  1. Slide 1: Designing for Wind in the Age of Mass Solar Tracker Deployment

    Designing for Wind in the Age of Mass Solar Tracker Deployment Presented By: 9/18/2018 Speakers: Alex Roedel, Director of Design & Engineering, NEXTracker Dr. David Banks, Principal, CPP Wind Engineering Consultants Jake Morin, Structural Engineer, Structurology LLC Moderator: Benjamin Gallagher, Se

  2. Slide 2: Today's Speakers

    Today’s Speakers Alex Roedel Dr. David Banks Jake Morin Benjamin Gallagher, Director of Design & Engineering, Principal, Structural Engineer, Senior Analyst, NEXTracker CPP Wind Engineering Consultants Structurology LLC GTM Research www.greentechmedia.com -2-

  3. Slide 3: Take 15 Percent Off GTM's Upcoming Events with Code WEBINAR

    Take 15 Percent Off GTM’s Upcoming Events with Code WEBINAR www.greentechmedia.com -3-

  4. Slide 4: Audience Console

    Audience Console Speaker Bios Submit Questions Download Slides/ Additional Resources www.greentechmedia.com -4-

  5. Slide 5: Utility PV Market Outlook, 2018-2023

    Utility PV Market Outlook, 2018-2023 U.S. Utility PV Installation Forecast, 2014-2023E • GTM’s 2018 - 2023Forecast has grown by 1.9 GWdc over last quarter due to the surge in 12,000 procurement of utility PV 10,807 Near Term: 2018 Remains Steady While Tariff Impacts Most Felt in 2019 • The 2018 fore

  6. Slide 6: Overall Pipeline: Growth Through Q2 2018

    Overall Pipeline: Growth Through Q2 2018 Current U.S. Utility PV Pipeline 40,000 35,000 U.S. Utility Capacity (MWdc) 30,000 25,000 23,948 4,276 20,000 36,154 33,734 15,000 10,000 19,671 5,000 0 Operating Contracted (PPA Signed) Announced (Pre-Contract) Source: U.S. Utility PV Market Tracker Designin

  7. Slide 7: Utility PV in Development by State as of Sept 2018

    Utility PV in Development by State as of Sept 2018 WA MW in Development ME MT ND OR MN VT NH MA n 0-20 ID SD WI NY CT WY NE IA MI PA NJ RI n 20-100 NV OH DE CA UT CO KS MO IL IN WV VA MD n 100-500 KY OK TN NC n > 500 AZ SC NM AR MS AL GA TX LA FL HI Designing for Wind in the Age of Mass Solar Tracke

  8. Slide 8: Region Breakdown

    Region Breakdown Rank (Contracted + 2018-2023 Forecast Region In Development Operating Operating) (MWdc) 1 Southeast 9,122 9,219 17,631 2 California 3,068 12,575 7,249 3 Southwest 3,268 6,733 6,179 4 Texas 1,922 1,798 4,852 5 Midwest 1,135 990 4,464 7 Northeast 1,251 1,023 2,901 6 Northwest 1,135 76

  9. Slide 9: Global Capacity Weighted Average Utility PV System Prices Land at $0.85/Wdc

    Global Capacity Weighted Average Utility PV System Prices Land at $0.85/Wdc Global Capacity Weighted Average, Japan, India and U.S. Utility PV System Pricing, 2015-2023E ($/Wdc) $3.00 $2.50 $2.61 $2.35 $2.00 $2.09 $1.93 $/Wdc $1.56 $1.73 $1.69 $1.50 $1.31 $1.65 $1.61 $1.57 $1.57 $1.11 $1.07 $0.97 $0

  10. Slide 10: US Utility PPA Prices Now Between 35.00 $/MWh – 21.00 $/MWh

    US Utility PPA Prices Now Between 35.00 $/MWh – 21.00 $/MWh A series of record low PPAs were announced in Q2 2018. While Austin Utility PV PPA Price by Contract Execution Date Highlights Q4-2017 – Q2-2018 Energy’s 21.00 $/MWh PPA in Q4 2017 is still believed to be the lowest, GTM has not yet confirm

  11. Slide 11: Different-Sized Projects Work in Different Regions

    Different-Sized Projects Work in Different Regions: Australia Will Be Dominated by Ultra- Large PV Projects Regional Utility-Scale PV Project Development Pipeline by Region (bars show no. of projects in development) Russia & the Caspian 20 1-5 MW 15 5-25 MW North America 25-100 MW 2000 Europe Asia 3

  12. Slide 12: Record low tariffs are being delivered for renewable energy awarded around the world

    Record low tariffs are being delivered for renewable energy awarded around the world Seven world record-low solar PV PPA prices since the start of 2016 250 200 150 US$/MWh 220.0 100 200.0 Global coal and gas levelized cost of energy range 50 110.0 91.2 59.0 53.0 52.0 50.0 47.1 38.0 36.8 29.9 29.0 24

  13. Slide 13: Solar is NOT Maintenance Free

    Solar is NOT Maintenance Free Designing for Wind in the Age of Mass Solar Tracker Deployment 13

  14. Slide 14: GTM

    GTM N ExTracker A Flex Company Propriecary

  15. Slide 15: Designing for Wind in Solar Tracker Deployment

    IN EXTrack DESIGNING EOR WIND IN SOLAR TRACKER-DEPLOYMEN |<< —— Dynamic Wind Afhalysis.and Protective"StomStrate (Co iT Greentech Media Webinar Series a SEPTEMBER 18, 2018 Copyright 2018 NI X Iracker. Proprictary and Confidentia ol

  16. Slide 16: Agenda

    AGENDA « Benjamin Gallagher, Senior Analyst, GTM « Alex Roedel, Director of Design & Engineering, NEXTracker e Dr. David Banks, Principal, CPP Wind Engineering Consultants e Jake Morin, Structural Engineer, Structurology LLC ° Q&A CERMAK NEXTracker Cpp PETERKA A Flex Company PETERSEN NEXTracker. A F

  17. Slide 17: NEXTracker

    Ne NEXTracker A Flex Company N ExTracker A Flex Company Scireaaeed

  18. Slide 18: NEXTracker, A Flex Company

    NEXTRACKER, A FLEX COMPANY ca yr flex An investment grade company Gj Mexico > 15 CW Ja % EMEA>15 tabs + $25B revenue * $13B balance sheet + > $400M free cash flow S, America > 1 GW ¥ Australia > 1.5 GW @ Offices @ Manufacturing: 175 MW/ week global capacity 14 GW trackers delivered globally 10 GW of

  19. Slide 19: NEXTracker Product & Services Ecosystem

    NEXTRACKER PRODUCT & SERVICES ECOSYSTEM SOLAR TRACKING SOLUTIONS ENERGY STORAGE SOLUTIONS | Best-in-class energy storage systems for any application. Can be paired with NX Horizon trackers and other existing generation assets, or used on TRUECAPTURE™ standalone basis. NX HORIZON™ NX FLOW™ NX DRIVE™

  20. Slide 20: Root Causes of PV Failure

    ROOT CAUSES OF PV. FAILURE ROOT CAUSES OF SOLAR PV CLAIMS Weather is the #1 source of PV insurance claims NORTH AMERICA 23% tgrinna 0.5% Theft z Climate change leading toa poise oy “am rise in extreme weather Source: GCube

  21. Slide 21: Recommended Wind Tunnel Testing

    PETERSEN RECOMMENDED WIND TUNNEL TESTING | cpp Fi Static Wind Tunnel Test Instability 4 Buffeting - Multirow Testing Dynamics Study Aeroelastic 1 Hz is not rigid N ExTracker A Flex Company ere aon

  22. Slide 22: Dynamic Wind Analysis: Instability at 0 Degrees

    PETERSEN DYNAMIC WIND ANALYSIS | cpp INSTABILITY AT O DEGREES N EXTracker. A Flex Company Promelecary anc ZanfdestW 7018

  23. Slide 23: Dynamic Wind Analysis: Stability at High Tilt Angles

    DYNAMIC WIND ANALYSIS STABILITY AT HIGH TILT ANGLES N ExTracker A Flex Company CERMAK PETERKA PETERSEN

  24. Slide 24: Torsional Galloping

    PETERSEN, TORSIONAL GALLOPING ae *Panels stowed near flat araiin test N ExTracker A Flex Company Propriesary and Cantidental $721

  25. Slide 25: Dynamic Wind Analysis: Stow at 0 Degrees - Torsional Galloping

    DYNAMIC WIND ANALYSIS | cpp Fi PETERSEN ! ei Sa CFD.Video. 3 STOW AT O DEGREES - TORSIONAL GALLOPING NEXTracker. A Flex Company ere

  26. Slide 26: Dynamic Wind Analysis: Stow at High Angles - Vortex Lock-in

    PETERSEN DYNAMIC WIND ANALYSIS ae x STOW AT HIGH ANGLES - VORTEX LOCK-IN N EXTracker. A Flex Company eee

  27. Slide 27: Cost of Down Time in Tracker Repair

    COST OF DOWN TIME IN TRACKER REPAIR Instabilities and failures can occur at low to 120 aoe moderate wind speeds 110 --—ws +/-95% limits (25mph - 6Omph) 100) Thunderstorms, 3-Second Gust, LOGAN-CACHE AIRPORT These wind events can occur several times a year to every few years depending on location Win

  28. Slide 28: Limitations of Code Based Designs

    LIMITATIONS OF CODE BASED DESIGNS ASCE 7: “Wind tunnel method may always be used for determining wind pressures for any structure. This method is considered to produce the most accurate wind pressures of any method specified in this standard.” Mono-slope roof coefficient grossly oversimplifies a PV

  29. Slide 29: Static Wind Tunnel Testing Results

    STATIC WIND TUNNEL TESTING RESULTS CPP [ieee A Flex Company

  30. Slide 30: Buffeting Dynamics

    BUFFETING DYNAMICS cpp faa N EXTracker A Flex Company

  31. Slide 31: Importance of Dampers

    STRUCTUROLOGY| IMPORTANCE OF DAMPERS Dampers reduce oscillations Dynamic Amplification Factor (DAF) can be determined via finite element analysis Must be verified by 2 7-35 1 05 0 05 1 field testing cp damn ay bape oeneney A Flex Company Propriecary ancl fenfide wal $7218 18

  32. Slide 32: Tracker Architecture

    TRACKER ARCHITECTURE STRUCTUROLOGY + Chord length is East/West exposure to wind - Chord length has a squared effect on torque + 2P trackers experience 400% load increase N ExTracker A Flex Company

  33. Slide 33: Fasteners & Module Types

    FASTENERS & MODULE TYPES Key wind-mitigation component: tension fasteners Portrait frameless modules on a tracker risks improve reliability by not loosening over time. slippage and breakage over time. Wn YATE AUATUTUTUIT TTT TAT WaT TTT TT HTT | PAT | PTT PMT AUIAAGNTAC HUNAN UUAGRUATAHAVET TAT WW T

  34. Slide 34: Forging the Standard

    FORGING THE STANDARD > NEXTracker along with CPP has changed the industry with respect to dynamic ; yy analysis & wind stow / EE strategies | | J | J W - NEXTracker has sustained hurricanes Matthew, Harvey, Maria, Irma, Florence and others without failures NEXTracker. A Flex Company

  35. Slide 35: Value of Reliability and Quality Design

    VALUE OF RELIABILITY AND QUALITY DESIGN - Levelized Cost of Energy (LCOE) need to take into account O&M costs and downtime due to tracker failures » Owners and EPCs need to require proper wind tunnel testing and dynamic analysis 4 sina” Py HM Hint SG 4 Actual site with NX Horizon post-Hurricane Matt

  36. Slide 36: Sand and Flood Clearance

    SAND AND FLOOD CLEARANCE NEXTracker Design All NX components sealed and positioned well above grade to avoid contact with water and sand NEXTracker. A Flex Company Extreme Weather Events Actual NEXTracker site enduring harsh flood. Along with hurricanes, floods can be extremely damaging to sites

  37. Slide 37: DNV-GL Bankability Study

    DNV-GL BANKABILITY STUDY - The Industry needs to mature in effort to ensure the quality and reliability of solar trackers DNV GL WHITE PAPER - DNV has recently released a white paper outlining best practices for the Independent Engineers (IE) community for performing unbiased technology evaluations

  38. Slide 38: Importance of Peer Review

    IMPORTANCE OF PEER REVIEW Buffeting STRUCTUROLOGY|] Static Wind : Instability - Tunnel Test oiakeTealies Multirow Testing Study y PEER REVIEW N ExTracker A Flex Company

  39. Slide 39: NEXTracker Surviving Wind Event

    NEXTRACKER SURVIVING WIND EVENT NEXTracker. A Flex Company

  40. Slide 40: NEXTracker

    NEXtTracker AFi x Company re sa an sigh TALE CT ULE HEU EOE CECE LILA ALTA TTA AL TE TTT UT MTN Tage LAT PTAA Gs TMT OTA OCT ATTA COE TTT MTT {iT Errnvaguenannnggguoreanunyuceuuati TMM MATTEO TOASSEUUERURRLEELALIN TS HMI UTAMTITLLATIT i am TTT * TATE LCATOUTGLLTTLLATTT i TET ECCT, Tg ATT CCT NT TTTI

NEXTracker — Technical Presentation (September 2018) on 6ix