pit

  26. Slide 26: Higher-grade sulphide component of Gonneville Resource

    Higher-grade sulphide component of Gonneville Resource (in pit and underground), 23 April 2024 Domain Cut-off NSR (A$/t) Classification Mass Grade Contained metal For personal use only (Mt) Pd (g/t) Pt (g/t) Au (g/t) Ni (%) Cu (%) Co (%) Pd (Moz) Pt (Moz) Au (Moz) Ni (kt) Cu (kt) Co (kt) Measured 0.

  27. Slide 27: Gonneville Mineral Resource Estimate (JORC Code 2012), April 2024

    Gonneville Mineral Resource Estimate (JORC Code 2012), 23 April 2024 Domain Cut-off NSR (A$/t) Classification Mass Grade Contained metal For personal use only (Mt) Pd (g/t) Pt (g/t) Au (g/t) Ni (%) Cu (%) Co (%) Pd (Moz) Pt (Moz) Au (Moz) Ni (kt) Cu (kt) Co (kt) Measured - - - - - - - - - - - - - In

Chalice Mining — RRS Gather Round Conference 2025 on 6ix