Beacon Minerals Limited · ASX:BCN

Beacon Minerals — Investor Presentation (June 2008)

27 slides from Beacon Minerals's investor presentation, Jun 12, 2008

  1. Slide 1: Company Presentation

    COMPANY PRESENTATION A new beginning in an exciting land For personal use only Bringing experience, enthusiasm & commitment to Kyrgyzstan ! June 2008

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only This This presentation presentation includes includes predictive predictive information information that that is is intend ed to intended to be be made made as as ““forward-looking” forward-looking” within within the the safe safe harbor harbor protections protection

  3. Slide 3: Company Overview

    COMPANY OVERVIEW For personal use only ASX Codes: BCN, BCNO Shares on Issue : Pre Acquisition 34,186,648 Post Acquisition* 77,470,228 Escrowed: 8,390,000 Listed Options: 22,738,352 Unlisted Options: 6,000,000 @ 20c (Aug 2010) 44,783,580 @ 30c (Aug 2010)* Market Capital (16c): Pre Acquisition $ 5,470

  4. Slide 4: Management Team

    MANAGEMENT TEAM For personal use only Matthew Egan Chairman (age 43) 20 years Industry Experience, Owner, ‘Egan Drilling Services’ Darryl Harris Managing Director (age 49) Metallurgist, 30 years experience Chairman – Indo Mines Ltd Paul Lloyd Executive Director (age 44) Chartered Accountant, 20 year

  5. Slide 5: Projects

    PROJECTS For personal use only Baladjan – Djeldisyu (Si) AUSTRALIA Kumushtak (Ag-Au-Cu) Keptash (Au-Mo-Cu) Barlee Project Gold Greenvale Project Gold, Copper, Zinc, Moly KYRGYSTAN Baladjan - Djeldisyu Project Silicon Greenvale Au-Cu-Zn Kumushtak Project Barlee Silver, Gold, copper Au-Ni-U Keptash Pr

  6. Slide 6: Kyrgyzstan – General Information

    KYRGYZSTAN – GENERAL INFORMATION For personal use only • Achieved Independence from USSR in 1991 • Population 5.3 M, landlocked, mountainous, 199,000 km2 • Government committed to rapid transition to free market economy, and development of viable mining industry • Guarantees in Foreign Investment an

  7. Slide 7: Baladjan - Djeldisyu Silicon Projects

    BALADJAN - DJELDISYU SILICON PROJECTS For personal use only • Potential to host an exploration target of 4 to 20 million tonnes of quartzite. • Grades averaging +98%, with peaks to 99.4% SiO2 (Silica). • Commence FS (+ JORC compliant resource), for ~ 30,000 tonnes per year of metallurgical grade (MG

  8. Slide 8: Baladjan - Djeldisyu Silicon Projects

    BALADJAN - DJELDISYU SILICON PROJECTS For personal use only 1000m Schematic Geology Baladjan Project Exploration Target 4 - 20 Mt Quartzite

  9. Slide 9: Baladjan Silicon Project: Key Project Advantages

    BALADJAN SILICON PROJECT For personal use only Key Project Advantages Quality Raw Materials large volume ( 4- 20 Mt ) of high quality ( + 98 % SiO2 ) Quartzite Type SiO2 Al2O3 CaO Fe 2O3 K2O MgO MnO Na 2O P2O5 TiO2 ZrO2 Average White 98.39 0.4173 0.0557 0.8609 0.1131 0.0333 0.0065 0.0108 0.0095 0.04

  10. Slide 10: Silicon Manufacturing

    SILICON MANUFACTURING For personal use only Conceptual Processing Flowsheet CBCC, Brazil: SiMet/FeSi Plant with two 19 MVA Furnaces & Auxiliaries ( Courtesy SMS Demag )

  11. Slide 11: Uses of Silicon

    For personal use only USES OF SILICON Key applications of Silicon (and its main variants) are: Ferrosilicon alloy addition in iron and steel products (improves strength and quality) Silicon metal - production of silanes, silicones, aluminium alloying, and semiconductor-grade silicon Semiconductor-gr

  12. Slide 12: Silicon Uses & Prices

    SILICON USES & PRICES For personal use only Ferrosilicon Metallurgical Grade Polysilicon Silicon ~ Grades 50 to 75% 98.5 to 99 .9% 99.9 – % Si 99.999999999% Main Steel and Cast Cast Aluminium Semiconductors Application Iron alloys s Silicones/Silanes Solar Cells Major China 1315kt China 614kt USA 10

  13. Slide 13: Silicon Project Development

    SILICON PROJECT DEVELOPMENT For personal use only Development Schedule Independent Feasibility Study and Testwork for a 30,000 tpa Metallurgical Grade Silicon Plant by leading technology supplier ( Commence October 08 ) Establish JORC compliant resource suitable for 20 years life of ~ 1.5 million to

  14. Slide 14: Kyrgyzstan Existing Gold Deposits

    KYRGYZSTAN Existing Gold Deposits For personal use only BCN Akbakai Projects 7 Moz Taldybulak 3 Moz Shyraldahyn ~ 5Moz Jerooy 3.2 Moz Arxi 3.8Moz Muruntau Kumtor 170Moz 17 Moz Makmal 5 Moz Zarmitan 6 Moz Part of Tien Shan Gold Belt – Major Metallogenic Province in Central Asia

  15. Slide 15: Kumushtak Silver Project

    KUMUSHTAK SILVER PROJECT • Series of 0.2 – 3.0m wide silver rich quartz- For personal use only siderite-sulphide veins within 30m broad mineralised zone. • Significant previous workings – over 1 km of adits 1991 Soviet Adit • Silver grades avg ~ 202 g/t (max 4200 g/t) Soviet access track • Au, Cu an

  16. Slide 16: Kumushtak Silver Project

    KUMUSHTAK SILVER PROJECT For personal use only 1000m diamond drill program planned July 08 Planned holes Adit Adit Adit Soviet Trenching Sulphide Mineralisation

  17. Slide 17: Keptash Polymetallic Project

    KEPTASH POLYMETALLIC PROJECT For personal use only • Large geochemical anomaly - Au, Cu, Mo 1000m X 300m area. • Surface rock chip samples (Historical) : Au to 5.0 g/t. 12m trench sample @ 0.13% Mo. • Ground geophysics (IP) suggest sulphide body at depth. Detailed IP planned in July 08. • Drilling p

  18. Slide 18: Keptash Polymetallic Project

    KEPTASH POLYMETALLIC PROJECT For personal use only Rock chip samples to 5g/t Au Trenching 12m @ 0.13% Mo Visible Cu minerals

  19. Slide 19: Barlee Project

    BARLEE PROJECT (BCN 80% E77/1297 For personal use only 100% EL77/1364 & EL77/1392) • Well endowed mineralised belt • Completed approx. 5000 m RC and 15000m Air Core drilling • Under explored - only drilled a 3.5 km2 area of 340 km2 total EL • Significant First Pass, shallow RC results

  20. Slide 20: Barlee Project

    BARLEE PROJECT For personal use only Significant Exploration Potential • Shallow resource potential • Prospective for Au, Ni & U • Planned 5000 m of drilling in July 08 • evaluate depth and strike extensions and • to develop a JORC resource

  21. Slide 21: Barlee Project: Significant Shallow RC Results

    BARLEE PROJECT Significant Shallow RC Results Phil For personal use only Halleys East • 11m @ 24.9 g/t (inc. 3m @ 64.7 g/t) 500m • 19m @ 4.9 g/t (inc. 2m @ 28 g/t) • 8m @ 6.6 g/t • 2m @ 55.1 g/t • 2m @ 44.5 g/t Buddy • 9m @ 2.0 g/t Halleys • 2m @ 13.6 g/t East Phil • 14m @ 3.7 g/t Buddy • 6m @ 1.6 g

  22. Slide 22: Halleys East – Cross Sections

    HALLEYS EAST – CROSS SECTIONS (25 m apart) For personal use only 11/24.9 8/6.6 19/4.9 3/6.5 3/6.8 2/55.1 1/22 3/7.1 2/44.5 5/4.9 Follow-up RC planned with the aim of defining JORC compliant resources

  23. Slide 23: Greenvale Project

    GREENVALE PROJECT Earning 80% interest from Glengarry Resources For personal use only • Over 300 sq km of ground • Spend A$ 850,000 over 3 years until Jan 2010 • Close to existing mines, towns and power • Future RC drilling planned next year (2500m) at Galah Dam 5m @ 8.5% Zn Steam Engine 6m @ 5.5 g/

  24. Slide 24: Greenvale Project: Steam Engine Gold Prospect

    GREENVALE PROJECT Steam Engine Gold Prospect For personal use only LUCKY CREEK JV • BCN Drill Results RC planned RC planned 6m @ 5.5g/t (inc. 2m @ 15.6g/t) 12m @ 3.5 g/t 5m @ 4.5 g/t 5m @ 4.3 g/t • Over 5 km of old workings RC planned +/- soil anomalies • Gold mineralisation at surface • Priority dr

  25. Slide 25: Proposed Exploration

    PROPOSED EXPLORATION For personal use only AUSTRALIA • Further RC drilling at Barlee ( June-July ) • Commence preliminary metallurgical testwork ( September ) KRYGYZSTAN • Commence JORC compliance, Feasibility Study and testwork at Balajdan-Djelidsyu ( 2nd ½ 2008 ) • Drilling (DC) programmes at Kumu

  26. Slide 26: Beacon Minerals Ltd

    For personal use only BEACON MINERALS LTD Level 2, 46 Ord St West Perth, WA, 6005. Ph: 08- 9476 9200 Fax: 08- 9476 9099 Darryl Harris (Managing Director) Paul Lloyd (Executive Director) website: www.beaconminerals.com

  27. Slide 27: Competent Persons Statement

    COMPETANT PERSONS STATEMENT For personal use only In accordance with Listing Rules 5.6 of the Australian Stock Exchange, the technical information contained in this report pertaining to the Krygyzstan projects has been compiled by Mr. Darryl Harris, proposed Managing Director of Beacon Minerals Ltd,

Beacon Minerals — Investor Presentation (June 2008) on 6ix