Slide 1: Orica Kooragang Island Community Reference Group Meeting
Orica Kooragang Island Community Reference Group Meeting 27 May 2013 CONFIDENTIAL Information contained in this report is strictly confidential and may be subject to legal professional privilege. It is the exclusive property of Orica Limited, and is solely for Orica Limited internal use. No part of
Slide 2: Welcome and Introductions
Welcome and Introductions Orica Greg Holmes, General Manager Sherree Woodroffe, Sustainability Manager Antony Taylor, Major Projects Project Statutory Manager Matt Tomlins, Lead Process Engineer Kane Millard, Environmental Advisor Richard Sheehan, Environmental Advisor Jarrod Palmer, G
Slide 3: Meeting Agenda
Meeting Agenda Welcome and introduction K Cooper 5.00pm Previous meeting notes All 5.05pm Ammonia Plant vent stack flammable emission M Tomlins 5.10pm modelling Stockton Air Quality Monitoring Station K Millard 5.25pm Site status G Holmes 5.35pm Overview of Prill Tower investigation A Taylor 5.40pm
Slide 4: Apologies
Apologies John Hayes, Correct Planning and Consultation for Mayfield Tracey Frazer, Stockton Public School Departure: Mark Sheehan, Stockton Resident
Slide 5: Previous Meeting Notes
Previous Meeting Notes Sent by email 24 May 2013
Slide 6: Ammonia Plant vent stack flammable emission modelling
Ammonia Plant vent stack flammable emission modelling
Slide 7: Outline
Outline: Background Background information relating to the vented gases containing hydrogen and previous reports. Facts about Hydrogen Information about hydrogen and what happens when it is released into the atmosphere as a gas. Facts about ‘Fuels’ What is LEL? Summary Page 1
Slide 8: Background
Background: Gases containing hydrogen (H2) are vented from the Ammonia Plant during start-up. The hydrogen containing gas is vented from two stacks, SP8 and SP9, for up to 6 hours but not from both stacks at the same time. Venting occurs from SP8 first followed by venting from SP9. Both stacks are e
Slide 9: Facts about Hydrogen
Facts about Hydrogen: Hydrogen gas (H2) is a very ‘light’ chemical. How ‘light’ is Hydrogen gas? Hydrogen gas is 2 times lighter than helium . Hydrogen gas is 14 times lighter than air. What does this mean? What happens when you fill a balloon with helium and let it go? It rises up into the sky. Wha
Slide 10: Facts about Hydrogen
Facts about Hydrogen: So what does this mean for hydrogen gas? What would happen if you filled a balloon with hydrogen gas? It would rise up into the sky. How does this apply to the stacks SP8 and SP9? What would happen to vented hydrogen gas? Keep in mind what happens to a hydrogen balloon. The rel
Slide 11: Facts about 'Fuels'
Facts about ‘Fuels’ : What does LEL mean? LEL = Lower Explosive Limit LFL = Lower Flammability Limit This is the lowest concentration of a gas in air that can be ignited in the presence of a flame. Below this concentration, the mixture is referred to as a ‘lean’ fuel mixture. What is the LEL for Hyd
Slide 12: Facts about 'Fuels'
Facts about ‘Fuels’ : What does all this mean? If hydrogen gas is mixed with air and the concentration of the hydrogen gas in the air is less than 4 vol %, then it will not ignite even if a flame or ignition source is present. What is the concentration of hydrogen in gas vented from SP8 or SP9? The
Slide 13: Summary
Summary: Hydrogen gas is very light and will want to rise into the sky. To ignite hydrogen gas the concentration must reach 4 vol % in air with an ignition source present. The ground level concentration of hydrogen gas vented from the stacks, SP8 and SP9, is significantly lower than 4 vol %, even un
Slide 14: Stockton Air Quality Monitoring Station
Stockton Air Quality Monitoring Station
Slide 15: Site Status
Site Status
Slide 16: Prill Tower investigation + Environmental improvement projects and expansion project update
Prill Tower investigation + Environmental improvement projects and expansion project update
Slide 17: Prill Tower Particulate Reduction Project
Prill Tower Particulate Reduction Project • Undertake a monitoring program aimed at characterising Prill Tower particulate emissions (ongoing) • Sampling was undertaken under different meteorological and process Stage 1 conditions • Undertake a review to identify available options to reduce particul
Slide 18: Stage 1 - Prill Tower Particulate Monitoring Program
Stage 1 - Prill Tower Particulate Monitoring Program • Construction of a sampling duct on the western Prill Tower extraction fan outlet to enable isometric stack sampling. • Particulate sampling was undertaken different meteorological and process conditions. • PM10, PM2.5 and Total Particulate conce
Slide 19: Spring 2012 Particulate Sampling Data
Spring 2012 Particulate Sampling Data <date> <document id> Page 3
Slide 20: Summer 2013 Particulate Sampling Data
Summer 2013 Particulate Sampling Data <date> <document id> Page 4
Slide 21: Particulate Reduction Options
Particulate Reduction Options a) Preventative Controls These options focus on minimising the generation of particulates during the AN prilling process, thereby reducing the concentration of particulates discharged from the AN1 Prill Tower; b) Mitigating Controls These options focus on opportunities
Slide 22: Identified Option Evaluation Process
Identified Option Evaluation Process A. Effectiveness System should be capable of reducing particulate emissions, with success in similar applications. B. Operability System should be capable of being integrated into existing operations and maintenance activities and procedures; technology and mater
Slide 23: Options currently under further evaluation
Options currently under further evaluation <date> <document id> Page 7
Slide 24: Site Improvement Programme
Site Improvement Programme Improvements in SHEC performance to progress the site towards world class • Organisation restructure including new management roles People • Operational restructure in progress • Improvements to Permit to Work, Management of Change Process • Improvements to Projects – doin
Slide 25: Improvement Projects
Improvement Projects Ammonia Risk Reduction 2012/2013 • $5M spent in implementation of existing programmes • $8M spent in engineering planning on new programmes • 2013 forecast of $16M on ammonia improvement Other Major Improvement Projects in 2013 • DCS Upgrade $17M • AN Reclaim Environmental Upgra
Slide 26: Ammonia Management Improvement Programme
Ammonia Management Improvement Programme Programme of works with the objective of reducing ammonia related risks at KI: Multi-layer approach: 1. Elimination / Simplification 2. Reduction of inventories 3. Capture & destroy 4. Additional mitigation (detection / isolation) Risk-based: Ammonia piping t
Slide 27: Kooragang Island Expansion Project
Kooragang Island Expansion Project • Project feasibility work is complete and all statutory planning approvals have been obtained • An engineering pathway for construction has been confirmed and a detailed technical appraisal has been presented to the Board • Most long lead items have been ordered •
Slide 28: 2013 CRG meeting plan – proposal
2013 CRG meeting plan – proposal 27 May AN1 Prill Tower report – summary Update of Orica’s expansion project and environmental improvement program 26 August Orica’s operations across the Hunter Safety integrated systems – process safety History of Orica 25 November Arsenic remediat
Slide 29: Briefing Paper
Briefing Paper rica Kooragang island ‘Community Reference Group Monthly Briefing Paper #19 — May 2043 DRAFT PAPER FOR CRG REVIEW 41. Introduction “This Briefing Paper focuses on activites and events during the month of April2013 (wth the ‘exception of community engagement activity which is reported
Slide 30: Other Business
Other Business West, Texas incident
Slide 31: Actions from previous meetings
Actions from previous meetings
Slide 32: Slide 32
Slide 33: —— QWorica
————— —— QWorica