Compagnie De Saint-gobain Sa · EURONEXT:SGO
Compagnie De Saint-gobain Sa — Investor Presentation (2021)
46 slides from Compagnie De Saint-gobain Sa's investor presentation, 2021
Slide 1: Team 7 Country: Lebanon
Team 7 Country: LEBANON Bechara NOUJEIM Roy AGHNATIOS Nelly AILABOUNI
Slide 2: Palimpsest, rewriting with fragments of memory
MULTI COMFORT STUDENT CONTEST 2020/2021 Palimpsest, rewriting with fragments of memory … Team 7: Bechara Noujeim, Roy Aghnatios, Nelly Ailabouni University: Lebanese University Country: LEBANON
Slide 3: Fragments of memory
Fragments of memory
Slide 4: Fragments of memory
Fragments of memory
Slide 5: Silent fragments of memory scattered around the site
Silent fragments of memory, witnesses of Saint-Denis history, scattered around the site…
Slide 6: Silent fragments of memory, witnesses of Saint-Denis history
Silent fragments of memory, witnesses of Saint-Denis history…
Slide 7: Topography: preserving the natural difference in levels
Topography: Preserving the natural difference in levels and taking advantage of it.
Slide 8: Stitching together the different levels
Stitching together the different levels, Establishing connections with the neighborhood
Slide 9: Mixed-Use Program: an interconnected network
Mixed-Use Program: an interconnected network
Slide 10: Palimpsest, rewriting with fragments of memory
Palimpsest, rewriting with fragments of memory … Threshold created into the old wall, monumental and reminiscent of the factory gate A porous gallery replaces the factory’s enclosure, Brick Arch leading in, defining a pedestrian access into the project and an open inviting the visitors in. The old g
Slide 11: Palimpsest, rewriting with fragments of memory
Palimpsest, rewriting with fragments of memory … From Industry to Agriculture, the layout of the old factory turns into elevated platforms to be used as shared gardens, conserving the spatial memory of the Coignet factory. Belvedere tower was added, reminiscent of the factories chimneys that defined
Slide 12: Architectural Palimpsest
Architectural Palimpsest, Interconnected and Imbricated layers: Brick mass, white plastered brick mass, copper Densification cladded mass. phase 1 Stages of densification: building over and over, rewriting on the palimpsest, project development and densification phases Densification phase 2 Densific
Slide 13: Choice of the brick as the main building material
Brick and Concrete Choice of the brick as the main building material an affordable material
Slide 14: Landscaping
Landscaping: - Mineral landscaping like the places of Saint-Denis - Water as metaphor of memory. - Water rises and flows down the piazza, revealing the true colors of the pavements, ‘Like forgotten memories emerging back to the surface.’
Slide 15: Warehouse rehabilitation
François Coignet, A Fourierist Social Reformer Warehouse rehabilitation Originally 7 warehouses existed, what is left today is 5 warehouses and 2 walls of the others. Main lobby We propose an addition of 2 glass modules supported on the fragments of the 2 warehouses. Refurbishment of the warehouses
Slide 16: Slide 16
Slide 17: Maison Coignet: Concrete Museum
Maison Coignet: Concrete Museum Addition under the Coignet house terrasse, sandwiched between the historic retaining wall and the house. Design inspired by the original pavilion plans, reinterpreted as light wells
Slide 18: Multi Confor
A _ Multi Confor 3Y SAINT-GOBAIN
Slide 19: Coignet Elementary School
Coignet Elementary School School as a culmination of the ‘’Cultural Axis’’ Kids oriented design: - Kindergarten: Circular womb-like forms with sub- spaces and niches adapted to the toddlers. - Primary: Semi-open courtyard, opening a ‘Vista’ towards the project and an other towards Saint-Denis. - Con
Slide 20: Classroom Layout
Classroom Layout Weber plaster by Saint- Gobain Clerestory windows Bioclean by Saint-Gobain Brick claustra Niches Retractable walls for maximum flexibility Flooring: Saint-Gobain- Adfors glass fiber carpet
Slide 21: Slide 21
Slide 22: The park, from Industry to Agriculture
The park, from Industry to Agriculture Layout inspired from the factory’s plan, in an attempt to give a sense of spatiality to this large industrial wasteland. • The main alleys are recreated and lined with trees • Main axis on Coignet house, following the tradition of French gardens • Courtyards pr
Slide 23: Apartments Typologies
Apartments Typologies T1 18 sqm T1n2 30 sqm T2 45 sqm T2 60 sqm T3 65 sqm T4 80 sqm T5 100 sqm T3 80 sqm
Slide 24: ph Hail ian lil ei
ph Hail ian lil ei Rall Sead BY SAINT-GOBAIN |
Slide 25: Exterior staircases
Exterior staircases In addition to the interior circulations, most of the appartments can be reached through exterior stairs. The French Building code law imposing enclosed windowless staircases for safety reasons, exterior staircases were added to provide a pleasurable stairs experience, offering d
Slide 26: Town Houses Typologies
Town Houses Typologies Different scale, different T4 T4 typologies, in contact with the agricultural park Typical Plan of Row Houses T3 T2 T7 T6 T6 GF 1st Floor 2nd Floor
Slide 27: Slide 27
Slide 28: Site plan
Site plan
Slide 29: Slide 29
Slide 30: WwW
ao a WwW > Lu eae
Slide 31: Level
LEVEL 2
Slide 32: Multi-Comfort Strategies and Saint-Gobain Products
MULTI-COMFORT STRATEGIES and Saint-Gobain Products
Slide 33: Buildings orientation in relation to the solar path
Buildings orientation in relation to the solar path Summer June 21 June 21 June 21 9 Am 12 Pm 4 Pm Winter Dec 21 Dec 21 Dec 21 9 Am 12 Pm 4 Pm
Slide 34: Visual comfort: Natural daylight maximization
Visual comfort: Natural daylight Maximization CLIMAPLUS® SAINT GOBAIN GLAZING: • High light transmission of the glazing; • Appropriate selectivity , admitting as much daylight as possible while preventing transmission of solar heat
Slide 35: Visual comfort: Natural daylight maximization
Visual comfort: Natural daylight Maximization Well lit living space, by large vertical openings to the East, West and South. 21st December, 10h Light colored walls and ceiling by Weber and Placo Saint- Naturally Lit hallway and staircase Gobain to reflect the light and Apartment entrance borrows lig
Slide 36: Indoor Air quality Strategy
Indoor Air quality Strategy Natural Ventilation through Solar chimneys and Mechanical ventilation to avoid heat loss. South North West East
Slide 37: Fire Safety Strategy
Fire Safety Strategy Enclosed Staircase with Extractor Open Extractor Staircase - Sensors - 2 escape paths: Enclosed fireproof staircases and outside open staircase - Smoke extractor - Automatic fire extinguishing system - De-energization of the building, leaving the smoke removal system and fire al
Slide 38: Thermal Comfort and energy saving Strategy
Thermal Comfort and energy saving Strategy GreenHouses/Jardins d’Hiver: • Sustainable façade in relation to the park and common spaces. Winter, December • Additional versatile indoor/outdoor space 21st , 12h, Solar • Reduction of energy consumption by up to angle 20° 50%, in particular through the m
Slide 39: Greenhouse Effect
Greenhouse Effect Winter, December 21st , 12h, Solar angle 20° Mid-Season, September 21st , 12h, Solar angle 40° Summer, June 21st, 12h, Solar Angle 63° Winter nights, December
Slide 40: Thermal Comfort
THERMAL COMFORT Double lintel to reduce thermal bridges CLIMAPLUS® SUN DOUBLE GLAZING for South and West In summer 62% of solar energy is blocked outside. In winter, the cold wall effect is eliminated due to its very low U value 1.0W / (m².K) PB M 032 MULTIMAX ISOVER (ʎ=0.03 W/m·K) THERMAL INSULATIO
Slide 41: Thermal Comfort
THERMAL COMFORT Thicker layer of MULTIMAX ISOVER (ʎ=0.03 W/m·K) Thermal insulation. PB M 032 ISOVER MULTIMAX ISOVER (ʎ=0.03 W/m·K) Thermal insulation between Thermal insulation thermal insulation the brick and concrete
Slide 42: Thermal Comfort
THERMAL COMFORT Roof Floor Thermal insulation ISOVER CRAWL SPACE to avoid direct Thermal insulation FOR ROOF DACHOTERM G39 contact with the ground ISOVER DACHOTERM G39
Slide 43: Acoustic Comfort
ACOUSTIC COMFORT Glass mineral wool ISOVER Rigid glass mineral wool Acoustic Partition Roll (APR (ISOVER acoustic mineral wool) 1200) APR 1200 40mm STADIP® SILENCE Double Glazing, on HEAVY WALL protecting the railway side and park side. against outside noises (Brick150x230x450mm)
Slide 44: Waterproofing
WATERPROOFING Inclinaison 2% Top cover Waterproofing for roof “Couvertine” Waterproofing under Waterproofing above The window The window
Slide 45: Multi-Comfort Designer Calculations
Multi-Comfort Designer Calculations: Energy efficiency goal reached: 12.72 kWh/(m2a)
Slide 46: Thank You
THANK YOU
Compagnie De Saint-gobain — Investor Presentation (2021) on 6ix