Sky Metals Limited · ASX:SKY

Sky Metals — Investor Presentation (December 2022)

16 slides from Sky Metals's investor presentation, Dec 1, 2022

  1. Slide 1: Exploring Large Scale Tin Systems in NSW

    For personal use only EXPLORING LARGE SCALE TIN SYSTEMS IN NSW DECEMBER 2022

  2. Slide 2: Disclaimer - Important Information

    ASX: SKY D IS C LA IME R - IMPO R T ANT IN FO RMA TIO N For personal use only Disclaimer Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by such forward looking

  3. Slide 3: SKY's Strategy: Advanced Exploration Portfolio

    ASX: SKY S K Y’ S S T R A T E GY For personal use only ADVANCED EXPLORATION PORTFOLIO TIN GOLD COPPER-GOLD Tallebung Project Cullarin Project Iron Duke Project (100% SKY) (80% SKY:DVP JV) (Balmain Option) Doradilla Project Kangiara Project Galwadgere Project (100% SKY) (80% SKY:DVP JV) (100% SKY) Em

  4. Slide 4: Tin Market: Key Technology Metal

    TIN MARKET: KEY TECHNOLOGY METAL For personal use only Tin market driven by electronic sector demand and supply crunch driven by 30+ year under investment – 52-week high tin price of USD 47,000/t Demand Increase with Emerging Technologies

  5. Slide 5: Tallebung Target: Bulk Tonnage Tin

    ASX: SKY T ALLE B U NG T IN PR O JE CT For personal use only TALLEBUNG TARGET: BULK TONNAGE TIN 5

  6. Slide 6: Tallebung Target: Potential Bulk Tonnage Tin Resource

    ASX: SKY T ALLE B U NG T IN PR O JE CT For personal use only TALLEBUNG TARGET: POTENTIAL BULK TONNAGE TIN RESOURCE • Site of large-scale tin mining activity over 100 years from the 1880s to 1980s. • 2019 drilling by SKY targeting high-grade lodes; re-assessed to show significant bulk tonnage potenti

  7. Slide 7: Infrastructure Already Connected

    ASX: SKY T ALLE B U NG T IN PR O JE CT For personal use only INFRASTRUCTURE ALREADY CONNECTED Infrastructure is already in place from previous mining including: • Powerlines to site. • Established past water supply. • Sealed and unsealed roads constructed to site. • Use of historic tailings dam, onl

  8. Slide 8: Tallebung Target: Drilling

    ASX: SKY T ALLE B U NG T IN PR O JE CT For personal use only TALLEBUNG TARGET: DRILLING • Extensive historic mining and drilling. • Recent drilling has continued to expand the scale of the deposit. • No boundary to the tin mineralisation, mineralisation is open in all directions. • Tin hosted in cas

  9. Slide 9: Tallebung Target: Exceptional Metallurgy

    ASX: SKY T ALLE B U NG T IN PR O JE CT For personal use only TALLEBUNG TARGET: EXCEPTIONAL METALLUGY • Exceptional TOMRA ore sorting results reduce plant feed by over 50% for 98% recovery of tin. • Simple gravity circuit has produced a desirable +60% tin concentrate for sale. • Dense medium processi

  10. Slide 10: Tallebung Target: Next Steps

    ASX: SKY T ALLE B U NG T IN PR O JE CT For personal use only TALLEBUNG TARGET: NEXT STEPS Produce an Exploration Target from recent drilling Continue improvements to metallurgical processing Further drilling to develop an inferred resource and start scoping studies Drone Photo of the Tallebung Tin M

  11. Slide 11: Doradilla - 16km Mineral System

    ASX: SKY D O R A D ILLA T IN PR O JE CT For personal use only DORADILLA – 16km MINERAL SYSTEM

  12. Slide 12: 3KEL Target: Open in All Directions

    ASX: SKY D O R A D ILLA T IN PR O JE CT For personal use only 3KEL TARGET: O PE N IN A LL D IR E C T IO NS SCHEMATIC LONG SECTION 12

  13. Slide 13: 3KEL Target: Open at Depth

    ASX: SKY D O R A D ILLA T IN PR O JE CT For personal use only 3KEL TARGET: OPEN AT DEPTH Recent results include: 3KRC030: - 43m @ 0.36% tin from 89m, including; - 14m @ 0.91% tin & 0.48% Cu from 112m, including; - 3m @ 2.48% tin, 0.90% Cu, 88.8g/t indium & 22.5g/t silver from 117m. 3KRC026: - 17m @

  14. Slide 14: Primary Tin - Malayaite-Hosted Metallurgy

    ASX: SKY D O R A D ILLA T IN PR O JE CT For personal use only PRIMARY TIN – MALAYAITE-HOSTED METALLURGY • Discussion with smelting group indicate that malayaite concentrates of +30% tin are amenable to smelting. • Previous metallurgical work demonstrates +90% recovery on oxide copper. • UNSW and ANS

  15. Slide 15: SKY's Team: Experienced and Proven Management

    ASX: SKY S K Y’ S T E AM For personal use only EXPERIENCED AND PROVEN MANAGEMENT NORMAN SECKOLD | Chairman RICHARD HILL | Non-Executive Director CAPITAL STRUCTURE 30+ years in the full-time management of natural resource 25+ years experience in the mineral resources sector as a Shares on issue 376.8

  16. Slide 16: Exploring Large Scale Tin Systems in NSW

    EXPLORING LARGE SCALE TIN SYSTEMS IN NSW For personal use only

Sky Metals — Investor Presentation (December 2022) on 6ix