Slide 1: UXG El Gallo Complex Development Photo Update November 18, 2011
UXG El Gallo Complex Development Photo Update November 18, 2011
Slide 2: Preparation for haul road upgrading begins between Palmarito and El Gallo
2 Preparation for haul road upgrading begins between the Palmarito and El Gallo deposit.
Slide 3: Haul road construction begins
3 Haul road construction begins. To date, 300 meters of road has been constructed to the Lupita and Sagrado Corazon deposits. These two deposits are located 2 km south of the process plant. 3
Slide 4: Clearing the way for haul road construction to Lupita and Sagrado Corazon
4 Clearing the way for haul road construction to the Lupita and Sagrado Corazon deposits. Looking north towards the previously mined area.
Slide 5: Looking down on the gold recovery plant and process ponds
5 Looking down on the gold recovery plant and process ponds.
Slide 6: Looking inside the gold recovery plant
6 Looking inside the gold recovery plant. The crane is in the process of removing older equipment that will not be used during El Gallo Phase 1 production.
Slide 7: Looking inside the gold recovery plant building
7 Looking inside the gold recovery plant building. The crane is in the process of removing older equipment that will not be used during mining.
Slide 8: Dismantling of old gold recovery plant equipment complete
Dismantling of the old gold recovery plant equipment, now complete. 8
Slide 9: Community presentation on current and future development plans
A community presentation announcing the company’s current and future development plans including the 2 km road paving between the Palmarito and El Gallo deposits. 9
Slide 10: Local community members attend town gathering
10 Local community members attend town gathering in support of US Gold’s progress and construction activities.
Slide 11: Ribbon cutting ceremony for haul road construction
11 “Ribbon Cutting” ceremony commemorating initial construction of the haul road between the Palmarito and the El Gallo deposits.
Slide 12: First of three new Terex haul trucks delivered to El Gallo Complex
12 The first of three new 100 tonne Terex haul trucks being delivered to the El Gallo Complex.
Slide 13: Haul truck assembly
13 Haul truck assembly.
Slide 14: 14
14
Slide 15: 15
15
Slide 16: 16
16
Slide 17: 17
17
Slide 18: 18
18
Slide 19: 19
19
Slide 20: All roads lead to El Gallo!
20 All roads lead to El Gallo!
Slide 21: 21
21
Slide 22: 22
22
Slide 23: New Caterpillar D8T bulldozer delivered to El Gallo Complex
23 New Caterpillar D8T bulldozer being delivered to the El Gallo Complex.