Vizsla Silver Corp. · TSX:VZLA

Vizsla Silver — Investor Presentation (August 2024)

44 slides from Vizsla Silver's investor presentation, August 2024

  1. Slide 1: Panuco – Silver & Gold District

    PANUCO – SILVER & GOLD DISTRICT Developing the Next World Class Silver Asset NYSE:VZLA TSXV:VZLA Corporate Presentation August 2024

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement This presentation contains “forward looking statements” regarding the Company within the meaning of applicable securities legislation, including statements as to future events, results and plans. Forward-looking statements are sometimes but not always identified by such wor

  3. Slide 3: Vizsla's Vision – First Silver 2027

    Vizsla’s Vision – First Silver 2027 Vizsla’s vision is to become the World’s Largest Single Asset Silver Primary Producer through exploration and development of the Panuco district in Mexico The Company cautions that the results of the PEA are preliminary in nature and include inferred mineral resou

  4. Slide 4: Leadership – The Most Important Asset

    Leadership – The Most Important Asset Michael Konnert Craig Parry Simon Cmrlec Jesus Velador Eduardo Luna CEO, Director Chairman COO, Director VP Exploration Director Founder & Managing Partner of Initial Co-founder & advisor of Former COO of Ausenco. 30+ Doctorate in epithermal deposits. Mexican mi

  5. Slide 5: Tier-1 Silver Development with Tremendous Growth Potential

    Tier-1 Silver Development with Tremendous Growth Potential Advancing Development Exploration Upside Responsible Growth Fast Track to Production Growing Land Package Investing Locally Feasibility Study in H2 2025, Tripled land package in 2024, building Seven infrastructure projects(3) & $300k followe

  6. Slide 6: Panuco Silver-Gold Project

    Panuco Silver-Gold Project District Scale & 100% Owned N • Applying modern exploration techniques to a newly consolidated land package that has never been systematically explored • Tripled land package since January 2024, now over 17k ha Location, Location, Location • Situated in an underexplored ar

  7. Slide 7: Unrivalled Infrastructure

    Unrivalled Infrastructure Site Access N • Highway 40 from Mazatlàn to Concordia and into Panuco property (~1hr drive) • Toll highway 40D (Mazatlàn to Durango) International Infrastructure • Deepwater port located in Mazatlàn • Mazatlàn international airport located 56km SW of Panuco Project Power &

  8. Slide 8: Industry Leading Mine Economics

    Industry Leading Mine Economics Significant Cash Flow Allows For Rapid Payback Post-Tax Economics Post-Tax FCF Pre-Tax FCF NPV(5%) $1,137M US$350M IRR 86% US$250M Payback 0.8 years NPV/Capex(1) 5.1x US$150M Sensitivities to Silver & Gold -10% Base Case +10% Spot Prices Upside US$50M Ag 24 26 29 31 4

  9. Slide 9: Low Initial Capital + High Grade

    Low Initial Capital + High Grade Panuco demonstrates outstanding return on capital invested, with NPV 5.1x(1) higher than initial CapEx $1,500M Bubble Size = NPV/CapEx Low Cost, High Yield High Cost, High Yield $1,250M Panuco Cordero (Vizsla) (Discovery) 1.5x 5.1x $1,000M NPV(5%) Silver Sand $750M (

  10. Slide 10: Project 1: PEA Based on Large, High-grade Resource

    Project 1: PEA Based on Large, High-grade Resource Resource Tonnes (Mt) AgEq(1) (g/t) AgEq(1) (Moz) Indicated 9.5 511 156 Inferred 12.2 433 170 Conventional Mining, Conventional Processing Long Hole (85%) 3,300 tpd Initial mill throughput Cut & Fill (15%) ramping up to 4,000tpd Mining method in year

  11. Slide 11: World-Class Silver-Gold Production

    World-Class Silver-Gold Production Panuco to become a top-5 silver producer(1) with bottom quartile AISC 20.2Moz 25Moz $25 Copala & Cristiano Tajitos Napoleon & Luisa Stockpile AISC (US$/Oz AgEq) Avg Annual Production Years 1-2 (AgEq) 15.2Moz 20Moz $20 LOM Avg Annual Production (AgEq) 162.1Moz LOM T

  12. Slide 12: Panuco is a Standout Developer in the Silver Space

    Panuco is a Standout Developer in the Silver Space Annual Production (Moz AgEq) AISC US$/Oz AgEq Bottom Quartile AISC US$18.09 /oz AgEq 22.7Moz 22.6Moz 21.9Moz $31.6 20.2Moz 18.7Moz $25.4 US$9.40 15.2Moz $24.2 -48% /oz AgEq 14.2Moz 13.7Moz $21.4 $20.5 $20.2 $16.5 12.2Moz 10.2Moz $15.8 $15.3 $14.7 $1

  13. Slide 13: Panuco – A Globally Significant Silver Asset

    Panuco – A Globally Significant Silver Asset Currently Online Coming Online 28 yrs Annual production for new silver primary La Pitarrilla assets averages 9.3Moz AgEq per year (Endeavour) 10.1Moz 23 yrs La Colorada (Pan American) 5.7Moz Prognoz 18 yrs (Solidcore) - Mine Life (years) 6.9Moz Juanicipio

  14. Slide 14: Key Areas For Enhancement

    Key Areas For Enhancement Tight Spaced Drilling at Copala & Exploration of Open Resources • Continued exploration and infill drilling for conversion of Inferred Resources to Measured and Indicated categories supports resource growth in pending resource update (Q4 2024) Optimized Metallurgy • Supplem

  15. Slide 15: Ongoing Infill Drilling at Copala

    Ongoing Infill Drilling at Copala 15k metre infill program focused on high-grade zones targeted for the first two years of production Proposed area for Infill drilling Proposed area for Expansion drilling Historic Adit CS-24-356 4.20 m @ 8,817 g/t AgEq CS-24-361 3.50 m @ 2,023 g/t AgEq CS-24-357 10.

  16. Slide 16: Ongoing Metallurgical Optimization

    Ongoing Metallurgical Optimization Testwork History Conventional Processing • To date, three rounds of metallurgical testwork have been • Test work demonstrates high precious metals recoveries (up completed on the main deposits at Panuco to 93% Ag and 94% Au) • Napoleon (2021), Tajitos (2022), Copal

  17. Slide 17: Dual Track Strategic Plan

    Dual Track Strategic Plan Vizsla Silver aims to become the world’s leading silver company by implementing a dual track development approach, advancing Copala & Napoleon mine development while continuing district scale exploration through low-cost means Developing Panuco Project-1 Exploring a Prolifi

  18. Slide 18: District Upside Potential

    District Upside Potential Project-1 PEA Covers a Small Portion of the Panuco District To date, less than 30% of the known vein targets at Panuco have been drill tested(1) Resource Expansion • Copala & La Luisa remain open along strike to the north and down dip to the south • Napoleon (HW4) to the ea

  19. Slide 19: A Quality Portfolio in a Prolific Silver Belt

    A Quality Portfolio in a Prolific Silver Belt La Garra • ~17,000ha past-producing district situated along trend with Panuco and First Majestic’s San Dimas • First time ever in the hands of a public company (with no previous drilling) • Hosts flat-lying structures reminiscent of Panuco’s Copala & sub

  20. Slide 20: The Next Billion Ounce Silver District

    The Next Billion Ounce Silver District Mexico hosts 8 of 14 +billion-ounce Ag districts(1), 5 of which are epithermal veins (Ag + Au) District Location Ounces (B) Fresnillo Mexico 3.3 Cerro Rico Bolivia 2.8 Cerro de Pasco Peru 1.7 Pachuca Mexico 1.5 Guanajuato Mexico 1.4 Broken Hill Australia 1.3 Co

  21. Slide 21: Environmental, Social Responsibility & Governance

    Environmental, Social Responsibility & Governance Annual Sustainability Report Community Relations Promoting Local Growth Social Impact Assessment Inaugural report published in 2023. Update Prioritizing reciprocity Seven infrastructure SIA underway to analyze all social risk underway for 2024 throug

  22. Slide 22: Significant Re-rate Potential: Closing The Valuation Gap

    Significant Re-rate Potential: Closing The Valuation Gap Average producer P/NAV multiple represents a 200% increase over the average developer P/NAV(1) $3,798.M Market Cap (US$M) P/NAV(1) 2.19x $2,608.M 1.59x 1.53x 1.54x Avg Producer P/NAV 1.27x 1.40x $1,978.M 1.23x 1.17x $1,657.M 1.07x $1,508.M $1,

  23. Slide 23: Post PEA Excess Return: Significant Upside Remains

    Post PEA Excess Return: Significant Upside Remains Post PEA Daily Returns in Excess(1) of GDXJ +/- 80 days Discovery Silver 125% 100% Pre-PEA 0% Post-PEA 51% 75% GoGold 50% 51% 25% Silvercrest 0% Mag Silver -25% -50% -80 -75 -70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 3

  24. Slide 24: Key Potential Catalysts Over Next 12 Months

    Key Potential Catalysts Over Next 12 Months Bulk Sample Test Mine Program • Fully permitted 25,000 tonne bulk sample from Copala and Napoleon, commencing development Q4 2024 • Accessing first two years of high-grade production, and confirming metallurgical test work and mining method • Results to fe

  25. Slide 25: Three Reasons to Own Vizsla Silver

    Three Reasons to Own Vizsla Silver (VZLA-NYSE) Fast Track to Production Immense Exploration Upside Significantly Undervalued Advanced Developer Growing Land Package Timing Feasibility Study in H2 2025, Tripled land package in 2024, building Strong leverage to rising metals prices targeting first sil

  26. Slide 26: Appendix

    Appendix SILVER CORP NAPOLEON DISCOVERY HOLE the drill hole that changed everything NP-20-07: 8,078 g/t silver equivalent (1,808.2 g/t silver, 66.8 g/t gold, 2.99% lead and 3.30% zinc) over 6.0 meters

  27. Slide 27: Company Snapshot

    Company Snapshot COMPANY STATISTICS TSX.V as of July 16, 2024 VIZSLA SHAREHOLDERS Shares Outstanding 241.9 M Top Shareholders Warrants (M) 9.0 M Institutions & HNW 15% Franklin Templeton 16% Options (M) 22.6 M Sprott Inc 7% Shares Fully Diluted (M) 273.5 M Retail 50% Eric Sprott 4% Market Capitaliza

  28. Slide 28: Management Team

    Management Team Michael Konnert CEO, Director Simon Cmrlec B.Eng, COO, Director 15+ years industry experience. Founder & Partner of 30+ years industry experience. Former COO of Inventa Capital and Vizsla Silver. Co-founded & sold Ausenco Engineering where he supported mine CobaltOne Energy developme

  29. Slide 29: Board of Directors & Advisors

    Board of Directors & Advisors Craig Parry B.Sc., Chairman Eduardo Luna P.Eng., Director 25+ years industry experience. Holds 6 mining Mexican mining hall of fame member, President of company board seats. Founder of Vizsla Silver, the Mexican Mining Chamber, Former Director at Vizsla Copper, and init

  30. Slide 30: Creating Shareholder Value

    Creating Shareholder Value Financing CAD/Share 30day Return 1yr To Date A $2.0M at $0.15 13% 197% 1653% B $3.6M at $0.40 73% 265% 558% • Proven Access to Capital C $.4M at $0.40 93% 253% 558% • Return on Investment D $2.0M at $0.40 125% 270% 557% • Vizsla Discovery Cost of US$0.32/oz AgEq(1) E $4.6M

  31. Slide 31: Demand for Solar Power is Driving Supply Deficits

    Demand for Solar Power is Driving Supply Deficits Net Silver Supply (Supply – Demand) Since 2020, aggregate silver supply has fallen 0.9% Surplus annually, while demand has grown 6.2% annually 110Moz $40/oz 10Moz $35/oz -90Moz $30/oz Deficit -190Moz $25/oz Silver Demand -290Moz $20/oz 1400 2014 15 1

  32. Slide 32: Vizsla Silver – A World Class Silver Producer

    Vizsla Silver – A World Class Silver Producer 35.9Moz If in production today, based on the PEA, Panuco would be the 10th highest silver producing(1) asset in the world 40Moz 35Moz Top Silver Producers 2023 Annual Production 30Moz Silver Production 25Moz 17.5Moz 16.7Moz 20Moz 14.2Moz 12.5Moz 11.9Moz

  33. Slide 33: Panuco Mineral Resource Estimate - January 2024

    Panuco Mineral Resource Estimate - January 2024 Updated Panuco Project Indicated & Inferred Resource Summary by Vein (150 g/t AgEq cut-off) AVERAGE GRADE CONTAINED METAL TONNES CLASSIFICATION Ag Au Pb Zn AgEq AuEq Ag Au Pb Zn AgEq AuEq (Mt) (g/t) (g/t) (%) (%) (g/t) (g/t) (koz) (koz) (kt) (kt) (koz)

  34. Slide 34: Panuco - A Globally Significant Silver Discovery

    PANUCO - A Globally Significant Silver Discovery Grade M&I g/t AgEq Inferred g/t AgEq Contained M&I Moz Inferred Moz SIL - Las Chipas Producer AG - San Dimas FRES - Cienega MAG* - Juanicipio AYA - Zgounder M&I 511 g/t AgEq M&I 156 Moz AgEq VZLA - Panuco Inferred 170 Moz AgEq Inferred 433 g/t AgEq DV

  35. Slide 35: Surface Infrastructure Layout

    Surface Infrastructure Layout Municipal Boundary of Copala High Voltage Power Stockpile Tailings Storage Facility Napoleon Copala Portal Portal Waste Dump Federal Highway 40D Plant Location Existing Roads Collection Pond Federal Highway 40 35

  36. Slide 36: Conventional Mining

    Conventional Mining Looking South-West From Above Napoleon 100% Long Hole Tajitos Longhole (85%) Cut & Fill (15%) Mining method Cristiano Copala (South) Copala (North) Development Copala (Central) Longhole Cut & Fill Design by Production Method: Copala Portal 36

  37. Slide 37: Copala - Mine Development Timeline

    Copala - Mine Development Timeline Looking South-West From Above Tajitos Cristiano Pre-prod. (2yr) Copala (South) Y2 – Y2 Y3 – Y4 Copala (North) Y5 – Y6 Copala (Central) Y7 – Y8 Y8 – Y9 Y10+ Year Mined: Copala Portal 37

  38. Slide 38: Napoleon - Mine Development Timeline

    Napoleon - Mine Development Timeline Looking South-West La Luisa Cruz Negra / Josephine Pre-prod. (2yr) Napoleon (Main) Y2 – Y2 Y3 – Y4 Napoleon (South) Y5 – Y6 Y7 – Y8 Y8 – Y9 Y10+ Year Mined: Napoleon Portal 38

  39. Slide 39: Copala & Cristiano – Preliminary Mine Design

    Copala & Cristiano – Preliminary Mine Design Looking NorthEast 39

  40. Slide 40: Napoleon South – Preliminary Mine Design

    Napoleon South – Preliminary Mine Design Looking East 40

  41. Slide 41: La Luisa – Preliminary Mine Design

    La Luisa – Preliminary Mine Design Looking SouthWest 41

  42. Slide 42: Information Concerning Estimates of Mineral Resources

    INFORMATION CONCERNING ESTIMATES OF MINERAL RESOURCES The scientific and technical information in this presentation was prepared in accordance with NI 43-101 which differs significantly from the requirements of the U.S. Securities and Exchange Commission (the “SEC”). The terms "measured mineral reso

  43. Slide 43: Disclaimer

    DISCLAIMER General This corporate presentation is intended to provide an overview of the business of Vizsla Silver Corp. (the “Company”, “Vizsla” or “Vizsla Silver”). It has been prepared for informational purposes only and does not purport to be complete. The information in this presentation is not

  44. Slide 44: NYSE:VZLA TSXV:VZLA

    595 Burrard Street Suite 1723, Vancouver, BC Canada V7X 1J1 +1 604 364 2215 info@vizslasilver.ca NYSE:VZLA TSXV:VZLA July 2024

Vizsla Silver — Investor Presentation (August 2024) on 6ix