Impact Silver Corp. · TSXV:IPT

Impact Silver — Investor Presentation (May 2011)

24 slides from Impact Silver's investor presentation, May 2011

  1. Slide 1: Corporate Presentation May 2011

    CORPORATE PRESENTATION MAY 2011 IPT TSX-V

  2. Slide 2: Cautionary Disclaimer

    CAUTIONARY DISCLAIMER Except for historical information, this presentation may contain forward-looking statements. These statements involve known and unknown risks, uncertainties, and other factors that may cause the Company’s actual results, levels of activity, performance or achievements to be mat

  3. Slide 3: Project Location

    PROJECT LOCATION • Two Mineral Districts: The 423 sq km Royal Mines of Zacualpan & 200 sq km Mamatla Silver Districts are located in the southern portion of the Mexican Silver Belt 3

  4. Slide 4: Project Overview

    PROJECT OVERVIEW • 100% owned 623 km2 districts • District production began 1527 • 1975-2009 over 34 million Silver equivalent ounces produced • 2,000 old mine workings in GIS database (November 2010) 4

  5. Slide 5: Royal Mines of Zacualpan

    ROYAL MINES OF ZACUALPAN PRODUCTION • Experienced management team • Low cost production ($60/tonne) • Rapid mine development 12 – 24 months from discovery hole to production • 30% increase in Silver production year over year • Consistently generating profits since inception in 2006 GROWTH • January

  6. Slide 6: Summary of Existing Operations

    SUMMARY OF EXISTING OPERATIONS Excellent • Modern power grid • No environmental issues • Paved highway access • No security issues Mining • Abundant water supply • 3 hour drive from Mexico City Environment • Trained work force Existing Facilities • Three mines feed a central 500 tpd processing plant

  7. Slide 7: Guadalupe 500 tpd Processing Plant

    GUADALUPE 500 TPD PROCESSING PLANT • Continuous upgrades to expand capacity to 500 tpd 7

  8. Slide 8: Royal Mines of Zacualpan cont'd

    ROYAL MINES OF ZACUALPAN cont’d EXPLORATION • Large 623 km2 land package 100% Owned • Over 2,000 historic mine workings compiled • Skilled and successful exploration team: 2008: Chivo Mine Development 2009: San Ramon Mine Expansion 2010: Noche Buena Mine Development 2011: Capire Mine Development 8

  9. Slide 9: Current Producing Mines

    CURRENT PRODUCING MINES Three mines feed the 500 tpd Guadalupe Processing Plant CHIVO MINE • Flagship mine producing 43% of mill feed SAN RAMON MINE • High grade epithermal silver vein with recent discovery of large stockwork zone NOCHE BUENA MINE • Newest addition to production profile, commenced i

  10. Slide 10: Chivo Mine

    CHIVO MINE • Chivo is IMPACT Silver’s flagship producing mine • Discovered in late 2005, commenced production in November 2007 • Rapid mine development: production within 24 months • High grade epithermal Silver vein with by-product Lead & Zinc • Provides 43% of mill feed Scoop Tram hauling ore from

  11. Slide 11: San Ramon Mine

    SAN RAMON MINE • Located 1.3 km south of Chivo Mine • High grade epithermal silver vein with historic grades of 5,000 g/t silver in upper levels • Restarted mining at San Ramon in 2008 • Expansion of production now starting based on discovery of 20m wide stockwork zone on Level 5 • Provides 37% of m

  12. Slide 12: Noche Buena Mine

    NOCHE BUENA MINE Noche Buena Mine Portal • Discovery hole drilled in December 2008 • Initial production achieved in March 2010 • Rapid development: production within 15 months NOCHEBUENA SILVER ZONE Drilling Highlights • Provides 6% of mill feed Drill Hole True Width (m) Ag (g/t) Au (g/t) Z09-43 3.2

  13. Slide 13: Zoning in Ore Shoots

    ZONING IN ORE SHOOTS • Epithermal vein mineralization typically occurs in ore shoots measuring 50-400m in length, 2-8m in width and 300m vertical • Mineral shoots tend to have very high grade silver tops (e.g.- Chivo Mine and San Ramon Mine) • Mineral shoots tend to have higher lead-zinc grades at d

  14. Slide 14: Gold-Copper Mineralization

    GOLD-COPPER MINERALIZATION • Carlos Pacheco was the first gold-copper target to be drilled • Gold-Copper mineralization found in deeper parts of Silver vein system • Phase One drill program complete and opening of old underground workings begun CARLOS PACHECO Drilling Highlights Drill True Au Ag Cu

  15. Slide 15: The Next Mining District - Capire VMS Subdistrict

    THE NEXT MINING DISTRICT - CAPIRE VMS SUBDISTRICT 15

  16. Slide 16: Capire VMS Subdistrict

    CAPIRE VMS SUBDISTRICT • 100% owned; 200 km2 District • NI 43-101 Mineral Resource Estimate on Capire Project • Northeast quadrant hosts gold and silver veins • Southeast quadrant hosts veins and VMS deposits • Numerous drill ready targets Refer to Slide 4: Property Holdings Map. 16

  17. Slide 17: NI 43-101 Resource Estimate

    NI 43-101 RESOURCE ESTIMATE • Capire Deposit NI43-101 mineral resources estimates (January 2011) Metal Content for Capire + Aurora 1 Ag (oz) Au (oz) Cu (lbs) Pb (lbs) Zn (lbs) Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820 Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173 Measure

  18. Slide 18: Capire Mine Development Project

    CAPIRE MINE DEVELOPMENT PROJECT 3D SURFACE MODEL Area of defined NI43-101 Resources Open for expansion 3D model of planned Capire open pit Open for expansion Area of Phase 2 drill Planned Processing program Plant Site Open for expansion Proposed Tailings Facility DEVELOPMENT PLANS • 2011: Permitting

  19. Slide 19: Exploration Process

    EXPLORATION PROCESS • Targets are generated by mapping and sampling of old workings • Greatly expanded program of exploration drilling for 2011 5 STAGE DEVELOPMENT PROCESS Identify and Surface and Phase 1 & 2 Mine Map Old Underground Drilling Planning, Mines and Sampling, Permitting Production Worki

  20. Slide 20: Zacatecas

    ZACATECAS Exploration Production • 100% interest in 12 mineral • 100% interest in 200 tpd concessions operational processing plant • Historical production of over • Intention to Joint Venture 1 billion oz of Silver • Nueva Granada Concession – Old mine dumps returned 100-400g/t silver • Cristian Min

  21. Slide 21: Proven Leadership

    PROVEN LEADERSHIP BOARD OF DIRECTORS Frederick W. Davidson (CA) President, CEO & Director Held senior management positions with Erickson Gold Mines Ltd. and TOTAL Energold Corp. Part of the management team that took both the Erickson and Mt. Skukum Gold mines from discovery to production. Currently

  22. Slide 22: Profitability

    PROFITABILITY $18,000,000 $16,000,000 Revenue $14,000,000 Net Earnings $12,000,000 Operating Cash Flow ($CDN) $10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $- 2006 2007 2008 2009 2010 $(2,000,000) $(4,000,000) Year Capital Expenditure Use Efficiency Total funds raised since start Property

  23. Slide 23: Corporate Summary

    CORPORATE SUMMARY Marc 31st Dec 31st Dec 31st Dec 31st Year Ended ($CDN) 2011 2010 2009 2008 Revenue $7,258,085 $16,677,710 $12,176,115 $8,907,958 Net Earnings $2,473,889 $3,437,675 $1,159,661 $662,100 Cash Flow from Operations $2,699,190 $5,550,411 $4,366,322 $1,733,858 Cash & Cash Equivalents $19,

  24. Slide 24: Plans for 2011

    PLANS FOR 2011 • Ramp up Zacualpan production to 500 tpd with expanded production from Noche Buena Mine and San Ramon • Place Capire Mine into production initially on a 200 tpd pilot plant basis • Recent $15 million financing will allow accelerated growth through expanded exploration and potential a