Liberty Gold Corp · TSX:LGD

Liberty Gold — Investor Presentation (February 2026)

29 slides from Liberty Gold's investor presentation, February 2026

  1. Slide 1: Disciplined Development of Great Basin Oxide Gold

    Disciplined Development of Great Basin Oxide Gold TSX LGD OTCQX LGDTF February 2026

  2. Slide 2: Cautionary Notes & Technical Disclosures

    Cautionary Notes & Technical Disclosures All statements in this presentation, other than statements of historical fact, are "forward-looking information" and “forward-looking statementsˮ with respect to Liberty as actual results, and future events could differ materially from those anticipated in su

  3. Slide 3: Timing is Everything

    Timing is Everything The Discipline of Delivery Poised to Realize Value Black Pine The Science of Discovery L I B ER T YG O L D . CA T SX L G D O T CQ X L G D T F 3

  4. Slide 4: Company Highlights

    Company Highlights OUR FOCUS 1. A Rare, Executable USBased Gold Project Black Pine Gold Project • One of the few large-scale oxide gold deposits in the US South Eastern Idaho • Size 4.9M oz indicated gold resource1), strong economics, 4.9M oz Au, past-producing, open-pit, large-scale, and technica

  5. Slide 5: Our Leadership Team: Built To Build Mines

    Our Leadership Team: Built To Build Mines Board of Directors Management Greg Etter Jon Gilligan Joanna Bailey Brad Ralph BOARD CHAIR PRESIDENT & CHIEF EXECUTIVE OFFICER CFO & CORPORATE SECRETARY SENIOR VP CORPORATE DEVELOPMENT Wendy Louie Lisa Wade Pete Shabestari Tyler Cole DIRECTOR DIRECTOR VP EXP

  6. Slide 6: Capital Structure & Ownership

    Capital Structure & Ownership Capital Structure Ownership Shares Outstanding 516.5 M Institutions and Funds 40.6% Options 17.5 M Centerra Gold Inc. 9.7% Warrants 45.4 M Management, Insiders & Advisors 3.9% Exercise price C$0.45, expire May 17, 2026 13.7 M Wheaton Precious Metals Corp. Exercise price

  7. Slide 7: 2026 Key Catalysts

    2026 Key Catalysts Black Pine, Idaho  Q1 Acceptance into the FAST41 U.S. Federal Permitting Framework  Q1 Feasibility Mineral Resource Estimate • Q1 Drill Assays from 2025 Program • Q1 Federal Registry of Notice of Intent Commence Environmental Impact Statement • Q1 Updated Permitting Timeta

  8. Slide 8: Black Pine Gold Project

    Black Pine Gold Project Southern Idaho, USA

  9. Slide 9: Black Pine Gold Project Overview

    Black Pine Gold Project Overview Technically Simple & Largely De-Risked • Located in Idaho with excellent project access and strong local community relationships • Planned open-pit, run-of-mine, heap-leach operation • Water rights secured • Power supply at mine gate • No timber values, no threatened

  10. Slide 10: 2024 Preliminary Feasibility Study

    Black Pine Gold Project 2024 Preliminary Feasibility Study A low capital intensity, long-lived open-pit, run-of-mine heap leach project. 1 183K oz $1,208 17 yrs 2.2M OZ 135K oz $1,381 MINE LIFE LOM GOLD PRODUCTION ANNUAL PRODUCTION AISC 3.3 yrs 32% $550 M $327 M 1.3 yrs 81% $1,785 M INITIAL CAPITAL

  11. Slide 11: Plan of Operations – 2024 PFS Site Layout

    Black Pine Gold Project Plan of Operations – 2024 PFS Site Layout L I B ER T YG O L D . CA T SX L G D O T CQ X L G D T F 11

  12. Slide 12: 2024 PFS Gold Production & Cost Profile

    Black Pine Gold Project 2024 PFS Gold Production & Cost Profile Simple Operation with Strong early years production profile with a long mine life Low Unit Operating Costs1 • Targeted : 500 koz addition in Indicated Resource • Open pit, run-of-mine heap leach operation.  Delivered: 719 koz of new In

  13. Slide 13: 2024 PFS to 2026 Feasibility Resource Progression

    Black Pine Gold Project 2024 PFS to 2026 Feasibility Resource Progression 2024 PFS RESERV E 2026 FEASIBILITY RESERV E 3.11 Moz Gold Probable Mineral Reserves @ $1,650/oz Au1 2024 PFS RESOURCE 2026 FEASIBILITY RESOURCE 4.16 4.88 Indicated Indicated Mineral Resources @ $2,000/oz Au, Mineral Resources

  14. Slide 14: Mineral Resource Growth

    Black Pine Gold Project Mineral Resource Growth Note: The information presented in this map and table is derived from publicly available sources, including Liberty Gold press releases and related public disclosure, as follows: July 13, 2021 press release; February 7, 2023 press release; October 10,

  15. Slide 15: 2026 Mineral Resource Estimate

    Black Pine Gold Project 2026 Mineral Resource Estimate At a 0.1 g/t cut-off, the Mineral Resource contains1: • Indicated resource of 540.6 million tonnes grading 0.30 g/t Au, containing 4,882,000 ounces of oxide gold • Inferred resource of 157.1 million tonnes grading 0.21 g/t Au, containing 1,050,0

  16. Slide 16: Rangefront Zone Mineral Resource Cross-Section

    Black Pine Gold Project Rangefront Zone Mineral Resource Cross-Section • 2,016,000 Indicated oxide gold ounces • Highest average gold recoveries • 41% of the Indicated Resource • Close proximity to leach pad • Low expected waste:mineralization ratio L I B ER T YG O L D . CA T SX L G D O T CQ X L G

  17. Slide 17: Discovery Zone Mineral Resource Cross-Section

    Black Pine Gold Project Discovery Zone Mineral Resource Cross-Section • 2,109,000 Indicated oxide gold ounces • Highest weighted avg gold grade • 43% of the Indicated Resource • High leverage to gold price drives expected rapid payback L I B ER T YG O L D . CA T SX L G D O T CQ X L G D T F 17

  18. Slide 18: Feasibility Program

    Black Pine Gold Project Feasibility Program Drilling and Resource Advancement • 40,000 metre drill program completed in 2025 • Feasibility Resource Estimate updated • Drill planning underway for further 2026 Feasibility drilling Metallurgy and Technical Validation • Large-diameter column testing and

  19. Slide 19: Permitting

    Black Pine Gold Project Permitting Federal | FAST41 Coordinated Review • Accepted into the U.S. FAST41 permitting framework, enabling coordinate federal review • MOUs in place with U.S. Forest Service and Bureau of Land Management • Cost recovery agreements executed; federal technical teams assign

  20. Slide 20: Advancement Timeline

    Black Pine Gold Project Advancement Timeline Indicative timeline showing parallel advancement of engineering, environmental, permitting, and community engagement workstreams 2026 2027 2028 Engineering & Feasibility Study Long-Lead Final Engineering Gold Orders Project Execution Completed Placed Comp

  21. Slide 21: Goldstrike Gold Project

    Goldstrike Gold Project Utah, USA

  22. Slide 22: Goldstrike

    Goldstrike Located in SW Utah 50 km by road NW of St. George • No material environmental constraints identified • BLM surface rights with unpatented claims and patented mineral leases • Process water supply de-risking in progress • Non-core critical minerals assets under strategic review1 Goldstrike

  23. Slide 23: 2026 Corporate Catalysts

    2026 Corporate Catalysts Black Pine Feasibility Study Black Pine Permitting Execution & Capital Markets 2025 Drilling Assay results Notice of Intent expected Q1 Engineering and capital cost supporting Feasibility inputs Q1 refinement supporting Feasibility Environmental Impact Study delivery Upd

  24. Slide 24: Black Pine Appendix

    “ee Black Pine Appendix

  25. Slide 25: Mineral Resource Estimate Distribution & Sensitivities

    Black Pine Gold Project Mineral Resource Estimate Distribution & Sensitivities Tonnes Average Grade Gold Ounces % Tonnes % Indicated Tonnes Average Grade Gold Ounces Waste:Ind+Inf Zone Classification Block cut-off grade Classification (Mt) (g/t Au) (000) (oz) (Ind & Inf) MRE Oz (Mt) (g/t Au) (koz) T

  26. Slide 26: Converted & Added Oxide Gold Resource Ounces

    Black Pine Gold Project Converted & Added Oxide Gold Resource Ounces Waterfall chart shows converted and added oxide gold resource ounces: 7,000 Oxide Gold Resource Ounces 000 oz • Converted indicated ounces 349,000 oz) 6,000 687 1,050 • Added indicated ounces 370,000 oz) 5,000 363 • Added infer

  27. Slide 27: PFS Metallurgy

    Black Pine Gold Project PFS Metallurgy Advanced Metallurgical Model at PFS Cross-section through Geo-metallurgical Domain Block Model • 6 phases of test work completed on bulk samples and large-diameter drill core composites 174 column tests completed) • Rapid gold extraction with 80% of leachable

  28. Slide 28: Endnotes

    Endnotes Black Pine Mineral Reserve Estimate • The Mineral Reserve estimate was prepared by AGP Mining Consultants Inc., Toronto, Canada (“AGPˮ) and has an effective date of June 1, 2024. The Qualified Person responsible as defined under NI 43101 for the Mineral Reserve estimate is Todd Carstensen

  29. Slide 29: Corporate Inquiries

    Corporate Inquiries 604.632.4677 info@libertygold.ca TSXLGD | OTCQXLGDTF 610 815 West Hastings Street Vancouver, BC V6C 1B4 libertygold.ca

Liberty Gold — Investor Presentation (February 2026) on 6ix