Slide 1: Developing a Strategic UK Critical Minerals Project
DEVELOPING A STRATEGIC UK CRITICAL MINERALS PROJECT November 2026 Leadership for an advanced project with a clear development strategy angleseymining.co.uk AIM: AYM

Slide 2: Disclaimer
2 angleseymining.co.uk DISCLAIMER

Slide 3: Contents
3 angleseymining.co.uk CONTENTS 01 02 03 04 Leadership The Asset & Resources & Mining, & Investment Development Exploration Metallurgy & Case Pathway Upside Economics 05 06 07 Development Summary & Appendix Strategy Contact

Slide 4: Building the Team and an Investment Case Ready to Advance
4 angleseymining.co.uk BUILDING THE TEAM AND AN INVESTMENT CASE READY TO ADVANCE LEADERSHIP & COMPANY PROGRESS

Slide 5: Why AYM
5 angleseymining.co.uk INVESTMENT PROFILE WHY AYM 100% Owned, Retained Asset: A Refreshed Company: Our Strategy: Three pathways to creating value UK's Largest polymetallic resource, Circa £4 million of debt eliminated in 2026. situated in North Wales. 1 Develop the Mine Advance Leadership Team with

Slide 6: Asset Investment Summary
6 angleseymining.co.uk ASSET INVESTMENT SUMMARY Strategic 100% Owned Proven Polymetallic Resources Established Brownfield Asset UK Asset at Parys Mountain with Significant Measured and Indicated Resources Growing emphasis on supply chain Sole focus on the flagship project, security and domestic mineral

Slide 7: Experienced Leadership Advancing Parys Mountain
7 angleseymining.co.uk BOARD OF DIRECTORS EXPERIENCED LEADERSHIP ADVANCING PARYS MOUNTAIN A proven team combining deep mining expertise, operational excellence, capital markets capability and corporate leadership to advance Anglesey Mining's vision. JIM WILLIAMS ANDREW FULTON BRENDAN CAHILL Executiv

Slide 8: Establishing the Foundations for Growth
8 angleseymining.co.uk PARYS MOUNTAIN ESTABLISHING THE FOUNDATIONS FOR GROWTH Recent progress has strengthened Anglesey Mining and established the corporate, financial and leadership foundations to advance the 100%-owned Parys Mountain project. £4 million debt £680,000 capital fundraise Martin Wood

Slide 9: Capital Structure
9 angleseymining.co.uk CORPORATE SNAPSHOT CAPITAL STRUCTURE £1.25m raised at 4.5p in November 2026 AYM 4.00p, 12 months 9 Nov 2026 10. 9. 8. Market cap at 4.00p £3.73m 7. 6. 5. Shares in issue 93,364,580 4. 3. 2. Debt (31 Mar 2026)* £110,000 1. 0. Nov 25 Feb 26 May 26 Aug 26 Nov 26 Warrants at 7p**

Slide 10: Funding to Deliver Key Milestones
10 angleseymining.co.uk FUNDING TO DELIVER K EY MILESTONES DEVELOP, GROW AND DISCOVER November 2026 Fundraise 12 Month Use of Funds Develop the Mine • Advance the Parys Mountain planning application by Q3 2028. £130k • Parallel engineering work will refine mine access and methods, geotechnical unders

Slide 11: Overview of Key Catalysts for Parys Mountain
11 angleseymining.co.uk OVERVIEW OF K EY CATALYSTS FOR PARYS MOUNTAIN BUILDING VALUE Q4 26 Q1 27 Q2 27 Q3 27 Q4 27 Q1 28 Q2 28 Q3 28 DEVELOP Planning strategy, scoping & pre-application ESIA / baselines / technical forums / application Water, TSF, mine design & metallurgy evidence Shaft: dewater and

Slide 12: An Advanced, Permitted Pathway to Production at Parys Mountain
12 angleseymining.co.uk AN ADVANCED, PERMITTED PATHWAY TO PRODUCTION AT PARYS MOUNTAIN THE ASSET & DEVELOPMENT PATHWAY

Slide 13: Domestic Raw Materials and UK Resilience
13 angleseymining.co.uk STRATEGIC POSITIONING DOMESTIC RAW MATERIALS AND UK RESILIENCE AYM can contribute a domestic source of metals within a diversified global supply chain GROWING POLICY FOCUS AYM’S POTENTIAL CONTRIBUTION UK critical minerals strategies in 2022, 2023 and Parys Mountain, Anglesey:

Slide 14: An Advanced Mine Development Project
14 angleseymining.co.uk AN ADVANCED MINE DEVELOPMENT PROJECT Independent technical studies, existing infrastructure and historical mine development provide a strong foundation for future mine development. Independent technical studies Existing infrastructure The 2021 Preliminary Economic Freehold ow

Slide 15: Structured Programme for Responsible Mine Development
15 angleseymining.co.uk PLANNING AND PERMITTING STRATEGY STRUCTURED PROGRAMME FOR RESPONSIBLE MINE DEVELOPMENT Existing planning permission for underground activities and extensive site information provide a strong foundation for the current modern permitting review and consent programme. Mid 1988 M

Slide 16: Re-evaluation of UK Mining Assets Now Underway
16 angleseymining.co.uk RE-EVALUATION OF UK MINING ASSETS NOW UNDERWAY TUN 30.70p, 12 months TIN 61.00p, 12 months SML 4.70p, 12 months 60. 160. 8. 140. 7. 50. 120. 6. 40. 100. 5. 30. 80. 4. 60. 3. 20. 40. 2. 10. 1. 20. 0. 0. 0. Nov 25 Feb 26 May 26 Aug 26 Nov 26 Nov 25 Feb 26 May 26 Aug 26 Nov 26 N

Slide 17: Potential for Parys Mountain to Grow
17 angleseymining.co.uk PARYS MOUNTAIN POTENTIAL FOR PARYS MOUNTAIN TO GROW Independent technical studies, existing infrastructure and historical mine development provide a strong foundation for future mine development. Why we believe Parys Mountain is undervalued Parys Minto South Crofty 100% owner

Slide 18: A Mine Plan Within a Larger Mineral System
18 angleseymining.co.uk A MINE PLAN WITHIN A LARGER MINERAL SYSTEM DEVELOP THE DEPOSIT, GROW THE SYSTEM & DISCOVER THE DISTRICT SW NE Mine development Morris Shaft The current mine development plan focuses on Historic Pit and UG Workings the Engine Zone, White Rock deposit and then the Northern Copp

Slide 19: Mine Development Contained Within Current Freeholds and Leases
19 angleseymining.co.uk MINE DEVELOPMENT CONTAINED WITHIN CURRENT FREEHOLDS AND LEASES DEVELOP THE DEPOSIT, GROW THE SYSTEM & DISCOVER THE DISTRICT Mine development The mine plans are to develop a modern underground complex, with low impact on surface features. Processing and tailings facilities are

Slide 20: A Large, Growing Resource with District-Scale Exploration Upside
20 angleseymining.co.uk A LARGE, GROWING RESOURCE WITH DISTRICT-SCALE EXPLORATION UPSIDE RESOURCES & EXPLORATION UPSIDE

Slide 21: Parys Mountain – Resources
21 angleseymining.co.uk PARYS MOUNTAIN – RESOURCES White Rock and Engine Zone using the March 2023 Micon Resource Update / MRE, and Northern Copper Zone, Garth Daniel and Deep Engine retained from the January 2021 PEA & MRE. Engine Zone¹ — Measured Northern Copper Zone² — Inferred Total Measured NCZ

Slide 22: Q1 2027 Drilling Programme to Confirm and Grow the System
22 angleseymining.co.uk Q1 2027 DRILLING PROGRAMME TO CONFIRM AND GROW THE SYSTEM DEVELOP THE DEPOSIT, GROW THE SYSTEM & DISCOVER THE DISTRICT Connect and Grow AYM 2027-001 First drill pad (Holes 001, 001A and 001B) will test the untested gap at the culmination of all main mineralised zones, specifi

Slide 23: Q1 2027 Drilling Programme to Confirm and Grow the System
23 angleseymining.co.uk Q1 2027 DRILLING PROGRAMME TO CONFIRM AND GROW THE SYSTEM DEVELOP THE DEPOSIT, GROW THE SYSTEM & DISCOVER THE DISTRICT Extend and Grow Second drill pad (Holes 002, 002A and 002B) will test the area at the eastern edge Morris of the currently defined MRE and; Shaft White Rock

Slide 24: Turning Parys Mountain's Resource into a Robust, De-risked Investment Case
24 angleseymining.co.uk TURNING PARYS MOUNTAIN'S RESOURCE INTO A ROBUST, DE-RISKED INVESTMENT CASE MINING, METALLURGY & ECONOMICS

Slide 25: Testwork and Metallurgical Performance
25 angleseymining.co.uk METALLURGY TESTWORK AND METALLURGICAL PERFORMANCE 1969 1986–91 2007 2023–24 2026 Lakefield WSL / Robertson / AYM Wardell Armstrong Grinding Solutions AYM independent review Northern Copper flotation Lab, pilot plant and gravity Preconcentration and flotation Sorting, DMS and

Slide 26: Technical Opportunities
26 angleseymining.co.uk METALLURGY TECHNICAL OPPORTUNITIES TO TEST TO RESOLVE Preconcentration Representativeness Historical sorting / DMS retained c.95% of combined metal in 60– Historical samples generally exceed MRE head grades. Test all 65% of feed mass. Test coarser sorting and each ore domain.

Slide 27: Parys Mountain Generates Value from a Diversified Suite of Payable Metals
27 angleseymining.co.uk METAL PROFILE PARYS MOUNTAIN GENERATES VALUE FROM A DIVERSIFIED SUITE OF PAYABLE METALS At 3,000tpd, an average output of c.15ktpa CuEq, peaking at c.20kt CuEq NSR BY METAL (2021 PEA Pricing) Annual Output in copper equivalents Copper/Zinc dominant revenue 16000 stream 7% 140

Slide 28: Copper & Zinc: Growing Critical Minerals
28 angleseymining.co.uk COPPER & ZINC: GROWING CRITICAL MINERALS Copper and Zinc prices: 2021 to today Annual average prices in US$/metric tonne; 2026 uses latest cash/spot price as of 30 June 2026. Copper +43.2% Zinc +18.7% Long-term demand for copper and zinc is Copper trend line expected to be su

Slide 29: 2026 Internal Economic Re-evaluation
29 angleseymining.co.uk 2026 INTERNAL ECONOMIC RE-EVALUATION ASSESSING THE IMPACT OF CURRENT MARKET CONDITIONS ON THE 2021 PEA Case A based on 1,500t/day Initial Underground Development Case C based on 3,000t/day Wider Underground Development and mining of White Rock and Engine Zone AYM Forecast as

Slide 30: 2026 Internal Economic Re-evaluation: Price Scenarios
30 angleseymining.co.uk 2026 INTERNAL ECONOMIC RE-EVALUATION ASSESSING THE IMPACT OF CURRENT MARKET CONDITIONS ON THE 2021 PEA 600 532 Metal / unit Conserv. Planning Upside Pre-tax NPV₁₀ by price scenario (US$m) Cu / US$/lb 4.50 5.25 6.10 392 400 Zn / US$/lb 1.30 1.45 1.60 265 207 Pb / US$/lb 0.95 1

Slide 31: Concentrate Marketing - Building Commercial Optionality
31 angleseymining.co.uk CONCENTRATE MARKETING CONCENTRATE MARKETING - BUILDING COMMERCIAL OPTIONALITY ILLUSTRATIVE ROUTES TO MARKET MARKETABLE CONCENTRATE POTENTIAL Historical testwork supports a route to marketable EUROPE copper, zinc and lead concentrates. Parys Mountain ASIA / CHINA Copper: optim

Slide 32: A Potentially Resilient UK Critical Material Supply Chain
32 angleseymining.co.uk CONCENTRATE MARKETING A POTENTIALLY RESILIENT UK CRITICAL MATERIAL SUPPLY CHAIN PARYS MOUNTAIN EUROPEAN REFINING UK METAL SUPPLY Cu / Zn / Pb concentrates Prospective processing route Manufacturing and potential Mine development and offtake Suitable facilities and agreed term

Slide 33: Advancing Development, Unlocking Growth
33 angleseymining.co.uk ADVANCING DEVELOPMENT, UNLOCKING GROWTH DEVELOPMENT STRATEGY

Slide 34: Technical Development Strategy
34 angleseymining.co.uk TECHNICAL DEVELOPMENT STRATEGY A systematic programme to advance mine development, grow the resource and unlock district-scale exploration potential. Advancing the Increase the knowledge, Identify new exploration development of the confidence and value of the targets within t

Slide 35: A Compelling, De-risked Investment Case Ready to Advance
35 angleseymining.co.uk A COMPELLING, DE-RISKED INVESTMENT CASE READY TO ADVANCE INVESTMENT SUMMARY & CONTACT

Slide 36: Investment Summary
36 angleseymining.co.uk INVESTMENT SUMMARY Strategic 100% Owned Proven Polymetallic Resources Established Brownfield Asset UK Asset at Parys Mountain with Significant Measured and Indicated Resources Growing emphasis on supply chain Sole focus on the flagship project, security and domestic mineral with

Slide 37: Contact Information
CONTACT INFORMATION mail@angleseymining.co.uk angleseymining.co.uk

Slide 38: Supporting Technical Detail and Historical Context
38 angleseymining.co.uk SUPPORTING TECHNICAL DETAIL AND HISTORICAL CONTEXT APPENDIX

Slide 39: 2023 Drill Results Confirm Geological System and Highlight Further Resource Upside
39 angleseymining.co.uk 2023 DRILL RESULTS CONFIRM GEOLOGICAL SYSTEM AND HIGHLIGHT FURTHER RESOURCE UPSIDE NCZ001 intersections include: Garth Daniel intersection includes: ● NCZ002 intersected a broad – 63.0m @ 0.7% CuEq (NCZ): and, – 4.0m @ 4.9% CuEq (5.2% Cu, zone of sulphides from 426m This rece

Slide 40: System Mineralisation Identified Along 1,600m of Strike
40 angleseymining.co.uk OPTIONS TO EXTEND THE RESOURCE SYSTEM SYSTEM MINERALISATION IDENTIFIED ALONG 1,600M OF STRIKE A White Rock Extension B Engine Zone Extension 200 m C Linking Deep Engine Zone and Garth Daniel 400 m D Northern Copper Zone E Orient Shaft Zone 600 m Legend 1000 m 1200 m 1400 m 16

Slide 41: Multiple Target Horizons Within the Mineralised System
41 angleseymining.co.uk OPTIONS TO EXTEND THE RESOURCE SYSTEM MULTIPLE TARGET HORIZONS WITHIN THE MINERALISED SYSTEM 4600E 4800E Garth Daniel Zone Central Zone Northern Copper Zone High-grade polymetallic massive High-grade polymetallic massive sulphides Cu dominant stockwork, veinlets hosting sulph

Slide 42: Northern Copper Zone History
42 angleseymining.co.uk NORTHERN COPPER ZONE HISTORY M-series holes discovered the mineralised zone in 1962 Internal resource estimate of 17Mt @ 0.71% Cu in 1968, with 'potential' scale implied at 60 – 200Mt 1962 1968 – 1972 1973 – 1975 1981 – 1985 2004 – 2008 2012 ● After drilling of H-series holes

Slide 43: Underexplored VMS System
43 angleseymining.co.uk UNDEREXPLORED VMS SYSTEM Sporadic exploration followed by infill drilling of white rock and engine zone ● Northern Copper Zone first identified in 1961 drilling ● White Rock and Engine Zone discovered 1980 – 1981 ● Since 1961, a total of 369 diamond drill holes completed across

Slide 44: Historical Drill Intersections
44 angleseymining.co.uk HISTORICAL DRILL INTERSECTIONS Northern Copper Zone and southern contact (Garth Daniel) unfinished business These zones needs further drilling to confirm grades and continuity (all Inferred resource category) Selection of High Grade Intersections Hole ID Depth (m) Width (m) Gr

Slide 45: Respecting the Heritage
45 angleseymining.co.uk RESPECTING THE HERITAGE Remaining resources are underground and located outside of the historic mining site ● All future mining will be underground ● There are no plans to do any surface or open pit mining ● Preservation of existing heritage areas, Sites of Special Scientific

Slide 46: Further High-Grade Extension – Questions to Be Answered by the 2027 Drilling Programme
46 angleseymining.co.uk FURTHER HIGH-GRADE EXTENSION – QUESTIONS TO BE ANSWERED BY THE 2027 DRILLING PROGRAMME 1962 1968 – 1972 1973 – 1975 1981 – 1985 2004 – 2008 2012 1.0km ● Exploration target along southern contact – potential outline of 800m (s) x 500m (d) x 3.5m (w) x 2.9 (SG) ● Lower Engine Z
Source: company website
More decks from Anglesey Mining plc
Investor Presentation (September 2026)33 slides · September 2026
Investor Presentation (February 2026)26 slides · February 2026
Investor Presentation (February 2026)22 slides · February 2026
Corporate Update (July 2025)17 slides · Jul 30, 2025
Investor Presentation (November 2024)32 slides · Nov 21, 2024
Investor Presentation (June 2024)33 slides · June 2024