Bhp Group Ltd · ASX:BHP

Bhp — BHP Billiton — Corporate Update (June 2005)

58 slides from Bhp's corporate update, Jun 4, 2005

  1. Slide 1: Analyst Visit 4 June 2005 – QNI Pty Ltd

    Analyst Visit 4 June 2005 QNI Pty Ltd

  2. Slide 2: Disclaimer

    Disclaimer The views expressed herein contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward-looking information in this presentation

  3. Slide 3: QNI has most requisite factors for world competitive nickel and cobalt processing

    QNI has most of requisite factors for world competitive sustainable nickel and cobalt processing • Abundant water – WRF • Power largely self-generated by co-generation • Reasonably priced gas and coal • Skilled workforce • Well established safety and production systems • Well established sophisticat

  4. Slide 4: The QNI strategy

    The QNI strategy Central Refinery Strategy Optimise Yabulu margins • Phase I: Stabilise Yabulu operation • Incremental value-added product Develop Ravensthorpe as development. “front end” and expand • Zero harm • Plant efficiency projects Yabulu. • Business re-engineering • Gas conversion • Phase II

  5. Slide 5: Sources of ore supply to Yabulu Refinery

    Sources of ore supply to Yabulu Refinery PHILIPPINES Manila Cagdianao Hinatuan Taganito Rio Tuba ACT Project Tanj ung Buli Gebe Pomalaa INDONESIA NEW CALEDONIA Baie Ugue Poro Poum Kouaoua Karembe Boakaine Nakety Yabulu Teoudie Thio Vulcain AU S TR ALI A Noumea Brisbane Ravensthorpe Page 5

  6. Slide 6: Mine site location and rainfall patterns

    Mine site location and rainfall patterns Isabela Rainfall (Ca sigura n Station) 600.0 400.0 200.0 PGMC South Isabela - J F M A M J J A S O N D China Sea Zambales 15 Manila Bicol Pacific Ocean 450.0 M anican i Rain fall 400.0 350.0 300.0 Samar 250.0 200.0 150.0 100.0 Manicani 50.0 Palawan Cebu CM C -

  7. Slide 7: Identified ore sources vs actual offtake

    Identified ore sources vs actual offtake 4750 4500 Wet Tonnes '000 4250 4000 3750 3500 3250 3000 FY01 FY02 FY03 FY04 FY05 Actual Possible Source: BHP Billiton Page 7

  8. Slide 8: Ship loading by barge

    Ship loading by barge oe! ef Page 8 bhptbilliton

  9. Slide 9: Ore discharge at Materials Handling Facility

    Ore discharge at Materials Handling Facility Approximately 3.7 million tonnes of Nickel Ore is unloaded and transported to Yabulu Refinery every calendar year. Page 9

  10. Slide 10: The QNI strategy

    The QNI strategy Central Refinery Strategy Optimise Yabulu margins • Phase I: Stabilise Yabulu operation Develop Ravensthorpe as • Incremental value-added product “front end” and expand development. Yabulu. • Zero harm • Plant efficiency projects • Phase II: • Business re-engineering • Gas conversio

  11. Slide 11: ACT Project Location

    ACT Project Location 100kms Manila Cebu Surigao City ACT Project Caraga Region Zamboanga City Davao City Page 11

  12. Slide 12: ACT Project: significant parameters

    ACT Project: significant parameters • Mineable reserves: min 12MWt • Minelife: 12 years, minimum • Production: 1MWt/y • Method: Surface mining w/ progressive rehab • Sustainability: Programme & policy framework in plan • Direct capitalisation: US$19.2M Page 12

  13. Slide 13: ACT Project: Location of Ore Reserves

    ACT Project: Location of Ore Reserves 0 1 3kms TMC Caga4 ACT Adlay Page 13

  14. Slide 14: Brief market and sales overview

    Analyst visit 4 June 2005 Brief market and sales overview

  15. Slide 15: Nickel supply and demand balance, price and stock development

    Nickel supply and demand balance, price and stock development CY 2003 2004 2005 Global Supply (kt) 1,284 1,272 1,305 %change -0.9% 2.6% Global Consumption (kt) 1,240 1,263 1,317 %change 1.9% 4.3% Surplus/Deficit 43 9 -12 Source: CRU 40,000 18,000 LME Nickel Stocks LME Cash Price 17,000 35,000 LME Ca

  16. Slide 16: Nickel market is in structural tightness

    Nickel market is in structural tightness ¾Nickel demand remains robust – 300 series remains the workhorse of the stainless industry because of “core” applications – Strong growth in the aerospace industry and land-based turbines – Hybrid electric vehicles provide a positive development for long-term

  17. Slide 17: Yabulu Ni production and sales

    Yabulu Ni production and sales Yabulu nickel sales 36 32 (kt) (kt) 28 24 20 FY00 FY01 FY02 FY03 FY04 FY 04 Geographical Sales split – Poised for YEP Output Other 6% Europe Asia 19% 75% Source: BHP Billiton Page 17

  18. Slide 18: Cobalt supply and demand balance, price development

    Cobalt supply and demand balance, price development CY 2001 2002 2003 2004* Global Supply (kt) 41.5 42.4 46.7 49.5 %change 2.2% 10.1% 6.1% Global Consumption (kt) 39.4 41.0 45.9 49.4 %change 4.1% 12.0% 7.6% Surplus/Deficit 2.1 1.4 0.8 0.1 Source: CRU * Provisional figures Metal Bulletin Cobalt 99.8%

  19. Slide 19: Yabulu Cobalt production and sales

    Yabulu Cobalt production and sales Yabulu cobalt sales 2.5 2 1.5 (kt) 1 0.5 0 FY00 FY01 FY02 FY03 FY04 Geographical Sales split – FY04 Other 20% Asia 80% Source: BHP Billiton Page 19

  20. Slide 20: The QNI Horizon Strategy – creating a robust platform for capital efficient growth

    The QNI 3 Horizon Strategy – creating a robust platform for capital efficient growth Central Refinery Strategy Optimise Yabulu margins • Phase I: Develop Ravensthorpe as • Incremental value-added product “front end” and expand development. Yabulu. Stabilise Yabulu operation • Phase II: • De-bottlene

  21. Slide 21: Incremental value-added product development for cobalt

    Incremental value-added product development for cobalt Aim: Incremental value-added product development based on modification of existing products Target: Li-Ion battery for portable applications Results:Last year 70% of cobalt was sold as a premium chemical product to the Li-Ion battery industry Fu

  22. Slide 22: Yabulu Refinery

    Analyst visit 4 June 2005’ Yabulu Refinery Alan Cuddon

  23. Slide 23: Outline of presentation

    Outline of presentation • Our vision • Yabulu strategy • Yabulu Refinery overview • Yabulu Performance • Our Environment • Our Community Page 23

  24. Slide 24: Our Vision

    Our Vision We are here for the long term to grow a responsible, robust, world class nickel and cobalt business. Page 24

  25. Slide 25: Overview - Yabulu Refinery

    Overview - Yabulu Refinery • Commenced operations in 1974, ore from Greenvale nickel deposit. • Mine exhausted in 1992; other domestic supplies in 1995. Imported ore since 1986 • Located on the east coast of Australia • 3.5 M tpa of im ported ore produces 32 000T Ni and 2000T Co • Efficient refining

  26. Slide 26: Production, process & people

    Production, process & people • Four main processing areas • Continuous process – Caron • Ore Roast, Extract & Refine • 24 hour production utilising 4 shift crews on 12hr rotating roster • Day-work support crews • People – 700 compliment + 200 projects Page 26

  27. Slide 27: Product Range – Nickel/Cobalt Products

    Product Range – Nickel/Cobalt Products Nickel Cobalt • QN Nickel compacts • QN ChemGrade (>99% Ni) Cobalt • QN Nickel Carbonate • QN Nickel Oxide (78%Ni) Page 27

  28. Slide 28: The QNI strategy

    The QNI strategy Central Refinery Strategy Optimise Yabulu margins • Phase I: Stabilise Yabulu operation • Incremental value-added product Develop Ravensthorpe as development. “front end” and expand • Zero harm • Plant efficiency projects Yabulu. • Business re-engineering • Gas conversion • Phase II

  29. Slide 29: Utilities

    Utilities Power Generation • Coal-fired boiler produces process steam & power Gas Production • Syngas, aqua ammonia & H2S from naptha Conversion to Coal Seam Methane • Tie in’s completed, key equipment being procurred • Taking gas at Yabulu from early 2006 • Reduce unit costs, US$0.14/lb nickel Page

  30. Slide 30: Improving safety

    CIFR rolling 12 month 0 2 4 6 8 10 12 14 16 Page 30 Jan-01 May-01 Sep-01 Jan-02 Improving safety May-02 Sep-02 Jan-03 May-03 Sep-03 Jan-04 May-04 Classified Injury Frequency Rate Performance Sep-04 Jan-05

  31. Slide 31: Improving Production - Ni

    Improving Production - Ni YTD Apr 05 Nickel Production (tonnes) (financial year) 30,000 33,000 32,000 27,500 31,000 25,000 30,000 32,590 25,655 31,166 29,000 22,500 28,000 28,455 20,000 27,000 FY05 YTD 26,000 Act FY02 Act FY03 Act FY04 Act Page 31

  32. Slide 32: Production - Co

    Production - Co Cobalt Production (tonnes) YTD Apr 05 (financial year) 2,000 2,000 1,900 1,500 1,800 1,000 1,894 1,522 1,877 1,700 1,696 500 1,600 - 1,500 FY05 FY02 Act FY03 Act FY04 Act YTD Act Page 32

  33. Slide 33: Post Investment Review – Yabulu Optimisation Initiatives

    Post Investment Review – Yabulu Optimisation Initiatives • HSEC • Benefits – 0 CI, 0 MTC – NPV US$69.8m @ 7.0% discount – Payback 2.2yrs • Budget – ROR 77.3% – Safer plant operation – Budget US$15.4m – Ni +2.2% – Actual US$15.4m – Co +8% – Steam Savings 24tph – Reduced Energy 512,000 GJ/yr – Reduced

  34. Slide 34: QNI Financial Performance

    QNI Financial Performance US$M FY05 H1 FY04 FY03 Ni Production Tonnes 15,027 32,590 31,166 M lb Ni 33 72 69 Ni Sales Tonnes 15,556 32,097 33,008 M lb Ni 34 71 73 Ni Turnover $M 207 375 234 EBITDA $M 96 163 48 Depreciation $M 18 28 24 EBIT $M 78 135 24 Turnover - EBITDA $M 111 212 186 $/lb Production

  35. Slide 35: Operating Unit Cost (after Cobalt Credit)

    Operating Unit Cost (after Cobalt Credit) Unit Operating Cost (US$/lb after Co credits) Q1-Q3 2005 3.50 (financial year) 4.00 3.50 3.00 3.00 2.50 2.50 2.00 2.00 1.50 1.50 2.27 1.00 1.00 2.41 2.32 2.29 0.50 0.50 - FY05 YTD - Act FY02 Act FY03 Act FY04 Act * Normalised to FY01 protocols Page 35

  36. Slide 36: QNI Cost Structure

    QNI Cost Structure Other (10%) Chemicals/Additives (4%) Wages/Salaries (8%) Ore (42%) Maintenance (12%) Fuels/Energy (24%) Page 36

  37. Slide 37: Environment Management programs

    Environment Management programs • Environment Assessment and Management (EA&M) Program – carried out by CQU, Uni of Qld and JCU. – monitors and investigates marine, estuarine, terrestrial and freshwater systems, in place for 5 years ~ clean bill of health. • Water Recycling Facility – $25million WRF

  38. Slide 38: Community Relations

    Community Relations • Matched Community Safety Grants when recognising 1,000,000 LTI free hours (twice in FY05!) • Community spend – Sustainable Energy Precinct – Thuringowa Riverway Project: $750,000 – Adopt A School program with NQ Cowboys – Cowboys foremost community program ~ & a league benchmar

  39. Slide 39: QNI Yabulu Refinery - The Triple Bottom Line

    QNI Yabulu Refinery - The Triple Bottom Line Environment Community Business Our License to Operate Page 39

  40. Slide 40: Ravensthorpe Nickel Project

    Analyst visit 4 June 2005 Ravensthorpe Nickel Project

  41. Slide 41: Ravensthorpe Nickel Project

    Ravensthorpe Nickel Project Central Refinery Strategy Optimise Yabulu margins • Phase I: Stabilise Yabulu operation • Incremental value-added product Develop Ravensthorpe as development. “front end” and expand Yabulu. • Zero harm • Plant efficiency projects • Phase II: • Business re-engineering • Ga

  42. Slide 42: Ravensthorpe Nickel Project Site Layout

    Ravensthorpe Nickel Project Site Layout Shoemaker-Levy LEGEND Co nve yor Pit Outline h Sou t Co ast Priority Flora Re-vegetated Area Hig hw Conservation Offset ay Plant Village Halleys Access Road Hale Bopp 0 5 kilometres TSF Evaporation Ponds Page 42

  43. Slide 43: HSEC Performance and Issues

    HSEC Performance and Issues • Leading indicators on target or better • CIFR (end – May and 1,025,000 hrs) at RNP of 4.7 • ICAM training completed and FRCPs implemented • DuPont appointed to assist in the Road to Zero Harm • Contractor management remains the key focus • Tender evaluations • Pre-mobil

  44. Slide 44: Trial Pit Geology - Visually Distinct Ores

    Trial Pit Geology - Visually Distinct Ores Shear Shearwith with qtz qtzveining veining Caprock-waste Caprock-waste Silicified Silicifiedcore corestone stone Kaolin Kaolinrich richzone zone (L2 ore type) (L2 ore type) L2 L1 S1 Page 44

  45. Slide 45: Ravensthorpe Nickel Project - Virtual Tour

    Ravensthorpe Nickel Project - Virtual Tour Page 45

  46. Slide 46: Cawse Ramp-up Rate

    Ravensthorpe Nickel Project Cawse Ramp-up Rate Cawse Autoclave Fe ed Rate Cawse Autoclave Feed Tonnage 80 Tonnes per Quarter 120000 Ore tonnes/hour 60 80000 40 20 40000 0 0 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 99 99 99 99 00 00 00 00 01 01 01 99 99 99 99 00 00 00 00 01 0

  47. Slide 47: Ravensthorpe Nickel Project Overall Progress April 2005

    Ravensthorpe Nickel Project Overall Progress April 2005 100% Planned Progress 90% Earned Progress 80% RNO Planned Progress 70% 60% RNO Earned Progress RJV 50% Planned Progress : 40% 20.5% Earned Progress : 21.6% 30% 20% 10% RNO 0% 4 4 4 4 5 5 5 5 6 6 6 6 7 7 r -0 n -0 p -0 c-0 r -0 n -0 p -0 c-0 r -

  48. Slide 48: Proposed Upgrade at Esperance Port

    Ravensthorpe Nickel Project Proposed Upgrade at Esperance Port Location of Sulphur Storage Shed Proposed unloading of sulphur and loading of containers at Berth 2 Proposed Sulphur Storage Shed Page 48

  49. Slide 49: Titanium Prices 2002-05

    Ravensthorpe Nickel Project Titanium Prices 2002 - 05 DFS Estimate DFS Estimate Page 49

  50. Slide 50: Key Issues and Forward Plan

    Key Issues and Forward Plan • HSEC • DuPont assistance • Cost Pressures • Extensive off-shore procurement (>US$200M) • Early procurement of Titanium raw materials • Minimise changes through scope and design control • Sole source where expertise and leverage • Schedule • On track for early 2007 start

  51. Slide 51: Yabulu Extension Project

    Analyst Visit 4 June 2005 Yabulu Extension Project

  52. Slide 52: What is YEP?

    What is YEP? • Yabulu flowsheet consists of ore treatment and metal refining. • YEP extends the high-value add metal refining plant. • Why at Yabulu? – Known flowsheet – more of the same with only one new flowsheet step – Skilled workforce – Maintains existing product suite (Ni & Co) and branding •

  53. Slide 53: HSEC Performance

    HSEC Performance 9 241 000 hours CI free during implementation [508 000 hours CI free project to date including all study phases] 9 Yabulu’s licence conditions change as required to cater for the construction, commissioning and subsequent operation of YEP plant 9 Construction EMP & ambient particula

  54. Slide 54: Progress

    Progress ¾ Project remains on schedule ¾ Long lead equipment ordered ahead of schedule ¾ Supply Enquiries issued 80 of 85 ¾ Construction Contracts let 4 of 11 ¾ Commitments to date AUD 123M –v- AUD 142 plan Page 54

  55. Slide 55: Site Activities

    Site Activities ¾ Site labour agreement ratified ¾ Early site infrastructure works underway ¾ Progressive handover of areas from Operations ¾ BNC tanks foundations completed, tank erection started ¾ Horizontal concrete & piling package started Page 55

  56. Slide 56: Site Photographs

    Site Photographs MHP Receival & Leach Preboil Stills ASX Plant Page 56

  57. Slide 57: Site Photographs

    Site Photographs Nickel Plant Cobalt Plant Page 57

  58. Slide 58: Ohpodilliton

    dl Ohpodilliton

BHP Billiton — Corporate Update (June 2005) on 6ix