Peninsula Energy Limited · ASX:PEN

Peninsula Energy — Mining Indaba Conference 2013

30 slides from Peninsula Energy's conference presentation, Feb 6, 2013

  1. Slide 1: Company Presentation cover letter - Mining Indaba

    For personal use only 5 February 2013 Companies Announcement Office Via Electronic Lodgement COMPANY PRESENTATION Please find attached a copy of the presentation made by Peninsula Energy Limited's Executive Chairman, Mr John (Gus) Simpson at the Mining Indaba Conference in Cape Town, South Africa on

  2. Slide 2: 2013 Indaba Presentation - Emerging Producer

    For personal use only 2013 Indaba Presentation EMERGING PRODUCER

  3. Slide 3: Disclaimer & Competent Person

    Disclaimer & Competent Person For personal use only This presentation is provided on the basis that the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Presentation and nothing containe

  4. Slide 4: The World Needs Energy

    The World Needs Energy For personal use only • Expanding economies require more energy • 1.7billion of world population without electricity Source: International Energy Agency 3

  5. Slide 5: Electricity Demand Growing

    Electricity Demand Growing For personal use only Electricity Demand* (TWh**) 35,000 31,722 30,000 25,000 20,000 17,217 Non-OECD OECD 15,000 10,084 10,000 5,000 0 1990 2009 2035 E * Electricity demand is calculated as the total gross electricity generated less own use in the production of electricity

  6. Slide 6: Long Term Demand Increasing

    Long Term Demand Increasing For personal use only TWh 80 net new reactors by 2021 600 65 currently under construction 511 500 Other* 431 China 400 India 300 Russia + E. Europe** 200 Asia Americas 100 Europe 0 2012 2021 *Iran, Pakistan, South Africa, Turkey and UAE **Armenia, Belarus and Ukraine 5

  7. Slide 7: New Uranium Supply Required

    New Uranium Supply Required For personal use only Required New Supply of 440mlbs U3O8 over next 10 year 2,500 Required Supply 2,000 Existing Secondary Mlbs – 10 years Supply 1,500 Existing Primary Production 1,000 Strategic Inventory Building 500 World Consumption 0 World Demand World Supply 6

  8. Slide 8: Company Overview

    Company Overview For personal use only • Emerging uranium producer with established project pipeline • Flagship projects in Wyoming (Lance) and South Africa (Karoo) Lance • JORC Resource of 54mlbs U3O8 • 2.2mlbs U3O8 pa ramping up over 3.5 years • Low Capex - Initial development expenditure US$78m •

  9. Slide 9: Business Plan

    Business Plan For personal use only • PRODUCTION TARGET 10mlbs U3O8 – BEFORE 2022 • From USA, RSA and Australia • Commence ISR production at Lance Projects, Wyoming in C13-C14 building to 2.2mlbs U3O8 pa over 3.5 years (plant capacity 3mlbs pa) • Develop conventional mining and milling operation at

  10. Slide 10: Implied Market Valuation

    Implied Market Valuation For personal use only Production Market cap Pre-Fukushima Market cap Company 2011A Market cap (US$/lb prod) market cap (US$/lb prod) (U3O8 lbs) Cameco 22.4m US$8,400m 375 US$14,324m 639 Paladin 5.7m US$ 962m 169 US$ 3,677m 645 Uranium One 10.7m US$2,590m 242 US$ 5,704m 533 P

  11. Slide 11: Corporate Overview

    Corporate Overview For personal use only Capitalisation Share price history Shares on issue 2,952m Share price 4.1c Market capitalisation US$121m Available Cash US$ 42m Debt US$ 22m Enterprise value US$123m Shareholding Shares % holding Pala Investments 577m 19.85% BlackRock Funds 293m 10.00% Gus Si

  12. Slide 12: Directors and Management

    Directors and Management For personal use only Board of Directors Gus Simpson Strategic leadership, background in resources, corporate finance and management; 25 Executive Chairman years experience Malcolm James Strong corporate finance and resources background; 25 years experience Executive Directo

  13. Slide 13: Uranium Mining in Wyoming

    Uranium Mining in Wyoming For personal use only WYOMING VERY SUPPORTIVE OF URANIUM EXTRACTION 12

  14. Slide 14: Lance – Development Model

    Lance – Development Model For personal use only • Building a 2.2mlbs per year ISR operation • ISR is a low cost non-disruptive method of recovering uranium as yellow cake • Inclusive of – Ion exchange facility – centralised resin stripping, drying and packaging plant at Ross (CPP) – Remote ion excha

  15. Slide 15: Lance – Process Schematic

    Lance – Process Schematic For personal use only

  16. Slide 16: Lance – Financials

    Lance – Financials For personal use only Capex by Prod. Phase US$ Financials – Steady State US$ pa US$/lb Phase 1 : month1-mth18 Gross revenue US$179m US$70.00* Ross Production Unit US$56m Royalties and indirect taxes US$20m US$9.26 (750klbs pa) Operating costs US$28m US$12.83 Phase 2 : mth12-mth30

  17. Slide 17: Project Funding

    Project Funding For personal use only • $21.5m in treasury • $22m Notes from Blackrock Funds • $70m Wyoming IDB application; 7 year term; low interest rate bonds • $80m notes; Blackrock first-right-refusal • $165m net would see Wyoming project funded to profitability HIGH DEGREE OF FUNDING VISABILIT

  18. Slide 18: Lance – Permitting Schedule

    Lance – Permitting Schedule For personal use only • Deep Disposal Wells − DDW feasibility study completed − Licence application deemed complete − Environmental and technical review completed − Licence granted March 2011 • NRC Source Material Licence − Technical reports completed − Environmental repo

  19. Slide 19: Lance – Uranium Sales

    Lance – Uranium Sales For personal use only • First sale contract entered into in February 2011 – USA utility – WAP $75.60 per lb – 7 year contract – first delivery 2013 • Planned sales structure – 40% to a strategic partner taking an investment in Peninsula Energy – 30% to 3-4 utilities on long-ter

  20. Slide 20: Lance – Development Schedule

    Lance – Development Schedule For personal use only 2012 2013 PROJECT EVALUATION ✔ ✔ ✔ ENGINEERING / PROCUREMENT ✔ ✔ PERMITTING Deep Disposal Wells ✔ Permit To Mine ✔ Source Material License (SML) ✔ FUNDING Equity - $10/$14m ✔ ✔ Project Debt - $20/$150m ✔ CONSTRUCTION Pre SML License ✔ Post SML Licen

  21. Slide 21: Lance – Exploration Potential

    Lance – Exploration Potential For personal use only • 13 Historic resources • 22 roll fronts extend for a combined linear strike length of 194 miles (312km) • Exploration potential 158-217mlbs U3O8 LARGE RESOURCE POTENTIAL - 70+ YEARS MINE LIFE 20

  22. Slide 22: Lance – Rapid Resource Growth

    Lance – Rapid Resource Growth For personal use only 60,000,000 2,250 No. PEN Holes Inferred 1,854 4,738 No. NuBeth Holes 4,738 50,000,000 Indicated Measured 1,106 4,738 40,000,000 805 36,513,114 4,738 36,783,402 lbs U3O8 30,000,000 600 4,738 30,178,789 22,454,321 20,000,000 281 4,738 15,955,169 12,6

  23. Slide 23: Karoo Projects

    Karoo Projects For personal use only Located in the Karoo region of RSA, approx. 400km to 600km E-NE of Cape Town 7,800 km2 over Permian sandstones 32,176 hectares of freehold land Freehold land covers majority of historic mineralisation Known uranium and molybdenum mineralised province Ownership: P

  24. Slide 24: Karoo – Geological Setting

    Karoo – Geological Setting For personal use only • Sandstones of the Adelaide Subgroup (Beaufort Group) • Extends from NE of Western Cape, across SE of Northern Cape, and into Free State • Stretches east to Cradock in the Eastern Cape includes smaller satellite area located to the ENE of Bloemfontei

  25. Slide 25: Karoo – Development Model

    Karoo – Development Model For personal use only Historic Completed 2011-12 Planned 2013-14 • Drill-defined 99mlbs U3O8 • 1,245 holes re-probed or drilled by • JORC Code-compliant resource at 1,050 ppm Peninsula for QAQC and JORC 50mlbs U3O8 • 9,850 holes drilled by resource estimate • High grade 1,0

  26. Slide 26: Karoo JORC Code-compliant Resource

    Note: Totals may not sum exactly due to rounding. Karoo JORC Code-compliant Resource For personal use only Maiden JORC Code-compliant Resource January 2013* Classification eU3O8 Tonnes eU3O8 eU3O8 (ppm) (millions) (ppm) (million lbs) CUT-OFF Indicated 600 6.9 1,020 15.7 Inferred 600 14.8 1,050 34.4

  27. Slide 27: Karoo – Development Model

    Karoo – Development Model For personal use only Open Pit and Decline Mining • Multiple production faces with central processing facility at Rystkuil Alkaline Added Water Added • All sites within hauling distance • Planning development in 2016/2017 • Continue to delineate 150-250 mlbs of uranium mine

  28. Slide 28: Karoo – Development Schedule

    Karoo – Development Schedule For personal use only 2010 2011 2012 2013 2014 2015 2016 2017 Resource Definition ✔ (JORC conversion) Internal Conceptual Study Ext. Scoping Study ✔ PFS/BFS Project Financing Construction Commissioning Production Expanded Resource ✔ ✔ Drilling DEVELOPMENT TARGET C16/C17

  29. Slide 29: Investment Analysis

    Investment Analysis For personal use only • The uranium sector is coming off a historic low • Increased demand and tightening supply will lift the whole uranium sector • Uranium producers attract a significant premium • Peninsula is a near term uranium producer with high liquidity, high margins and

  30. Slide 30: Corporate

    Corporate For personal use only ASX: PEN, PENOC Head Office Unit 17, Level 2 Peninsula Energy Limited 100 Railway Road ABN 67 062 409 303 Subiaco WA 6008 Telephone: +61 8 9380 9920 Directors Facsimile: +61 8 9381 5064 Gus Simpson - Executive Chairman Malcolm James - Executive Director Website Alf Gi

Peninsula Energy — Mining Indaba Conference 2013 on 6ix