Energy Resources of Australia Ltd. Class A · ASX:ERA

Energy Resources of Australia Ltd. Class A — Corporate Update (April 2013)

18 slides from Energy Resources of Australia Ltd. Class A's corporate update, Apr 24, 2013

  1. Slide 1: ERA update

    ERA update Rob Atkinson – Chief Executive Steeve Thibeault – Chief Financial Officer April-May 2013 1

  2. Slide 2: Acknowledge Traditional Owners

    Acknowledge Traditional Owners • The mining operations of Energy Resources of Australia Ltd (ERA) are located on Aboriginal land and are surrounded by, but separate from, Kakadu National Park • ERA respectfully acknowledges the Mirarr, Traditional Owners of the land on which the Ranger mine is situa

  3. Slide 3: Forward-looking statement

    Forward-looking statement • This presentation has been prepared by Energy Resources of Australia Ltd (“ERA”) and consists of the slides for a presentation concerning ERA. By reviewing/attending this presentation you agree to be bound by the following conditions. Forward-looking statements • This pre

  4. Slide 4: Agenda

    Agenda • Safety and people • Operations • Water management • Brine Concentrator • Progressive rehabilitation • Ranger 3 Deeps • Mining Agreement • ERA and the region • Market outlook • Financial • Summary 4

  5. Slide 5: Safety and people

    Safety and people Safety People and diversity – 2013 All Injury Frequency Rate (AIFR) of 0.50 (YTD) – ERA is a major employer in the West Arnhem region – One recordable injury has occurred in 2013. The – 16 per cent indigenous employees employee has made a full recovery and returned to – 20 per cent

  6. Slide 6: Operations performing well

    Operations performing well • Mining – Significant progress with the Pit 3 backfill – High mining fleet efficiency – 30 million tonnes of waste rock needs to be backfilled by Q3 2014 – Backfilling is important to prepare Pit 3 as a tailings and brine repository from 2015 • Plant – Plant performing we

  7. Slide 7: Water management

    Water management • The 2012-13 wet season rainfall to date has been approximately 80 per cent of the long term average • ERA’s water management capability and capacity has been greatly improved and is in a strong position to manage extreme weather events • Independent Surface Water Working Group (IS

  8. Slide 8: Brine Concentrator on budget and schedule

    Brine Concentrator on budget and schedule • The Brine Concentrator was manufactured and supplied by HPD, a subsidiary of Veolia Water Solutions and Technologies • Hatch Pty Ltd is the EPCM contractor and Downer EDI Limited is undertaking the construction phase of the project • Civil works completed

  9. Slide 9: Progressive rehabilitation

    Progressive rehabilitation • Rehabilitation provision as at 31 December 2012 is $640 million (discounted) – Pit 3 backfill costs to date slightly lower than originally planned • Work to be performed over 2013-2015 period represents approximately 25 per cent of the total rehabilitation activities • S

  10. Slide 10: Ranger 3 Deeps exploration decline on budget and schedule

    Ranger 3 Deeps exploration decline on budget and schedule • Macmahon Underground Pty Ltd is constructing the exploration decline • The decline construction progressed very well in Q1 2013. At 26 April 2013 the face position of the decline is 715 metres from the surface Underground diamond drilling p

  11. Slide 11: Ranger 3 Deeps underground mine study

    Ranger 3 Deeps underground mine study • $57 million underground mine Prefeasibility Study approved by the ERA Board. Prefeasibility Study progressing on schedule and within budget • On 13 March the Department of Sustainability, Environment, Water, Population and Communities (SEWPaC) announced that t

  12. Slide 12: Ranger 3 Deeps milestones

    Ranger 3 Deeps milestones Ranger 3 Deeps Target Completed Forecast milestones to production Regulatory approval for exploration decline granted August 2011 Box cut excavation completed October 2012 Decline tunnel construction commences November 2012 Ranger 3 Deeps mine referral submitted to governme

  13. Slide 13: Mining Agreement

    Mining Agreement • A suite of agreements with the Mirarr Traditional Owners, the Northern Land Council and the Commonwealth Government were executed on 24 January 2013 • Mining Agreement provides a structured approach for ongoing collaboration between the Gundjeihmi Aboriginal Corporation and ERA an

  14. Slide 14: ERA and the Region

    ERA and the Region • The future of ERA and Jabiru are significantly intertwined • ERA contributes* – − $265 million to Jabiru’s gross regional value (87 per cent) − $273 million to Alligator River Region’s gross regional value (58 per cent) − $580 million to the Northern Territory’s gross value (3.6

  15. Slide 15: Longer term market fundamentals strong

    Longer term market fundamentals strong • Global economic slowdown and the Fukushima incident resulted in a reduction in prospective nuclear new-build, however long-term growth projections remain strong. • The growth drivers are largely unchanged − Economic growth in developing economies, such as Chi

  16. Slide 16: Financials

    Financials • As of 31 December 2012 – ERA had $465 million in cash – ERA achieved a total of $75 million savings related to its 2011 Business Review programme. – ERA on track to save $150 million by end of 2014 • Continued strong focus on cash preservation and reducing costs in light of current busi

  17. Slide 17: Summary

    Summary • Continued strong safety and environmental performance • Water management is in a strong position • 2013 production of uranium oxide is expected to be between 2,700 and 3,300 tonnes • ERA will continue to significantly restructure the business to adapt to lower production levels and will co

  18. Slide 18: Ranger 3 Deep exploration decline

    Ranger 3 Deep exploration decline ROM stockpiles Brine Concentrator Ranger 3 Deeps exploration decline March 2013 18