Fortune Minerals Limited · TSX:FT
Fortune Minerals — Investor Presentation (May 2013)
52 slides from Fortune Minerals's investor presentation, May 2013
Slide 1: Emerging Metallurgical Coal, Gold & Specialty Metals Producer
Emerging Metallurgical Coal, Gold & Specialty Metals Producer Fortune Minerals Limited Investor Presentation TSX-FT, OTC QX-FTMDF May 2013
Slide 2: Forward-Looking Information
Forward-Looking Information This document contains certain forward-looking information. This forward-looking information includes, or may be based upon, estimates, forecasts, and statements as to management’s expectations with respect to, among other things, the size and quality of the Company’s min
Slide 3: Financial Summary
Financial Summary Corporate Information Share Performance $0.80 1,400 Listings: TSX (Canada): FT Daily Volume $0.70 Closing Price 1,200 OTC QX (USA): FTMDF $0.60 Share Price (C$) 1,000 Share Volume (M) Share Price $0.37 $0.50 800 Shares Out – Basic 121.3 $0.40 Shares Out – Fully Diluted 128.7 600 $0
Slide 4: Fortune Minerals Limited
Fortune Minerals Limited Fortune Minerals Limited Canadian mineral development company Headquartered in London, Ontario, Canada Canada Focus - operating in mining friendly jurisdictions Two late-stage projects Arctos Anthracite Project, BC (formerly Mount Klappan Anthracite Coal Project):
Slide 5: Introduction to Arctos Anthracite Project
Introduction to Arctos Anthracite Project (formerly the Mount Klappan Anthracite Metallurgical Coal Project) Summary Highlights One of the world’s premier metallurgical coal development projects Advanced project with $100 million of work completed Updated Feasibility Study with robust economic
Slide 6: Anthracite: Highest Quality Coal
Anthracite: Highest Quality Coal Arctos is the largest & most advanced Canadian project of high rank anthracite coal Highest quality metallurgical coal with very high carbon & energy content Represents only 1% of world coal reserves Metallurgical coal with diverse applications Metallurgical Re
Slide 7: Significant Future Metallurgical Coal Demand Growth
Significant Future Metallurgical Coal Demand Growth Insufficient supply of metallurgical Global Met Coal Demand coals to meet forecast global demand 1,600 >500 million mt demand Increasing demand for anthracite increase over the next decade 1,440 due to new steel technologies & with limited new pr
Slide 8: Growing Demand in Steel Industry
Growing Demand in Steel Industry Use of Pulverized Coal Injection (PCI) reduces the amount of coke required in steel production ~1/3 of the world’s blast furnaces use PCI Steelmakers around the world are expanding PCI use to reduce costs Low-vol PCI typically priced at 70% to 80% of high qua
Slide 9: Emergence of China as Net Coal Importer
Emergence of China as Net Coal Importer China became a net coal importer of anthracite in 2004, coking coal in 2007, all coals in 2009 Coal & Anthracite Net Imports by China 450 $350 Coal Net Imports (Mt) $300 Anthracite Net Imports (Mt) $291 $300 350 Hard Coking Coal Price (US$/t) $250 $215 $209 Ha
Slide 10: Decreasing Supply of Anthracite
Decreasing Supply of Anthracite Supply constraints due to declining exports & lack of new supply China: 547 million tonnes – net importer since 2004 Vietnam: 44.5 million tonnes – reducing exports to 5% of production by 2015 to utilize production domestically Few new high-quality deposits in m
Slide 11: Strategic Location & Infrastructure
Strategic Location & Infrastructure 16,411 Ha license area in northwest BC Close proximity to deep water shipping ports Stewart Port (150 km) Ridley Terminals in Prince Rupert (330 km) Mine site straddles railway right-of-way Track (CN) installed to 150 km south of mine Railway road be
Slide 12: Joint Venture with POSCO
Joint Venture with POSCO Secured world-class investor & strategic partner – one of the world’s largest steel producers POSCO Canada has acquired 20% interest in Arctos for anticipated initial payments & cash contributions of $188 million based on current capital cost estimates $30 million paid t
Slide 13: Resources & Reserves
Resources & Reserves Recent upgrade & increase in resources & new reserves (October 15, 2012) – Small fraction of total resource Lost Fox deposit remains open for possible expansion & additional coal seams identified below 350 meters & on adjacent lands Historical Resources include 2.2 billion
Slide 14: Railway Partially Constructed
Railway Partially Constructed Railway transportation allows for scalable expansion of production to take advantage of large resource base CN Rail operates between Prince George & Port of Prince Rupert & on Dease Lake Line to Minaret, 150 km south of Arctos Railway road bed largely constructed
Slide 15: Rail Update – Moving Forward
Rail Update – Moving Forward Canadian & BC Government engaged at very high levels Premier, Ministers & senior staff in BC Government COO of Transportation & Executive VP level at CN Collaborating with CN Rail for railway extension to site Negotiating optimal land tenure arrangement with th
Slide 16: Port with Capesize Capacity
Port with Capesize Capacity Ridley Coal Terminal a world-class coal & bulk materials handling facility Ice-free, deep water port 30 hours closer to Asia than Port of Vancouver Capable of handling full Capesize vessels up to 250,000 dwt that reduces ocean freight 16 Mtpa design capacity Expan
Slide 17: Positive Feasibility Study
Positive Feasibility Study October 2012 update to 2005 & 2010 FS Based on railway transport of coal to Ridley Coal Terminal in Prince Rupert Initial 3 Mtpa production from Lost Fox deposit open pit mine, wash plant & site infrastructure 69.2 Mt of product coal reserves – 25+ years production
Slide 18: Permitting Update – Work Underway
Permitting Update – Work Underway Arctos project identified on BC Government Major Investment Office List Project Description Report completed & submitted to EA agencies Gaps Analysis & Work Plan completed Baseline Field Work Additional field work for mine area & road access corridor in pr
Slide 19: Aboriginal Update
Aboriginal Update Tahltan Nation Gitxsan Nation Agreements to Date Proposed new railway passes through 5 Environmental Assessment Process Gitxsan house territories Funding MOU completed with Gitxsan Hereditary Traditional Knowledge Agreement Chiefs Confidentiality Agreement – PEM Data
Slide 20: Government Update – Overview
Government Update – Overview What’s new: Federal & BC Government recognition that permitting process needs to be streamlined Federal & BC Government harmonization of EA process A re-energized approach to mine development BC Government focused on Premier Clark’s BC Jobs Plan Premier commi
Slide 21: Significant Upside Potential
Significant Upside Potential One of world’s largest undeveloped deposits – railway transportation solution provides scalable expansion potential Rail transportation allows for higher annual production than 3 Mtpa & will lower some cost for inbound freight FS reserves only represents small fracti
Slide 22: Development Strategy
Development Strategy Development program underway Next steps include: Continue Tahltan, Gitxsan & stakeholder engagement Environmental, socio-cultural & economic studies underway in support of permitting process Project Description has been submitted to CEAA, BCEAO & Aboriginal groups Co
Slide 23: Targeted Milestones
Targeted Milestones Proposed Development Timeline 2013 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Project Description submission Baseline field work & document prep Filing of EIS-EAC documents EAO-CEAA review process Ministerial decision process Mine permitting Construction Commi
Slide 24: NICO Gold-Cobalt-Bismuth-Copper Project Highlights
NICO Gold-Cobalt-Bismuth-Copper Project Highlights Positive Front End Engineering & Design Study (FEED) completed in 2012 based on a vertically integrated mine & mill in the Northwest Territories & refinery in Saskatchewan FEED - ~30% of detailed engineering complete for procurement Robust eco
Slide 25: Gold: Counter Cyclical Hedge
Gold: Counter Cyclical Hedge Historical & Forecast Gold Price Gold price increased consistently in the past $2,000 decade, especially after recent economic $1,794 downturn $1,800 $1,669 While mine supply remains relatively flat, future $1,574 $1,600 demand continues to grow: $1,400 Growing phy
Slide 26: Cobalt: Robust & Diverse Market
Cobalt: Robust & Diverse Market Wide chemical and metallurgical market Wide Application of Industrial Usage applications in batteries, high strength alloys, cutting tools, catalysts, etc. Cobalt sulphate is used in lithium ion & nickel 5% 4% Batteries (27%) metal hydride batteries for electronic
Slide 27: Cobalt: Rechargeable Batteries Drive Demand
Cobalt: Rechargeable Batteries Drive Demand Cobalt is critical for manufacturing batteries used in electric vehicles*, computers, cell phones & other electronic devices Nickel metal hydride car batteries contain approximately 3 to 5 lbs of cobalt Lithium-ion car batteries contain 2 to 5 kg of
Slide 28: Cobalt: Shortage of Reliable Supply
Cobalt: Shortage of Reliable Supply World market of refined cobalt production ~82,000t, excluding some secondary processing & scrap Vast majority of cobalt sourced from regions that are politically unstable or prone to export restrictions Congo (DRC) currently accounts for 51% of global supply
Slide 29: Bismuth: Environmentally Friendly
Bismuth: Environmentally Friendly Traditionally used in fusible alloys, cosmetics, chemicals etc. New markets focus on super conductors, CDs & auto anti-corrosion materials Environmentally safe replacement for lead in plumbing & electronic solders, brass, ceramic glazes, free cutting steel, ho
Slide 30: Bismuth: Limited Supply
Bismuth: Limited Supply World market between 15,000 & 20,000 t per year China is the principal source of bismuth (240 Kt reserve), accounting for 80% of world reserves & 73% of world production in 2010 China has closed 20% of its production due to environmental concerns & China’s exports could
Slide 31: Introduction to NICO Project & SMPP
Introduction to NICO Project & SMPP NICO Project Large scale gold-cobalt-bismuth deposit 160 km from City of Yellowknife 450 km from railway at Hay River High concentration ratio using simple flotation – 4,650 t of ore / day reduced to 180 t of concentrate Allows shipping to Saskatchewan f
Slide 32: Mine Location & Infrastructure
Mine Location & Infrastructure 5,140 Ha lease in southern NWT Winter access roads All-weather road planned by governments to highway (135 km) $1.5 million in place for baseline environmental survey Engineering & environmental work underway 450 km from railway at Hay River for transport o
Slide 33: Saskatchewan Metals Processing Plant
Saskatchewan Metals Processing Plant Hydrometallurgical plant to process bulk concentrate from NICO mine & mill to produce gold doré, cobalt sulphate or cathode, bismuth ingot & copper metal Lands near Saskatoon purchased: Located on CN Rail line Close to Trans Canada Hwy Inexpensive power
Slide 34: NICO Mineral Reserves
NICO Mineral Reserves Underground Mineral Reserves Tonnes Au (g/t) Co (%) Bi (%) Cu (%) Proven 282,000 4.93 0.14 0.27 0.03 Probable 94,000 5.6 0.11 0.19 0.01 Total 376,000 5.09 0.13 0.25 0.02 Open Pit Mineral Reserves Tonnes Au (g/t) Co (%) Bi (%) Cu (%) Proven 20,513,000 0.94 0.11 0.15 0.04 Probabl
Slide 35: Well-Understood Geology
Well-Understood Geology The NICO mineral reserves are based on 327 drill holes & surface trenches Deposit is an Iron Oxide Copper Gold (“IOCG”) class deposit, commonly referred to as Olympic Dam-type after the dominant “Super Giant” deposit in South Australia Ore is hosted in three lenses of bre
Slide 36: Underground Test Mining Complete
Underground Test Mining Complete Mining conditions, geometry & grades confirmed Environmental impacts assessed Portal, 2 km of decline ramp & 2 mine levels established with ventilation raise to surface ~$20 million pre-production development completed Large sample collected for pilot plant
Slide 37: Extensive Metallurgy Work
Extensive Metallurgy Work 1997-2012 Metallurgical expenditures ~$12 M Lab & bench scale test work 2007 200 t bulk sample pilot plant study Proved process flow sheet Established baseline process performance & products Improved recoveries over feasibility study Provided samples for envir
Slide 38: Positive Pilot Plant Results
Positive Pilot Plant Results Continuous flotation tests to produce separate cobalt & bismuth concentrates Recovery improvements to Co, Bi, Au & Cu Proved process flow sheet, production of high value products & improved metal recoveries Cobalt pressure oxidation, precipitation & electrowinnin
Slide 39: 2012 FEED Study
2012 FEED Study Positive FEED Study demonstrating very FEED Study Highlights – Base Case, Cobalt Sulphate low costs & strong economics Mine type Open pit with underground in 2nd year Vertically integrated project consisting of open pit & underground mine, mill & Open pit: conventional truck & load
Slide 40: Balanced Production Scenario
Balanced Production Scenario NICO will be a reliable Canadian-based producer of strategic metals: Gold doré, 99.8% cobalt cathode &/or 20.9% cobalt sulphate, 99.99% bismuth ingot, & a copper metal precipitate 100 Average Annual Revenue by Metal – Base Case (gold) & Recent Price (grey) $89 90 80 $6
Slide 41: Negative Cash Costs
Negative Cash Costs NICO has negative operating costs for all metals net of by-product credits Demonstrates that after capital has been repaid, operations can be sustained during periods of low metal prices & volatility Cobalt Gold Bismuth Base Case Current Price Base Case Current Price Base Case
Slide 42: Low Capital Costs
Low Capital Costs Capital costs total $441 million for the first 2 years of the project, including all direct & indirect costs & contingencies Summary of Capital Costs $500 $450 SMPP Site Capital Costs $400 Refinery $350 230 Rail load out Capital Costs (C$M) $300 Ponds $250 $200 NICO Site Capi
Slide 43: Economics – Highly Leveraged to Gold
Economics – Highly Leveraged to Gold NICO demonstrates robust economics through a range of commodity prices Economics for Cobalt Sulphate Option $1,000 $951 $900 NPV (7% discount) $800 NPV (5% discount) $707 $700 $660 $600 C$M $500 $466 $467 $400 $309 $300 $270 $228 $200 $147 $110 $100 $0 Base Case
Slide 44: Additional Upside
Additional Upside Significant opportunity existing to further strengthen project economics Extend mine life for 3+ years with stockpiled subeconomic material Alternative power supply to mine to lower costs Move forward gold production via additional underground mining to access high grade mate
Slide 45: Production Targeted in 2015
Production Targeted in 2015 Progressing through final stages of permitting process Environmental Assessments well advanced for mine & SMPP permitting Mackenzie Valley Review Board recommended approval of mine & mill Jan. 25, 2013 – Pending approval of Minister & Tlicho Government For SMPP, add
Slide 46: Production Targeted in 2015
Production Targeted in 2015 Proposed Development Timeline 2012 2013 2014 2015 2016 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 SMPP EA SMPP fully permitted NICO environmental review NICO Minister’s approval NICO fully permitted Financing Engineering & procurement Construction Commissioning Commerci
Slide 47: Emerging Metallurgical Coal, Gold & Specialty Metals Producer
Emerging Metallurgical Coal, Gold & Specialty Metals Producer Two advanced Canadian development assets One of the world’s premier metallurgical coal developments, 1.1 million ozs. gold, 82 million lbs. cobalt & 15% of global bismuth reserves $200 million combined expenditures Positive Feasib
Slide 48: Experienced Team
Experienced Team Directors Mahendra Naik, B Comm, CA Chairman, Director CFO Fundeco - Founding director & former CFO, IAMGOLD George Doumet, MSc, MBA Honorary Chairman, Director Chemical Engineer – President & CEO, Federal White Cement Robin Goad, MSc, PGeo President & CEO, Director Geologist - 30 y
Slide 49: Appendix: Economics & Price Assumptions
Appendix: Economics & Price Assumptions Cobalt Metal Option Cobalt Sulphate Option Pre-Tax After Tax Pre-Tax After Tax Metal Price & $M $M $M $M $M $M $M Exchange Rate Case IRR $M IRR IRR IRR NPV NPV NPV NPV NPV NPV NPV % NPV (5%) % % % (7%) (7%) (5%) (7%) (5%) (7%) (5%) Base Case Prices 10.8 164.5
Slide 50: Notes
Notes SO FORTUNE 1%) MINERALS LIMITED Wh 49
Slide 51: Notes
Notes SO FORTUNE 1%) MINERALS LIMITED Wh 50
Slide 52: Emerging Strategic Metal & Coal Producer
Emerging Strategic For further information, please contact: Metal & Coal Troy Nazarewicz, Investor Relations Manager Producer 148 Fullarton Street, Suite 1600 London, Ontario, Canada N6A 5P3 Tel. (519) 858-8188 Fax. (519) 858-8155 E-mail. tnazarewicz @fortuneminerals.com Website. www.fortuneminerals