Roxgold Inc

Roxgold — Investor Presentation (October 2017)

38 slides from Roxgold's investor presentation, October 2017

  1. Slide 1: Mining High Grade Gold in Burkina Faso

    Mining High Grade Gold in Burkina Faso TSX: ROXG Investor Presentation | October 2017 TSX: ROXG 1

  2. Slide 2: Cautionary Statement

    Cautionary Statement This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of measured, inferred and indicated mineral resources and proven and probable minera

  3. Slide 3: Roxgold – Compelling Investment in the Gold Sector

    Roxgold – Compelling Investment in the Gold Sector Canadian Based – Best in Class West African Gold Miner High-Grade, Low-Cost Underground Gold Producer with Near-Term Expansion Potential ▪ High-grade at 17.1 grams per tonne1 compared to Mauritania Mali average grade of gold mines in Burkina Faso at

  4. Slide 4: Roxgold – Why Invest?

    Roxgold – Why Invest? Operations Expansion Team Growth ▪ Commercial production ▪ ~35% grade increase at ▪ Operational Proficiency ▪ Additional new targets declared in Oct 2016 Bagassi South1 identified in 2017 ▪ Over 3,000,000 hours ▪ Produced ~141,000 oz ▪ Bagassi South Feasibility Lost Time Injury

  5. Slide 5: Operations

    Operations 5

  6. Slide 6: 55 Zone – Currently in Production

    55 Zone – Currently in Production ▪ Measured & Indicated Resources1 at 738,000 oz at 17.1 grams per tonne (“g/t”) Au at 5.0 g/t cut-off ▪ 115,000 – 125,000 ounces production guidance in 2017 ▪ Well on track with ~92,000 oz produced as of Q3 2017 ▪ AISC2 guidance of $740 - $790 per ounce for 2017 ▪ D

  7. Slide 7: Increased 2017 Production Guidance and Tracking to Cost Estimates

    Increased 2017 Production Guidance and Tracking to Cost Estimates (oz Au) ▪ Guidance maintained for full year for Cash Operating Cost1 and AISC1 ▪ Significant investment in underground 125,000 development 115,000 115,000 105,000 Cash Operating Cost All-in Sustaining Cost Guidance Range Guidance Rang

  8. Slide 8: Key Financial & Operational Highlights

    Key Financial & Operational Highlights First Half Fiscal 2017 Financial Highlights – H1 2017 Operational Highlights – H1 2017 Cash flow from operations ~42M 99% recovery rate 63,564 oz produced or $0.11/share Cash on hand ~50M 15.4 g/t >3M hrs Reduction in LT debt ~28% head grade Lost Time Injury fr

  9. Slide 9: 55 Zone Developed Reserves

    55 Zone Developed Reserves1 L 5270 L 5219 L 5168 $44 $740 $790 $445 $490 $740 $790 L 5117 L 5066 Block Remain % Devt Developed 2017 H2 2018 2019 Total 1 53,000 100% 53,000 29,200 22,100 1,700 53,000 2 74,000 100% 74,000 20,500 28,500 25,000 74,000 1. See press release dated April 18, 2017 for more i

  10. Slide 10: Expansion

    0 OATES LO SY EES LOBE A. 5 .}© Expansion

  11. Slide 11: Bagassi South – Project Summary

    Bagassi South – Project Summary Yaramoko ▪ Roxgold’s first growth project Water Storage Dam ▪ 1.8km south of 55 Zone and processing plant ▪ Indicated resource of 188,000 oz at 16.6 g/t Au ▪ Inferred resource of 69,000 oz at 16.6 g/t Au Tailing Plant Camp Storage Facility ▪ Expansion forecasted to de

  12. Slide 12: Bagassi South – QV1 & QV' Deposits

    Bagassi South – QV1 & QV’ Deposits Q2 2017 ✓ Infill Drilling Program Complete ✓ Hydrology & Geotechnical Studies ✓ Commence Permitting in Burkina Faso Pre-production Capital ✓ Commence Camp Expansion Mine Development 8.1M Q3 2017 ✓ Resource Update ✓ Mine Planning/Optimization Mine Equipment 0.5M 201

  13. Slide 13: Potential Production Outlook

    Potential Production Outlook1 55 Zone Reserves 150 100 50 0 2017 2018 2019 2020 2021 2022 2023 55 Zone Potential Plant Feed 100 50 0 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Bagassi South Potential Plant Feed 75 50 25 0 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 TSX: ROXG 1

  14. Slide 14: Growth

    <= a Ss Oo hn U)

  15. Slide 15: 55 Zone Planned Drilling Q2/Q3 2017

    Zone 55 Planned Drilling Q2/Q3 2017 55 Zone Resource* Size Grade 5,200RL Measured & 738k 17.1 g/t Indicated ounces 347k 5,000RL Inferred 16.1 g/t ounces *As of December 31st, 2016 YRM-16-DD-426 4,800RL 20.1 g/t over 23.8 m YRM-12-DD-242 55 Zone Deep Drilling program: 22.7 g/t over 4.1 m ▪ 11,000 met

  16. Slide 16: Bagassi South – QV' Potential Additional Upside

    Bagassi South – QV’ Potential Additional Upside Inferred Resource of 36,000 oz at 22.0 g/t Au West East Bagassi South drilling program: 5,200RL ▪ 10,000 meters along the QV’ YRM-17-DD-BGS-184 290.0 g/t over 0.8 m structure ▪ Commenced in Q3 5,100RL YRM-17-DD-BGS-181 ▪ Continuing into Q4 55.8 g/t ove

  17. Slide 17: Regional Geological Overview

    Regional Geological Overview Siou 10 Km Niankongo ▪ Large regional land package Boni Shear North of approximately 230 km2, Yaramoko located on the Hounde Belt Boni Shear Central ▪ Majority of known anomalies Yaro and deposits are located 300 Zone along the Boni Shear regional Haho break and the seco

  18. Slide 18: Yaramoko – Ground Geophysical Surveys 2017

    Yaramoko – Ground Geophysical Surveys 2017 ▪ The 2017 ground geophysical program included 4 individual grids: Two IP surveys: ▪ Boni Shear IP grid ▪ Houko IP grid Boni Grid Two Pole-Dipole surveys: ▪ Bagassi PD grid Haho ▪ Haho PD grid Grid ▪ Drilling program of 4,500m completed along Bagassi Corrid

  19. Slide 19: Yaramoko – Ground Geophysical IP Compilation

    Yaramoko – Ground Geophysical IP Compilation ▪ The ground IP Compilation includes the two 2017 IP grids of Boni Shear and Houko along with the 2014 IP survey ▪ Several areas of regional disruption of Boni Shear structural fabric Anomalies ▪ Defined new targets in the footwall of 55 Boni Zone ▪ Poten

  20. Slide 20: Yaramoko – Boni Shear IP Surveys 2017

    Yaramoko – Boni Shear IP Surveys 2017 Niankongo ▪ Larger tonnage shear hosted targets ▪ More traditional deposit targets in Boni Shear Niankongo East West African greenstones Boni Central ▪ The Boni Shear Survey redefined the Boni Shear Central, Contact and Niankongo anomalies Boni Shear ▪ Addition

  21. Slide 21: Upcoming Catalysts – Q4 2017

    Upcoming Catalysts – Q4 2017 ▪ Results of Bagassi South Feasibility Study ▪ Results of 55 Zone deep drilling program. Follow up drilling program of 10,000 meter below drill holes YRM- 16DD-426 & 428 commenced in Q2 ▪ Commencement of 10,000 meter regional program on Boni Shear and other regional targ

  22. Slide 22: Roxgold – Compelling Investment in the Gold Sector

    Roxgold – Compelling Investment in the Gold Sector Canadian Based – Best in Class West African Gold Miner ▪ High-Grade, Low-Cost Underground Gold Producer with Near-Term Expansion Potential ▪ Strong cash flow generation from 55 Zone ▪ Expansion plan in place at Bagassi South ▪ Bagassi South Feasibil

  23. Slide 23: Appendix

    Appendix TSX: ROXG 23

  24. Slide 24: Management Team

    Management Team John Dorward Paul Criddle Natacha Garoute President & CEO COO CFO 20 years 18+ years 20 years development & operating operating & project mining finance mines experience development experience experience Former Roles: Former Roles: Former Roles: ▪ VP Business Dev. of ▪ COO Azimuth ▪

  25. Slide 25: Finance Summary

    Finance Summary Insiders Yaramoko Debt Facility & Mgmt Retail 5.1% 6.2% 18.1% ▪ Debt Facility of $60 Million 6.5% ▪ Interest rate of LIBOR plus 3.75% ▪ Hedging component of 65,000 ounces of gold over the 5 year life of the loan @US$ 1,052/oz 7.9% ▪ Project remains unencumbered by third party streams

  26. Slide 26: 2017 Second Quarter Financial Highlights

    2017 Second Quarter Financial Highlights 2017 First Half Q2 2017 Average realized gold price $1,254/oz Cash operating cost1 Cash balance Cash operating cost1 $498/oz $445/oz produced (unaudited) at All-In Sustaining Cost1 June 30, 2017 Cash operating cost1 $214/t ~US$50 M $789/oz sold Total cash cos

  27. Slide 27: Financial information

    Financial information All dollar amounts in 000s except per share amounts and where otherwise noted 2017 2017 Q1 Q2 12 Month Financial Position Gold Poured (ounces) 35,594 27,970 Gold Sold (ounces)1 34,979 28,788 Average realized gold price (per oz) $1,229 $1,254 LTD reduced by ~28% since Q4 2016 Re

  28. Slide 28: People at Yaramoko

    People at Yaramoko Head Grade Training and localisation has proven to be Yaramoko Employee Origin effective at Yaramoko: Distribution (March 2017) ▪ 87% Burkinabe employment 13% ▪ 50% of employees from the immediate area ▪ Tangible growth and benefit to the host community 50% 37% Local/Local Non Loc

  29. Slide 29: 2017 Social Programs

    2017 Social Programs Community investment projects ▪ 30 projects submitted by groups from the community including seven projects for Women and eight projects for the benefit of Youth: creation of a community training center in Bagassi, improvement of the Bagassi potable water system, solar electrifi

  30. Slide 30: Corporate Information

    Corporate Information Covering Sell-Side Firm Analyst Capital Structure (as at June 30, 2017) BMO Andrew Breichmanas TSX: ROXG Canaccord Rahul Paul Listings OTC: ROGFF Cormark Tyron Breytenbach Cash ~US$50 million Echelon Wealth Partners Ryan Walker Common Shares Outstanding 371.4M GMP Oliver Turner

  31. Slide 31: Mineral Reserve and Mineral Resource Statement – 55 Zone

    Mineral Reserve and Mineral Resource Statement – 55 Zone* As of December 31, 2016 Reserve grade largely maintained compared to BFS grade despite mined grade over the course of 2016 of 15.5 g/t. Proven Probable Proven and Probable Mineral Reserves Mineral Reserves Mineral Reserves Tonnes Grade Ounces

  32. Slide 32: Mineral Resource Statement - Bagassi South

    Mineral Resource Statement - Bagassi South* As of July 19, 2017 Measured Indicated Measured and Indicated Inferred Mineral Resources Mineral Resources Mineral Resources Mineral Resources Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (000) g/t Au (000) (000) g/t Au (

  33. Slide 33: 55 Zone Life of Mine Design

    55 Zone Life of Mine Design LOM Plan April 2017 Mined Out 2016 ▪ Resource model Mar 5168 L 2017 5066 DD Drive ▪ Proven & Probable DD Drives & Vent Intakes DD Drives & Vent Intakes reserve updated to 4556L (760m) Single Decline, SingleExhaust Decline, Raise & Escape Ladderway ▪ Inferred material to E

  34. Slide 34: 2016 Financial Performance

    2016 Financial Performance Pre-commercial Commercial production Four production Three TOTAL months ended months ended seven months September 30, December 31, ended December 20161 2016 31, 2016 Operating Data Ore mined (tonnes) 61,040 72,561 133,601 Ore processed (tonnes) 82,590 61,265 143,855 Head g

  35. Slide 35: Mineral Resource, Reserve and Potential Plant Feed Notes

    Mineral Resource Notes: (1) Mineral Resources are reported compliance with National Instrument 43-101 (“NI 43-101”) with an effective date of December 31st, 2016. (2) Underground Mineral Resources are reported at gold grade cut-off of 5.0 g/t Au, based on a gold price of US$1,250/ounce. (3) The iden

  36. Slide 36: Bagassi South Mineral Resource Estimate Notes

    Bagassi South Mineral Resource Estimate Notes: Notes: (1) Bagassi South Mineral Resources are reported in compliance with NI 43-101 with an effective date of July 19th, 2017. (2) Underground Mineral Resources are reported at gold grade cut-off of 5.0 g/t Au, based on a gold price of US$1,250/ounce o

  37. Slide 37: Notes

    Notes: 1. Cash operating cost per ounce produced, total cash cost per ounce sold and all-in sustaining cost per ounce sold are non-IFRS measures with no standard definition under IFRS. See Note 16 the “Non-IFRS financial performance measures” of the Company’s Management Discussion and Analysis (“MD&

  38. Slide 38: Investor Relations Contact

    Kelley Stamm Manager, Investor Relations & Communications 360 Bay Street, Suite 500 Toronto, ON M5H 2V6 kstamm@roxgold.com www.roxgold.com 416 203 6401 TSX: ROXG 38