Truscott Mining Corporation Ltd · ASX:TRM

Truscott Mining — Investor Presentation (January 2016)

15 slides from Truscott Mining's investor presentation, Jan 7, 2016

  1. Slide 1: Tennant Creek Goldfields Exploration Projects Introductory Presentation 2016

    For personal use only ABN 31 116 420 378 Tennant Creek Goldfields Exploration Projects Introductory Presentation 2016

  2. Slide 2: Disclaimer - Forward Looking Information

    Disclaimer - Forward Looking Information For personal use only The material contained in this presentation is provided solely for your general knowledge and is not intended to be a comprehensive review of all matters and developments concerning Truscott Mining Corporation Limited (“TRM”) or its affi

  3. Slide 3: Tennant Creek Goldfields Location – Northern Territory

    Tennant Creek Goldfields Location – Northern Territory For personal use only Excellent Access and Low A Regional Centre with a Mining Infrastructure Costs Focus  500 km north of Alice Springs - main Stuart Highway to Darwin  Rail - Alice Springs to Darwin line  Mining support industries (drilling

  4. Slide 4: Truscott's Current Exploration Projects

    Truscott’s Current Exploration Projects Tennant Creek Goldfields For personal use only

  5. Slide 5: Regional Settings

    Tennant Creek Goldfields Regional Settings For personal use only Sedimentary rocks that host deposits of the Tennant Creek Goldfields date back 1.8 billion years. Later geological events acted to develop a series of transcurrent shears (faults) that extend hundreds of kilometres across the goldfield

  6. Slide 6: Significant Historic Gold Production

    Tennant Creek Goldfields Significant Historic Gold Production For personal use only Mine Operations Ore Mined Grade Metal Years Tonnes Au Au Ounces Warrego 1972-1989 6,750,000 6.6 1,475,000 Nobles Nob 1947-1986 1,996,000 17.3 1,110,000 Juno 1967-1977 452,000 56.1 815 ,000 White Devil 1987-1999 1,618

  7. Slide 7: Tennant Creek Goldfield Westminster & Hera Project Settings

    Tennant Creek Goldfield Westminster & Hera Project Settings For personal use only ______________5Km

  8. Slide 8: Westminster Project – to date

    Westminster Project – to date m Drilling and other exploration activities For personal use only 1930 -1953; Numerous small diggings within project area with the most successful being at Wheal Doria, a small underground mine (40m deep) producing 1,865 ozs @ 28.4 g/t Au from 2,040 tons of ore. 1953-19

  9. Slide 9: Westminster Project – Size and location

    Westminster Project – Size and location Ore Body One and Target Two For personal use only Zone 1 Gold Assays = red Ore Body 1 Target 2 Ore Body 1 zone 1, is projected here from drilling, surface mapping & geophysics to be similar to White Devil Mine Target 2 is projected to be similar to Warrego Min

  10. Slide 10: Westminster Project, Long Section

    Westminster Project, Long Section Ore Body One – Zone One, Depth Extension Drilling For personal use only Gold Assays Gold Assays Ore Body 1, Zone 1, Planned depth extension drilling Ore body No 1 Depth Extension

  11. Slide 11: Westminster and Hera Project Status

    Westminster and Hera Project Status For personal use only The Westminster Project is understood to contain two major zones of mineralisation. The orientation of these zones can be considered by studying the gravity image for the project . Mineralisation of the eastern section is orientated towards t

  12. Slide 12: Westminster Project – Targeted Gold – 2km strike length

    Westminster Project – Targeted Gold – 2km strike length Gravity geophysics map For personal use only Truscott estimates that less than 5% of the area has been drilled to potential Ore Body 1, Au Assays Red Numbers below are gold assays Indicated ore body 2 Au assays White stars are areas where geoph

  13. Slide 13: Hera Project – Geophysics Map

    Hera Project – Geophysics Map - surface mapping with Iron (gold host) and copper mineralisation localities For personal use only Iron and copper Iron and copper Iron rich Laterite Hill 500m

  14. Slide 14: Directors and Executive Management - Truscott Mining Corporation Limited

    Directors and Executive Management - Truscott Mining Corporation Limited For personal use only Peter N Smith (Executive Chairman & Managing Director) BSc (Min), PG Dip (M Tech), M Min Tech, FAusIMM, CP, International and Australian experience in mine management and mine development. Twenty years exp

  15. Slide 15: For personal use only

    For personal use only ABN 31 116 420 378 Tennant Creek Goldfields – Exploration Projects

Truscott Mining — Investor Presentation (January 2016) on 6ix