  1. Slide 1: AGM Presentation - Wingellina Nickel-Cobalt Project

    AGM PRESENTATION For personal use only WINGELLINA - A WORLD CL ASS NICKEL COBALT PROJECT WINGELLINA NICKEL-COBALT PROJECT NOVEMBER 2024 | ASX:NC1

  2. Slide 2: Important Notice and Disclaimer

    IMPORTANT NOTICE AND DISCLAIMER This investor presentation (Presentation) is dated November 2024 and has been prepared by Nico Resources Limited (ABN 80 649 817 425) (Nico or the Company). Summary Information The Presentation is based upon information available to the Company at the date of this Pre

  3. Slide 3: Company Summary

    COMPANY SUMMARY Board and Management Share Price Performance Relative Share Price Performance Peter Cook (Non-Executive Chairman) 0.6 2,000 Ardea Resources Centaurus Metals Sunrise Energy Metals Jonathan Shellabear (Managing Director/CEO) 1,800 Chalice Mining Alliance Nickel Nico Resources 0.5 Nicke

  4. Slide 4: Introduction

    INTRODUCTION • Wingellina is one of very few large-scale nickel development projects outside of Indonesia 1 • 1.56 Mt of contained nickel and 123kt of contained cobalt in probable reserves (168.4Mt at 0.93% Ni and 0.07% Co) • An oxide (limonite/goethite), high iron deposit (47% Fe203) with low magne

  5. Slide 5: Wingellina Resources

    WINGELLINA RESOURCES • The Wingellina nickel-cobalt oxide resource comprises two main north-westerly striking zones of limonitic and lesser saprolitic (elevated Mg) ore • Independent resource estimate undertaken by ERM Australia (formerly CSA Global) • MRE incorporated detailed geological, geochemic

  6. Slide 6: A Globally Significant Project

    A GLOBALLY SIGNIFICANT PROJECT 4,500,000 4.50 WORLD’S LARGEST UNDEVELOPED NICKEL PROJECTS (EX-INDONESIA) 4,000,000 4.00 3,500,000 3.50 3,000,000 3.00 For personal use only Contained Metal (Tonnes Ni Equiv.) 2,500,000 2.50 Ni Equiv. Grade (%) 2,000,000 2.00 1,500,000 1.50 1,000,000 1.00 500,000 0.50

  7. Slide 7: Metallurgical Testwork Summary

    METALLURGICAL TESTWORK SUMMARY • ALS Laboratories engaged to undertake bench scale metallurgical testwork1 • Objective is confirmation of selected pilot flowsheet • Ore preparation testwork (assay by size) • HPAL testwork to define optimium conditions (temperature, acid injection, ORP) • Primary Neu

  8. Slide 8: Metallurgical Testwork Summary

    METALLURGICAL TESTWORK SUMMARY For personal use only Most of the nickel is contained within the fine fraction which enhances leaching kinetics and requires limited grinding Rejection of course size fractions improves nickel grade and removes acid consuming minerals (gibbsite, magnesite and calcite)

  9. Slide 9: Process Flowsheet

    PROCESS FLOWSHEET For personal use only A simple HPAL flowsheet that is well understood 9

  10. Slide 10: Processing Summary

    PROCESSING SUMMARY • Project to utilise simplified and proven HPAL technology (now 5th Generation) to produce MHP. • Project supported by onsite acid plant for the creation of sulphuric acid with an energy by-product – around 50% of power requirements by co-generation. • ROM ore will be screened, ov

  11. Slide 11: Infrastructure Summary

    INFRASTRUCTURE SUMMARY • Logistics are a key focus – upgrading and sealing of Outback Way is a major benefit to the project • Two logistics options either through the Port of Darwin or Esperance • Esperance is the shorter route • Transport of materials is a key cost (around $0.65/lb of nickel produc

  12. Slide 12: Government & Stakeholder Engagement

    GOVERNMENT & STAKEHOLDER ENGAGEMENT Traditional Owners • In July 2010, Hinckley Range, a subsidiary of Nico, signed a landmark mining agreement with the Traditional Owners and the granted Native Title holders of the Project. The agreement was registered as an Indigenous Land Use Agreement in October

  13. Slide 13: Wingellina Project Investment Highlights

    WINGELLINA PROJECT INVESTMENT HIGHLIGHTS • The Wingellina Project is a world class, globally significant project - one of very few outside of Indonesia – with significant comparative advantages when compared to other undeveloped projects • The PFS outlined an economic project characterised by: • Rob

  14. Slide 14: Comparative Valuation Snapshot

    COMPARATIVE VALUATION SNAPSHOT Nico’s Wingellina project has the largest reserve and highest grade of all comparative companies and quality ore (oxide-type nickeliferous limonite) Project Comparable Values 2,000,000 2.00 $0.030 Note: Bubble size is reserve size of contained nickel equivalent (nickel

  15. Slide 15: Appendices

    For personal use only APPENDICES 15

  16. Slide 16: Comparison Deposit Data - Appendix

    COMPARISON DEPOSIT DATA – APPENDIX 1 Project Company Location Tonnes Ni Grade (%) Co Grade (%) Cu Grade (%) PGM Grade (g/t) Ni Eq. Grade (%) Source Documents Canada Nickel, Crawford Nickel Sulphide Project NI 43-101 Technical Crawford Canada Nickel Ontario, Canada 1,715,000,000 0.22 0.01 0.00 0.02 0

  17. Slide 17: Company Directors - Appendix

    COMPANY DIRECTORS – APPENDIX 2 Peter Cook Jonathan Shellabear Roderick Corps Stewart Findlay Brett Smith BSc (Geology), MSc (Mineral Economics) BSc (Hons) (Geology), MBA, FAusIMM B.Comm B.Chem Eng, MBA, M Res Methodology Non-Executive Chairman Managing Director and Chief Executive Non-Executive Dire

  18. Slide 18: Senior Company Management - Appendix

    SENIOR COMPANY MANAGEMENT – APPENDIX 2 Amanda Burgess Fergus Kiley Francois Schmid Len Glumac BEcon, CPA BSc, Geology (Hons) BEng (Hons) (Chemical) B. Eng (Chemical) Company Secretary General Manager - Operations Head of Process Engineering Principal Process Engineer Ms Burgess is an accounting and

  19. Slide 19: Senior Company Management - Appendix

    SENIOR COMPANY MANAGEMENT – APPENDIX 2 Matt Jones Max Maczurad Frank Raschella Kim Pervan BSc, Geology (Hons) BSc (Geology) B.Eng (Mechanical) BA, FPRIA Head of Geology Senior Project Geologist Principal Mechanical Engineer Stakeholder Manager Mr Jones is a geologist with 20 years’ Mr Maczurad has b

  20. Slide 20: Nickel Laterite Deposit Styles - Appendix

    NICKEL LATERITE DEPOSIT STYLES – APPENDIX 3 WA Goldfields Coral Triangle Wingellina Laterite Laterite Laterite Ferricrete 2 to 10 metres Limonite Ni (%) Mg (%) Fe2O3 (%) Ni (%) Mg (%) Fe2O3 (%) Ni (%) Mg (%) Fe2O3 (%) 0.6 - 1.4 1.5 - 2.5 35 - 45 1.0 - 1.7 1.0 - 4.0 45 0.8 - 1.5 1.5 - 2.5 40 - 50 Hig

  21. Slide 21: Nickel Supply Chain - Appendix

    NICKEL SUPPLY CHAIN – APPENDIX 4 Sulphide Pyrometallurgical Flow Sheet Sulphide Hydromet Laterite Flow Sheet Legend Sulphide ores typically Flow Sheet occur as economically Sulphide Ore | Ni-Cu-Co-PGE Limonite Ore | Ni-Co-Mn Saprolite Ore | Ni-Co-Mn Ore sources viable in-situ grades POX of between 1

  22. Slide 22: PFS Key Consultants and Contributors - Appendix

    PFS KEY CONSULTANTS AND CONTRIBUTORS – APPENDIX 5 For personal use only 22

  23. Slide 23: PFS Economic Highlights - Appendix

    PFS ECONOMIC HIGHLIGHTS – APPENDIX 5 Robust financial and investment metrics for both Base Case and Spot Case Base Case Spot (at the time of PFS release) Assumptions WoodMac / S&P MI (Blend) Nickel price1 US$30,000/t US$21,472/t For personal use only WoodMac / S&P MI (Blend) Cobalt price1 US$50,995/

  24. Slide 24: Wingellina Opex & Capex Summary - Appendix

    WINGELLINA OPEX & CAPEX SUMMARY – APPENDIX 5 Low operating costs producing strong cash operating margin and payback of capital within 4 to 5 years Area Description1 AUD/t USD/t USD/lb Area Description AUD M’s USD1 M’s Mining 632.4 423.7 0.19 Processing Plant $812.98 $544.70 Process Plant 8,369.7 5,6

  25. Slide 25: Project Resources and Reserves - Appendix

    PROJECT RESOURCES AND RESERVES – APPENDIX 7 Classification Tonnes Ni Grade (%) Co Grade (%) Fe2O3 Grade (%) MgO Grade (%) Ni Metal (k tonnes) Co Metal (k tonnes) Measured Indicated 164,100,000 0.93 0.06 42.8 3.3 1,531 98 Inferred 23,300,000 0.72 0.03 23.0 8.6 166 7.3 Total 187,300,000 0.91 0.06 40.3

  26. Slide 26: Wingellina Project History - Appendix

    WINGELLINA PROJECT HISTORY – APPENDIX 8 • The first deposits of nickel oxides in the Musgrave Block were discovered in the Mt. Davies area by South Australian Government geologists in 1954. International Nickel Company (“Inco”) identified that the regional geology was similar to the Sudbury deposit

  27. Slide 27: Contact Details

    For personal use only Contact Details Jonathan Shellabear (Managing Director and Chief Executive Officer) Level 6, 190 St. Georges Terrace, Perth, Western Australia jonathan.shellabear@nicorresources.com.au 27