  1. Slide 1: Natural Gas Pipelines

    Natural Gas Pipelines Tom Martin President Natural Gas Pipeline Group

  2. Slide 2: Overview

    Overview Market Environment  Growing natural gas demand for power generation  Shale activity providing excellent growth opportunities  LNG export market will require natural gas infrastructure development Value Proposition  Vast asset base with secure cash flows supported by long-term contracts

  3. Slide 3: Natural Gas Segment

    Natural Gas Segment (a,b) (KMP) __________________________ (a) Assets scheduled for 2013 dropdown are indicated at the respective acquiring MLP (i.e., EPNG & EP Midstream at KMP, and GLNG at EPB). (b) TGP offshore system to be sold in 2013. 3

  4. Slide 4: Financial Overview

    Financial Overview 2013 KM Gas Pipeline Group EBDDA (KM Share $million) Budget KMI KMP EPB West Region Total 1,014.6 123.6 365.6 525.4 Central Region Total 207.3 9.2 198.1 - East Region Total 1,746.3 246.4 804.4 695.4 Midstream Assets Total 843.9 6.7 837.2 - Total 3,812.1 385.9 2,205.4 1,220.8 2013

  5. Slide 5: Contracted Capacity and Term by Region

    Contracted Capacity and Term by Region Contracted Average Term Region Capacity Remaining East Storage 119 Bcf 2 yr, 10 mo Transport 16.3 Bcf/d 8 yr, 2 mo LNG 18 Bcf 19 yr, 5 mo Interstate West Storage 39.0 Bcf 7 yr, 1 mo Transport Contracts Transport 16.8 Bcf/d 5 yr, 2 mo Avg. = 6 yr, 8 mo Central S

  6. Slide 6: Gas Pipeline Group Major Projects

    Gas Pipeline Group Major Projects Board Customer Capital, KM Share ($MM) Region Asset Approval Execution KMP(a) EPB(a) Total Completed Completed 629 629 TGP Completed Pending 303 303 Completed Completed 121 121 SNG/EEC East Completed Pending 146 146 Completed Completed 498 498 ELC/SLNG/GLNG Pending

  7. Slide 7: Deliveries to Directly-connected Gas-fired Power Plants on KM Pipelines

    Deliveries to Directly-connected Gas-fired Power Plants on KM Pipelines + New Southern Co. gas fired plant on SNG significantly influenced YOY increase + Robust supply and reduced 1Q ‘12 R&C gas heating demand due to a warmer than normal winter contributed to very low gas prices that allowed power g

  8. Slide 8: Region Asset Reviews

    KINDER/MORGAN Region Asset Reviews

  9. Slide 9: East Region Assets

    East Region Assets (a,b) Growth Drivers  Asset footprint serves growing Southeast markets and infrastructure-constrained Northeast markets from both traditional and developing supply regions.  TGP uniquely positioned in growing Marcellus and Utica shale plays to provide region- wide market access

  10. Slide 10: Current East Region Projects

    Current East Region Projects Capital, Board Customer In-service Asset MLP(a) Project KM Share Capacity Project Status Approval Execution Date ($MM) Northeast Upgrade 449.7 636 MDth/d 11/13 FERC Order received Marcellus Pooling Point (MPP) 85.6 240 MDth/d 11/13 FERC Order received Completed Completed

  11. Slide 11: Current TGP Projects

    Current TGP Projects (a) NE Upgrade Connecticut Project Expansion Marcellus Pooling Project Rose Lake Expansion Uniondale Utica Backhaul __________________________ (a) Not shown here: the Cameron LNG project in Louisiana. 11

  12. Slide 12: TGP - Northeast Upgrade Project

    TGP - Northeast Upgrade Project  Capacity: 636,000 Dth/d  Rate: Negotiated  Capital: $449.7 MM  Current Status: Fully subscribed; FERC Order received; preliminary work underway  Estimated In-Service: November 1, 2013  Major Milestones:  Project Scope: — April/June 2013: Commence compression &

  13. Slide 13: TGP - Marcellus Pooling Point (MPP) Project

    TGP - Marcellus Pooling Point (MPP) Project  Capacity: 240,000 Dth/d  Rate: Negotiated  Capital: $85.6 MM  Current Status: Fully subscribed; Notice-to- Proceed received for all project facilities  Estimated In-Service: November 1, 2013  Major Milestones:  Project Scope: — January 2013: Early

  14. Slide 14: TGP - Rose Lake Project

    TGP - Rose Lake Project  Commercial Benefit: Expand TGP’s  Capacity: 230,000 Dth/d capacity to transport Marcellus Shale  Capital: $83.0 MM production to Canada and New England  Estimated In-Service: November 1, 2014  Rate: Negotiated  Project Scope:  Current Status: Fully subscribed; FERC —

  15. Slide 15: TGP - Uniondale Project

    TGP - Uniondale Project Uniondale Station 219 Pool  Capacity: 34,000 Dth/d  Rate: Negotiated  Capital: $9.0 MM  Current Status: Fully subscribed; PA executed  Estimated In-Service: November 1, 2014  Major Milestones:  Project Scope: Inlet air cooling at Station 321 — July 2013: File FERC Prio

  16. Slide 16: TGP - Utica Backhaul Transportation

    TGP - Utica Backhaul Transportation  Capacity: 352,125 Dth/d  Capital: $121.2 MM  Estimated In-Service: November 1, 2015  Project Scope: Pipe modifications at 3 compressor stations  Commercial Benefit: Backhaul capacity from Utica Shale to GOM markets  Rate: Negotiated  Current Status: Shippe

  17. Slide 17: TGP - Connecticut Expansion Project

    TGP - Connecticut Expansion Project  Capacity: 72,100 Dth/d  Rate: Negotiated  Capital: $81.2 MM  Current Status: Shipper negotiations underway  Estimated In-Service: November 1, 2016  Major Milestones: (Potential to accelerate to 2015) — 1st Quarter 2013: Execute PAs  Project Scope: — 13.3 m

  18. Slide 18: TGP - Cameron LNG

    TGP - Cameron LNG Zone 1  Capacity: 550,000 - 650,000 Dth/d — 250,000 Dth/d from Texas — 100,000 Dth/d from Marcellus/Utica Haynesville — 200,000 - 300,000 Dth/d from Perryville  Capital: $100.5 MM  Estimated In-Service: July 2017 (Train 1) Zone 0  Project Scope: — Station re-piping — Re-routing

  19. Slide 19: EEC - Elba Express Phase B Compression

    EEC - Elba Express Phase B Compression  Capacity: 225,000 Dth/d Hartwell CS  Capital: $22.8 MM Elba Express  Estimated In-Service: April 1, 2013 (8 months ahead of original target date) Elba  Project Scope: 10,310 HP of Island compression in Hart county, GA, near Transco interconnect Cypress SNG

  20. Slide 20: SNG - Muldon Storage Base Gas Conversion

    SNG - Muldon Storage Base Gas Conversion  Capacity: 5 Bcf  Capital: $17.4 MM  Estimated In-Service: July 2013  Project Scope: — Increase Muldon’s working gas capacity from 31 Bcf to 36 Bcf Muldon Storage — Drill/modify wells — Construct surface facilities  Commercial Benefit: Additional storage

  21. Slide 21: SNG - Rose Hill Project

    SNG - Rose Hill Project  Capacity: 285 MDth/d  Capital: $33.5 MM  Estimated In-Service: November 1, 2013  Project Scope: Modify facilities on SNG and TGP to effectuate a receipt point shift from Destin/Petal to Rose Hill and points upstream of Rose Hill — Relocate 10,000 HP turbine from LaCombe

  22. Slide 22: SNG/EEC - Sonat/Elba Express Expansion

    SNG/EEC - Sonat/Elba Express Expansion  Capacity: 120 MDth/d  Capital: $146.0 MM  Estimated In-Service: 2016 or later  Project Scope — Compression on SNG and EEC — Additional pipeline and other facilities  Commercial Benefit: Additional access to Marcellus/Utica shale gas for existing and new S

  23. Slide 23: SLNG - Elba Boil Off Gas Compression

    SLNG - Elba Boil Off Gas Compression  Capacity: 21 MMcf/d  Capital: $10.2 MM  Estimated In-Service: February 2013  Project Scope: Install 12 MMcf/d (2,500 HP) of electric-drive compression, increasing BOG compression from 9 MMcf/d to 21 MMcf/d  Commercial Benefit: — Manage daily boil-off gas —

  24. Slide 24: Liquefaction at Elba Island (Phase 1)

    Liquefaction at Elba Island (Phase 1) Elba Liquefaction Company (ELC) / SLNG  Capacity: 210 MMcf/d  Capital (KM Share): ELC $408 MM SLNG 80 MM EEC 41 MM Total $529 MM  Estimated In-Service: 2016  Project Scope: — ELC: Facilities for liquefaction — SLNG: Ship loading facilities; boil-off gas comp

  25. Slide 25: GLNG

    GLNG Liquefaction at Gulf LNG  Capacity: 300 MMcf/d  Capital: $500 MM (KM portion)  Estimated In-Service: 2018  Project Scope: Developing facilities to export natural gas through liquefaction process — Addition of liquefaction facility outside boundary of existing seawall  Commercial Benefit: E

  26. Slide 26: East Region Additional Potential Growth Projects

    East Region Additional Potential Growth Projects  Marcellus and Utica Shale Plays — Production increases in these two areas will provide opportunities for expansion of TGP facilities and/or greenfield pipe • Canadian Project  Northeast Gas/Electric Initiatives — New Infrastructure is needed in the

  27. Slide 27: West Region Assets

    West Region Assets (a) Growth Drivers  Large asset footprint provides numerous opportunities for expansion capital investment (Ruby, CIG, EPNG, Transcolorado, WIC, Cheyenne Plains)  West Region pipelines reach back to all Rockies Basins. Growing liquids and oil production is creating expansion opp

  28. Slide 28: Current West Region Projects

    Current West Region Projects Capital, Board Customer In-service Asset MLP(a) Project KM Share Capacity Project Status Approval Execution Date ($MM) Willcox Lateral Expansion 23.1 185 MDth/d 4/13 Under construction Received Presidential Samalayuca Lateral Expansion 11.0 97 MDth/d 7/13 permit, pending

  29. Slide 29: EPNG - Willcox Lateral Expansion

    EPNG - Willcox Lateral Expansion  Capacity: 185 MDth/d  Capital: $23.1 MM  Partial in-service: January 1, 2013  Expected full in-service date: April, 2013  Project Scope: — New facilities at Willcox Compressor Station — Upgraded meter stations  Commercial Benefit: Low cost gas supply for new g

  30. Slide 30: EPNG - Samalayuca Lateral Expansion

    EPNG - Samalayuca Lateral Expansion New Interconnection  Capacity: 97 MDth/d  Capital: $11.0 MM Hueco C.S.  In-Service: July 30, 2013 Clint Samalayuca  Project Scope Lateral — 1,400 ft 36” HDD of Rio Grande River (Line 1136) U. S. — New meter station MEXICO Existing GdC  Commercial Benefit: P/L

  31. Slide 31: EPNG - Willcox II Lateral Expansion

    EPNG - Willcox II Lateral Expansion Willcox C.S.  Capacity: 90 MDth/d  Capital Cost: $14.6 MM 61.4 mi., 20”  In-Service Date: January 1, 2014 2163 Willcox Lateral  Project Scope: — Loop the East leg of the Willcox Lateral — 11.2 miles of 16” pipe  Commercial Benefit: U. S. MEXIC O AP I & II — I

  32. Slide 32: EPNG - Sierrita Pipeline

    EPNG - Sierrita Pipeline (a)  Capacity: Arizona — 204 MDth/d initial free flow (Phase 1) — 812 MDth/d final compression Tucson Tohono  Capital (KM): $71.5 MM O’odham Indian Res.  In-Service: Phase I: October 1, 2014 Buenos Aires  Project Scope: Nat’l Wildlife Refuge — Sierrita Pipeline Co. – JV,

  33. Slide 33: CIG - High Plains Expansion

    CIG - High Plains Expansion  Capacity: 600 MDth/d  Capital: $12.1MM  In-Service: November 2013  Project Scope: — 8 miles of 24” pipe, regulation, and metering at Cheyenne into WIC — Lancaster MS (Anadarko) and LaSalle MS (DCP)  Commercial Benefit: — Joint venture expansion with Xcel to move gro

  34. Slide 34: West Region Additional Potential Growth Projects

    West Region Additional Potential Growth Projects  Dramatic growth in unconventional oil and liquids production — Growing Permian production creates oil conversion opportunities on EPNG (Freedom Pipeline) — Dry to wet service conversions • Niobrara Shale (Powder River Basin and DJ Basin) • Tight gas

  35. Slide 35: West Region Growth Opportunity

    West Region Growth Opportunity KM Freedom Pipeline (Proposed)  Capacity: Up to 400,000 Bbl/d Emidio, CA — Viable at 250,000 Bb/d of firm commitments  Capital: $2.0 B (277,000 Bbl/d), minimal additional capital to achieve 400,000 Bbl/d  Expected In-Service Date: — Q4, 2016  Project Scope: — Conve

  36. Slide 36: Central Region Assets

    Central Region Assets (a) Growth Drivers  Large and strategic asset footprint near major shale plays and supply basins provides opportunities to attach new supply  12 Bcf/d of potential demand from 7 announced LNG liquefaction projects along the Gulf Coast near NGPL and KMLP  Well positioned to s

  37. Slide 37: Central Region Additional Potential Growth Projects

    Central Region Additional Potential Growth Projects  LNG Liquefaction Opportunities — LNG liquefaction projects moving forward in South Texas/Louisiana provide potential expansion investment opportunities on both NGPL and KMLP  Industrial Market Growth Opportunities — Several fertilizer plant oppo

  38. Slide 38: Midstream Assets

    Midstream Assets (a) Growth Drivers  Large asset footprint provides continued expansion capital investment (Texas Intrastate)  Competitive expandability and connectivity for increased deliveries into Mexico for its growing reliance on natural gas (Texas Intrastate)  Significant storage positions

  39. Slide 39: Current Midstream Projects and Opportunities

    Current Midstream Projects and Opportunities Capital, (a) Board Customer In-service Asset MLP Project KM Share Capacity Project Status Approval Execution Date ($MM) Increase in Completed Completed West Clear Lake Expansion 29.3 4/13 Construction in progress inj/wd capability Texas KMP Intrastate Pro

  40. Slide 40: West Clear Lake Storage Expansion

    West Clear Lake Storage Expansion  Capacity: — 85.0 Bcf of Working gas capacity within the Houston Metro area  Capital: $29.3 MM  In-Service: April 1, 2013  Project Scope — Deliverability Enhancement Project — Increase injection and withdrawal capabilities — Install 8,000 hp of new compression —

  41. Slide 41: Projects to Serve Gas Fired Electric Generation

    Projects to Serve Gas Fired Electric Generation  Capacity: 350 MDth/d  Capital: $181 MM  In-Service: 2014 through 2015  Project Scope: — New pipe, compression and meters — Gas Cooling  Commercial Benefit: Serve growing gas fired electric generation markets  Rate: Negotiated  Current Status: P

  42. Slide 42: Midstream Additional Potential Growth Projects

    Midstream Additional Potential Growth Projects  Exports — Electric generators in Mexico are looking towards natural gas to fuel new plants to meet growth and replace other fuels such as oil — Proposed LNG liquefaction projects in South Texas  Processing and Gathering — Continued growth in shale pl

  43. Slide 43: Midstream Growth Opportunity

    Midstream Growth Opportunity Kinder Morgan Utica Project KM Midstream Facilities: Mariner West  300 MMcf/d processing plant — July 2014 in-service  48 Mbpd Fractionator — 100,000 bbls NGL storage — Onsite truck/rail loading — Site expandable to 1.2 Bcf/d and 192 Mbpd fractionation capacity KM TGP

  44. Slide 44: Gas Pipeline Group Growth Outlook

    Gas Pipeline Group Growth Outlook Projects Currently Under Development Capital, KM Share ($MM) Region KMP EPB Total East 932 1,265 2,197 West 124 12 136 Midstream 400 400 Total 1,457 1,277 2,734 Additional Potential Growth Projects Capital, KM Share ($MM) Region KMP EPB KMI Total East 2,800 7,200 10