Alpex Solar Ltd. · NSE:ALPEXSOLAR
Alpex Solar — Investor Presentation (May 2025)
25 slides from Alpex Solar's investor presentation, May 23, 2025
Slide 1: SAKSHI TOMAR
SAKSHI Digitally signed by SAKSHI TOMAR TOMAR Date: 2025.05.23 12:51:31 +05'30'
Slide 2: Alpex Solar Limited Investor Presentation May 2025
ALPEX SOLAR LIMITED THE NEXT LEVEL INVESTOR PRESENTATION MAY 2025
Slide 3: Disclaimer
This presentation has been prepared by Alpex Solar Limited (“ALPEXSOLAR” or the “Company”) solely for information purposes. It does not constitute an offer, recommendation or invitation to purchase or subscribe to any securities. It shall not form the basis or be relied on in connection with any con
Slide 4: An Emerging Solar Power House
AN EMERGING SOLAR POWER HOUSE Established in 2008, Alpex Solar Limited is among North India’s largest PV module manufacturers 18+ 3 375+ Founders with 80+ years of People including reputed industry Years in solar PV manufacturing cumulative experience professionals 1.2 GW 21,000+ 98% Manufacturing c
Slide 5: Mega Expansion Plans
MEGA EXPANSION PLANS 2.4 GW* 1.6 GW* 12,000 T* 150 MW 100 MW Target solar module Target solar cell Aluminium Frame Engineering, Independent power manufacturing manufacturing Procurement & production Construction The ambitious expansion is under execution and will be completed in the next two financi
Slide 6: Our Performance Reflects Our Discipline (FY24 vs FY25)
OUR PERFORMANCE REFLECTS OUR DISCIPLINE (FY24 vs FY25) ON A CONSOLIDATED BASIS 4
Slide 7: Our Performance Reflects Our Discipline (Q4FY24 vs Q4FY25)
OUR PERFORMANCE REFLECTS OUR DISCIPLINE (Q4FY24 vs Q4FY25) ON A CONSOLIDATED BASIS 5
Slide 8: Our Performance Reflects Our Discipline (Q3FY25 vs Q4FY25)
OUR PERFORMANCE REFLECTS OUR DISCIPLINE (Q3FY25 vs Q4FY25) ON A CONSOLIDATED BASIS 6
Slide 9: Management Speaks
MANAGEMENT SPEAKS ASHWANI SEHGAL President & Managing Director “Year 2024-25 was a pivotal year for the company. We set our sights on an audacious vision that comprises building scale in our existing product verticals and venturing into solar cell manufacturing, thereby marking a significant shift i
Slide 10: Key Highlights (Q4FY25)
LAND ALLOTMENT FOR MANUFACTURING EXPANSION KEY HIGHLIGHTS (Q4FY25) Allotted ~20 acres in MP at concessional lease for a new renewable energy equipment facility—boosting capacity and supporting sector growth. BRAND AMBASSADOR: Alpex signed Rahul Dravid, a Global Cricketing Legend and former Indian Ca
Slide 11: Our New Expansion Sites
OUR NEW EXPANSION SITES alpex POWER FOREVER
Slide 12: Alpex Power Forever
alpex POWER FOREVER
Slide 13: A Journey of Over Three Decades
A JOURNEY OF OVER THREE DECADES 1993 2007 2008 2010-11 2012 Incorporated by first Setting up of an automatic line, in Commenced Team strength up Opening of branches in Patna, Jaipur and UP. generation techprenuer’s - Himachal Pradesh for manufacturing to 150. Module manufacturing capacity up to 75 M
Slide 14: Promoter Group
HANDS-ON TECHNOCRAT PROMOTERS BACKED BY PROFESSIONALS PROMOTER GROUP ASHWANI SEHGAL MONICA SEHGAL VIPIN SEHGAL ADITYA SEHGAL President & Managing Director Whole Time Director Executive Director CEO A first generation entrepreneur with more than She has ~30 years of experience. She holds a He has mor
Slide 15: We Offer World-Class Solar Energy Solutions
WE OFFER WORLD-CLASS SOLAR ENERGY SOLUTIONS MANUFACTURING EPC SERVICES OF OF SOLAR PV AC/DC SOLAR MODULES PUMPS 15.2% OF TOTAL OF TOTAL 83.4% REVENUES IN FY25 REVENUES IN FY25 Mono Perc Solar Panel Half-Cut Solar Panels Bi-facial Solar Panels Engineering, Procurement, and Construction (EPC) of AC/DC
Slide 16: Pan-India Player with Demonstrated Manufacturing Prowess
PAN-INDIA PLAYER WITH DEMONSTRATED MANUFACTURING PROWESS MANUFACTURING FACILITIES Unit I: Surajpur Industrial Area, Greater Noida – NCR. Unit II: A-2/2 Industrial Area, Kosi Kotwan Ext- II, Mathura, UP. (25,873.27 Sq. Mtr.) Sikandrabad, Uttar Pradesh Kosi, Uttar Pradesh Unit III: Adjacent to Unit II
Slide 17: Catering to Marquee Clientele as a Preferred Partner
CATERING TO MARQUEE CLIENTELE AS A PREFERRED PARTNER 15
Slide 18: Favourable Regulations Across Verticals
FAVOURABLE REGULATIONS ACROSS VERTICALS Total solar module manufactuing Solar Cells are semiconductor devices that capacity in India is projected to reach use sunlight to produce electricity and its 500 GW by FY30. manufacturing commands high entry barriers. Total solar cell capacity in India is pro
Slide 19: Ongoing Expansion: Solar Modules & Aluminium Frames
ONGOING EXPANSION: SOLAR MODULES & ALUMINIUM FRAMES MODULE MANUFACTURING EXPANSION IN TWO PHASES First phase - at the Existing Plant - Greater Noida. Second phase - In FY2025-26, Alpex’s total high-power solar module capacity will reach 2.4 Capacity expanded as per IPO objects to 1.2 GW GW. capacity
Slide 20: Initiating the Next Level - Solar Cell
INITIATING THE NEXT LEVEL - SOLAR CELL 1.6 GW PV CELL CAPACITY - TO BE IMPLEMENTED IN THREE PHASES Greenfield capacity at Phase I – 500 MW Phase II – 1,000 Phase III – 1.6 GW Kosi Kotwan by the end of current financial year MW by July 2026 by December 2026 Facility to manufacture cells utilizing Mon
Slide 21: Expansion: EPC & IPP
EXPANSION: EPC & IPP EPC - THREE PHASED IMPLEMENTATION TO ACHIEVE 150 MW CAPACITY Phase I – 15 MW Phase II – 95 MW Phase III – 150 MW by FY25 by FY26 by FY27 150 MW Engineering, Procurement & Construction IPP - TWO PHASED IMPLEMENTATION TO ACHIEVE 100 MW CAPACITY Phase I – 60 MW Phase II – 100 MW by
Slide 22: Subsidiaries - Value Creators for the Future
SUBSIDIARIES - VALUE CREATORS FOR THE FUTURE ALPEX SOLAR LIMITED ALPEX GREEN ENERGIES PRIVATE LIMITED ALPEX GH2 PRIVATE LIMITED EPC IPP R&D IS CURRENTLY UNDER PROGRESS FOR HYDROGEN STORAGE DEVICE CHANDRA ENERGY PRIVATE LIMITED - SUBSIDIARY OF AGEPL 20
Slide 23: Solar Cell, Aluminium Frame, Solar Modules, EPC, IPP, GH2
SOLAR CELL ALUMINIUM FRAME SOLAR MODULES EPC IPP GH2 21
Slide 24: The Company Went Public with Listing on NSE Emerge
THE COMPANY WENT PUBLIC WITH LISTING ON NSE EMERGE IPO DATES: ISSUE PRICE: ISSUE SIZE: LISTING DATE: 08-12-FEB-24 RS. 115.00/- RS. 74.52 CR. 15-FEB-24 LISTING PRICE: MARKET CAP: NO OF SHAREHOLDERS: 52-WK H/L (RS.): RS. 345.45/- RS. 2197 CR. 5,445 1,131.7/ 495 SHAREHOLDING PATTERN (31.03.25) PROMOTER
Slide 25: Thank You
THANK YOU. ALPEX SOLAR LIMITED REGISTERED OFFICE CORPORATE OFFICE MANUFACTURING UNITS B-79, Shivalik Enclave, Surajpur Industrial Area, Kasna, Greater Noida, Unit-I: Greater Noida, UP (NCR) Near Malviya Nagar, Uttar Pradesh, 201306, India. Unit-II: Kosi Kotwan, Mathura, UP (NCR) New Delhi - 110017,