Metals Creek Resources Corp. · TSXV:MEK
Metals Creek Resources — Investor Presentation (March 2014)
40 slides from Metals Creek Resources's investor presentation, March 2014
Slide 1: Metals Creek Resources
METALS CREEK RESOURCES MEK TSX-V The Best Place to Look For Gold is in the Shadow of Headframes Experienced Team, Endless Opportunities
Slide 2: Forward-Looking Statements
Forward-Looking Statements – Certain statements included in this presentation are forward-looking statements which are made pursuant to the “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995. They include estimates and statements that describe the Company’
Slide 3: Metals Creek's Projects
YY GOLD PROJECT & BASE METAL PROJECT ff
Slide 4: Ogden Gold Project, Timmins Gold Camp, Ontario
Ogden Gold Project, Timmins Gold Camp, Ontario
Slide 5: Ogden Gold Project – 50/50 JV with Goldcorp Inc.
Ogden Gold Project – 50/50 JV with Goldcorp Inc. Metals Creeks Flagship Property. Drilling in the shadow of the Head Frames in Canada’s most prolific Gold Camp. Metals Creek have recently formed a 50/50 joint venture with Goldcorp Over 8km of strike length of the Porcupine-Destor Break, the key cond
Slide 6: Timmins Gold Camp Mineralized Trend
Timmins Gold Camp Mineralized Trend
Slide 7: Thomas Ogden Zone
Thomas Ogden Zone Historic results from the Thomas Ogden Zone 1.51 g/t Au over 21.4 m 1.01 g/t Au over 37.2 m within a mineralized porphyry. MEK results from recent drilling 210.19 g/t Au over 12.53 m, including 2732.6 g/t over 0.93 m 49.96 g/t Au over 9m April 2013 1.94g/t over 94m February 2012 2.
Slide 8: Highlights 2012/13 Drilling
Highlights 2012/13 Drilling Drill Hole Number Meters From Meters to Total Meters Gold g/t (Grammes per tonne) TOG 11-11 78.00 172.00 94.00 1.94 TOG 12-03 90.50 118.00 27.50 1.14 and 148.00 171.30 23.30 5.73 TOG 12-05 141.30 185.00 43.70 2.34 including 170.00 185.00 15.00 5.04 TOG 12-06 146.60 162.87
Slide 9: Thomas Ogden Longsection
Thomas Ogden Longsection Thomas Ogden Showing (grabs up to 15.77g/t Au) 06-13-27 49.96g/t Au over 9.00m {uncut) incl. 434.77g/t Au over 1.00m TOG-12-08 3.97 git Au over 17.00m TO0G.-13.36 incl, 18.41 git Au over 3.00m 1.91 git gold over 17.05m. TOG-12-03 TOG-13-38 9 git gold over 21.85m 2.78 git Au
Slide 10: Schematic Cross Section
Fragmental 150m — 100m — — 150m ~~ 100m: Ultramafics “(N PROPERTY, TIMMINS Schematic Cross Section TZ_1525W — om
Slide 11: Schematic Cross Section
250m) 200m 50m) 0m Ultramafics Schematic Cross Section — 50m Sediments restos eseuauredees TZ_1375W
Slide 12: TOG-12-07 Cross Section
TOG-12-07 250m ediments Fragmentals ‘\ . CG Minerali 200m \ Ultramafics Uleramafies 150m S ODGEN ZONE TION TZ_1475W oking Southwest Teena _ Metals Creek _ i Porphyry
Slide 13: Thomas Ogden Porphyry 5.26 g/t Au over 23.4m
Thomas Ogden Porphyry 5.26 g/t Au over 23.4m
Slide 14: Visible Gold in Core
LK, _ Visible Gold in Core
Slide 15: Visible Gold in Core
Visible Gold in Core
Slide 16: Visible Gold in Core
Visible Gold in Core
Slide 17: Mineralized Porphyries
Ogden Gold Property Mineralized Porphyries
Slide 18: Naybob South Zone
Naybob South Zone Historic Results 6.33 g/t Au over 5.37m 11.85 g/t Au over 1.83m MEK recent drill results 9.24 g/t Au over 6.61m 6.22 g/t Au over 6.63m Press released January 10. 2012 all with visible gold at less than 100 meters vertical depth. close to existing infrastructure.
Slide 19: Naybob South Longsection
Naybob South Longsection w 300 mN — 100 mn —OmN 100 mN Naybob South Gold Mineralization Grade x Thickness
Slide 20: Schematic Longsection
BUFFALO-ANKERITE TIMMINS WEST PAYMASTER MINE DEPOSIT THUNDER CREEK DISCOVERY THOMAS OGDEN ZONE THO S OGDEN ZONE ‘ * 4 4 ’ aE SK LF rg FX ‘of = Ne 7 ee wa 2 r TF Ogden Property is a S (Western Extent) = Ogden Property (Eastern Extent)
Slide 21: Project Location! Location! Location!
Key Points about the Ogden Gold Project Location ! Location ! Location ! - Located in the Prolific Timmins Gold Camp - 50/50 Joint Venture with Goldcorp/ MEK is the operator and sets the budget - Sandwiched between the Dome Mill approx 9 km from the claim boundary to the east and Lakeshore Gold’s de
Slide 22: Squid East Gold Project
Squid East Gold project METALS CREEK RESOURCES YUKON GOLD PROJECT ae A, Prudhoe Bay . N.W.T. (CAN) Fergani’ Fass ‘si: Haim 2s : ( ae My eat“ “ss, Datgone’g SxS “ =o Deuter sa" Spy Wiis Bald Osta i ee ‘ GiiaiRea ~~ geo. \ Sstga ite ee a "SS = Anchorage EHTS i i a < a cen So a SO n. Pie Pee I Shuma’?
Slide 23: Metals Creek's Squid East Property Location Map
4 Ke N “a METALS CREEK'S SQUID EAST p a PROPERTY LOCATION MAP ‘ , % ' ‘ THE pp a ao S Rep m ‘ 4 im e my ae ‘ Be SIXTY MILE A 3 a SQUID EAST ~ : PROPERTY a|2 . 5 * ROSEBUTE MATSON PLACER QV PROJECT CAMPS GOLDEN SADDLE ° ss racmecw , Metals Creek Reseagtr@ees 25 50 kilometers 5
Slide 24: Newly Discovered Exploits Zone
Newly Discovered Exploits Zone • Recent trenching 1.96 g/t Gold and 160.6 g/t Silver over the entire width of the 22 meter Trench • High grade section of 6.39 g/t Gold and 513.5 g/t silver over 4 meters • Drilling recently completed, 1.54 g/t Gold and 114 g/t silver over 21m • Oxidized Mineralizatio
Slide 25: Exploits Zone
Exploits Zone • Strength and continuity of anomaly between soil sample sites • Anomaly within a discrete mag-low parallel to regional ultramafic- break • Strong pathfinder association (Hg, Sb, Mo, Ag, Ba etc) • Upstream from Matson Creek placer operations • Airstrip, camp and heavy equipment accessi
Slide 26: Gold in Soil
SE_Assay_Compilation_2012 by Au @- @ 5 w O % t @ 5 to @ — 0.25t0 all others to 1,090 (21) 50 (15) 15 (9) 10 (38) 5 (457) (136) _ 2011-1/2)SQUID EAST SOILS ON’ AVDIMAGNETICS\(2011) | (SOIESIREOTTEDIN WHIMEIHAVE ASSAYS PENDING) D@ } eccose ic Mess « a j \ CCOOCO) Pi
Slide 27: Soil Terrain
Soil Terrain vee vf Sguid Anomaly £4. minimum 450m long with sous up to 1086.5 ppb Au 78.5 ppm Ag 50.9 ppm As 209.8 ppm Sb 2370 ppm Ba 36.32 ppm Hyg
Slide 28: Squid East Gold Project
cain teat “EXPLOITS TRENCH" SE13-003 i ’ y 7” { tach Hele SE13-001 1.70g/t Au + 81.78g/t Ag + 0.31% Pb / 12.00m ae F 1.55g/t Au + 114.12g/t Ag + 0.32% Pb / 21.00m including 2.43g/t Au + 185.25g/t Ag + 0.47% Pb / 12.00m 0.37g/t Au + 39.89g/t Ag + 0.66% Pb / 6.50m ft ro
Slide 29: Exploits Zone Drill Section
-Exploits Zone- Trenching results of 1.96g Au and 160.6g/t Ag over 22.0m incl. w 6.39gA Au and 513.5gA Ag over 4.0m E $E13-004 Sericite Schist SE13-001 700m $E13-002 EXPLOITS ZONE - SQUID EAST DRILL SECTION (FACING NORTH) stacy Metals Greek Reseuur¢dges
Slide 30: reSttanty Metals Creek
7,047,750 mN_ reSttanty Metals Creek 520,250 mE ‘520,000 mE 519,750 mE 519,500 mE 519,250 mE 519,000 mE NU! OSZ BPO L,
Slide 31: Squid East Gold Project Trench Results
Squid East Gold Project Trench Results (2 Meter samples) Sample Au Mo Cu Pb Zn Ag As Sb Ba Hg Number PPB PPM PPM PPM PPM PPM PPM PPM PPM PPM 1308699 563.6 18 26 993 23 21.7 4.9 9.5 134 11.58 1308700 4499.5 33 53 8443 42 446 28.5 232.3 182 >50.00 1308701 7896.0 26 49 8774 20 581 23.4 225 308 >50.00 1
Slide 32: Matson Creek Placer Camp
Squid East Gold Project Matson Creek Placer Camp
Slide 33: Road access from Top Of The World Highway
Squid East Gold Project Road access from Top Of The World Highway
Slide 34: Squid East Gold Project
/\, Squid East Gold Project
Slide 35: Iron Horse
Iron Horse MEK Recently sold interest in Iron Horse to Sokoman Iron Corp. MEK hold 1,900,000 Sokoman Iron Corp. which represents approximately 15% issued and outstanding. SIC to pay MEK $1,000,000 upon bankable feasibility . MEK to retain 1.9 % Iron Horse Royalty. Recently sold 1% Royalty to Gold Ro
Slide 36: Cash and Share Positions
Metals Creek Resources Cash and Share Positions • approx $1,800,000 in cash • 1,900,000 Sokoman Iron Corp. or approximately 15% issued and outstanding • 1,000,000 Gold Royalties • 750,000 Nobel Mining • 250,000 Spruce Ridge Resources • 200,000 GTA Resources • 300,000 Xmet Inc.
Slide 37: MEK Plans for 2013
MEK Plans for 2013 • Partnered with a World Class Gold Miner in Goldcorp/MEK is operator • Managed by experienced team with a proven track record • Excellent exposure to Gold with projects in Timmins, Yukon, and Newfoundland • Exciting new Gold/Silver discovery in the Yukon • Focusing on productive
Slide 38: Investor Information
Investor Information As of September, 2013 Market cap………………………………….………..Cdn $4 million Trading symbols………………………………..……TSX:V – MEK Issued and Outstanding…………………………….98.5 million 52 week high…..………………………......………..Cdn $0.08 52 week low……………………………………...….Cdn $0.02 Current Cash Position………………………………Cdn $
Slide 39: Officers & Directors
Officers & Directors Sandy Stares, President and CEO and Director Michael MacIsaac, VP Exploration Wayne Reid VP Corp. Development & Director Mick Stares, Director Nick Tsimidis, CFO & Director Patrick Mohan, Director Malvin Spooner, Director Lorne Woods, Director Darin Wagner, Advisor Richard Nemis
Slide 40: Thank You For Your Attention
METALS CREEK RESOURCES MEK TSX-V The Best Place to Look For Gold is in the Shadow of Headframes Thank You For Your Attention Experienced Team, Endless Opportunities
Metals Creek Resources — Investor Presentation (March 2014) on 6ix