Slide 1: Treatment System Illustration
Treatment System Illustration 1
Slide 2: How Long Will it Take
How Long Will it Take Timeline following RAP approval • Construction and startup of the treatment system is 26 months • Operation of treatment is 48 years based on model simulation - Majority of groundwater contamination is removed in first 10 years • Post active remediation monitoring is a minimum
Slide 3: How Long Will it Take (cont.)
How Long Will it Take (cont.) Mass of Chemicals Remaining After Startup of the Groundwater Pump and Treatment System 3
Slide 4: Cleanup Over Time of 1,4 Dioxane in the LSAS
Cleanup Over Time of 1,4 Dioxane in the LSAS 4
Slide 5: 1,4-Dioxane in the LSAS: Time = Present
1,4-DIOXANE IN THE LSAS TIME = PRESENT
Slide 6: 1,4-Dioxane in the LSAS: Time = 5 Years from Startup
1,4-DIOXANE IN THE LSAS TIME = 5 YEARS FROM STARTUP
Slide 7: 1,4-Dioxane in the LSAS: Time = 10 Years from Startup
1,4-DIOXANE IN THE LSAS TIME = 10 YEARS FROM STARTUP
Slide 8: 1,4-Dioxane in the LSAS: Time = 20 Years from Startup
1,4-DIOXANE IN THE LSAS TIME = 20 YEARS FROM STARTUP
Slide 9: 1,4-Dioxane in the LSAS: Time = 40 Years from Startup
1,4-DIOXANE IN THE LSAS TIME = 40 YEARS FROM STARTUP
Slide 10: Cleanup Over Time of TCE in the LSAS
Cleanup Over Time of TCE in the LSAS 10
Slide 11: TCE in the LSAS: Time = Present
Concentration : 20000 ALLEVAST ROAD “A LAAYLS HL6L “A LASYLS HL8L “LOLS HLZb “ALO LS HLOL 3 LaSYLS HLOL LAaeLS HLS) LSV3 41NS FIONINAS TCE IN THE LSAS PRESENT TIME =
Slide 12: TCE in the LSAS: Time = 5 Years from Startup
TCE IN THE LSAS TIME = 5 YEARS FROM STARTUP
Slide 13: TCE in the LSAS: Time = 10 Years from Startup
TCE IN THE LSAS TIME = 10 YEARS FROM STARTUP
Slide 14: TCE in the LSAS: Time = 20 Years from Startup
TCE IN THE LSAS TIME = 20 YEARS FROM STARTUP
Slide 15: TCE in the LSAS: Time = 40 Years from Startup
TCE IN THE LSAS TIME = 40 YEARS FROM STARTUP
Slide 16: How Long Will it Take (cont.): Post Active Remediation Monitoring
How Long Will it Take (cont.) Post Active Remediation Monitoring • As each groundwater recovery area achieves cleanup - Area will be recommended for shut down - Upon FDEP approval, extraction system will be shut down and kept in standby mode - One year of post active remediation monitoring to check