Hispania Resources Inc · TSXV:ESPN

Hispania Resources — Investor Presentation (April 2024)

23 slides from Hispania Resources's investor presentation, April 2024

  1. Slide 1: A Low-risk Opportunity with Solid Zinc-Copper and Strategic Metals Foundations in Spain

    A Low-risk Opportunity with Solid Zinc- Copper and Strategic Metals Foundations in Spain

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements u This presentation contains certain “forward-looking statements” and “forward-looking information” under applicable securities laws. Except for statements of historical fact, certain information contained herein constitutes forward- looking statements. Forward-looking sta

  3. Slide 3: Hispania Resources

    Hispania Resources u Hispania Resources is a Canadian Mineral Exploration and Development company holding three project areas in Spain which have been selected for their critical and strategic metal potential. These properties are domiciled in Extremadura and Castille y Leon. u The defined resources

  4. Slide 4: Critical Metals for the Green Transition

    Critical Metals for the Green Transition u Copper is currently experiencing it’s second bull market this century and predicted to have ‘explosive price upside’ in next 3 years (Citigroup, 2024) u Zinc is listed as a critical mineral by Natural Resources Canada. As the green transition progresses the

  5. Slide 5: The Herraris Permit (PBR)

    The Herraris Permit (PBR) u The Herraris Permit is a large property located in Extremadura province approximately 150 km southwest of Madrid, and contains the Puebla de la Reina prospect (PBR) u The PBR deposit represents a typical Cu-Zn-Pb volcanic- hosted massive sulphide orebody. It was discovere

  6. Slide 6: The Herraris Permit

    The Herraris Permit u The footwall and hanging wall of the deposit show a pervasive hydrothermal alteration dependent on the type of protolith. Felsic volcanic rocks are chloritized and sericitized and strongly silicified adjacent to the orebody which probably formed in a back-arc setting u Dissemin

  7. Slide 7: PBR Project

    PBR Project u Geology – Historical DDH u Historical DDH: 7,429.30 meter

  8. Slide 8: PBR Typical Section

    PBR Typical Section DDH Sections and Intercepts PR01 Au From To Length Cu Pb Zn Ag (ppm) Sample # (m) (m) (m) (ppm) (ppm) (ppm) (ppm) 1 25 26 1 2,200 3,070 21,000 3 <0.05 2 26 27 1 13,585 7,470 131,000 32 0.09 3 27 28 1 67,000 18,570 200,000 71 0.58 4 28 29 1 16,000 69,285 353,000 262 0.84 5 29 30 1

  9. Slide 9: Estimated Resources at La Herraris

    Estimated Resources at La Herraris u Outukumpu (1999-2001) u Outukumpu indicated a provisional estimated resource at the Puebla laReina deposit, u 500,000t @ 1.6% Cu, 11% Zn, 1.2% Pb and 32 g/t Ag u At present the structure was only recognized on the northeastern area of PBR. Further works to consid

  10. Slide 10: The Lumbrales Permit

    The Lumbrales Permit u The 2,900 Hectare Lumbrales Permit contains the former Mari Tere mine and two other artisanal tin prospects situated in Castille, about 115 km west of Salamanca u As per Resource work by Siemcalsa, there was an estimated resource of 3 million tons of 0.25% tin and 100 ppm Moly

  11. Slide 11: The Lumbrales Permit - Previous Work

    The Lumbrales Permit Previous Work u Historically two periods of mining were undertaken at the Mari Tere mine u A period of mining by German mining company Montes de Galicia S. A. during 1941-45, production unknown u Mina Duro development total of 30,000 tonnes of material produced and processed on

  12. Slide 12: Lumbrales – Longitudinal Section of a Mari Tere Mine

    Lumbrales – Longitudinal Section of a Mari Tere Mine Surface projection of vein systems and decline ramp shows relationship of diamond drill holes, underground openings and surface decline.

  13. Slide 13: Surface Projection of Veins and Decline of Mari Tere at Lumbrales

    Surface Projection of Veins and Decline of Mari Tere at Lumbrales Image surface projection of two vein systems (green) and decline ramp (yellow)

  14. Slide 14: The Otero Property

    The Otero Property u The company’s most advanced project is Otero, located in Castille y Leon, recently acquired upon the liquidation of Siemcalsa, a corporation owned by the administration of Castille y Leon u The Otero property hosts a Cu-Sn-Zn-Au-W polymetallic skarn deposit u The base is a high

  15. Slide 15: The Otero Property Location

    hr HISPANIA RESOURCES DISTANCE FROM ADMINISTRATIVE CENTERS we, eS

  16. Slide 16: The Otero Property - Highlights

    The Otero Property - Highlights u Multi-disciplinary mining research (cartography, geochemical, geophysical testing, diamond drilling and mine development model etc.) have been completed u The deposit has a consistent and coherent 3D geological model with tabular morphology. The deposit has a N135 d

  17. Slide 17: The Otero Property – Projection of Drillholes in Section

    The Otero Property – Projection of Drillholes in Section

  18. Slide 18: The Otero Property – Projection of Ore Zone Along Planned Ramp

    The Otero Property – Projection of Ore Zone Along Planned Ramp

  19. Slide 19: The Otero Property Mineralization

    The Otero Property Mineralization Mineralization Contained in the Central Portion and the most important levels as follows M Level (68% of total resources) I Level 2.5 Mt @ 0.70% Cu 1.0 Mt @ 0.22% Cu 26 g/t Ag 2.36 Cu equiv 12 g/t Ag 2.05 Cu equiv 1.46% Zn 0.47% Zn 0.23% SnO2 0.18% SnO2 0.04% VO3 0.

  20. Slide 20: The Otero Property

    The Otero Property u The property has a mining permit good until 2042; Work carried out by former owners shows that the deposit will be accessed by a surface ramp as follows: u Ramp Length 2,700 m u Slope 13.5% u Portal ramp at 1,068 m elevation for operating the central zone of the deposit between

  21. Slide 21: The Otero Property

    The Otero Property u Metallurgical work Carried out by Siemcalsa showed good recoveries of: u Cu (88%) u Zn (89.7%) u Ag (68.1%) u And WO3 by flotation u Scheelite is recovered from flotation of sulfide tails with finer grinds u Hispania has shared data on the Otero Property with a Canadian firm of

  22. Slide 22: Hispania Resources Capital Structure

    Hispania Resources Capital Structure Share Price $0.17 Current Shares Issued and Outstanding* 58,510,159 Options Hispania Management and Directors 5,450,000 ($0.10) Warrants 3,166,667 ($0.30) *Management and Insiders own 43% (25,423,775) of issued and outstanding shares post RTO with CPC and financi

  23. Slide 23: Contact Us

    Contact Us u Norman Brewster, CEO u Phone +1-416-970-3223 u Email: norm@hispaniaresources.com u Rahim Allani, Director u Phone: +1-416-457-0549 u Email: Rahim@hispaniaresources.com u Canada Office: Unit 602 – 360 Bay Street, Toronto ON, Canada u Spain Office: Américo Vespucio, 5-4 Edif. Cartuja, pta

Hispania Resources — Investor Presentation (April 2024) on 6ix