  1. Slide 1: Investor Update at APPEA Conference

    Supplying East Coast Australia’s energy needs, sustainably and environmentally responsibly Investor Update at APPEA Conference May 2022 ASX:GAS

  2. Slide 2: Disclaimer

    Disclaimer Disclaimer Future Performance This presentation (Presentation) has been prepared by State Gas Limited (ACN 617 322 This Presentation contains certain “forward looking statements”. Forward-looking 488) (State Gas). The Presentation and information contained in it is being provided to state

  3. Slide 3: Highlights

    Highlights Long term high gas pricing Market signals are presenting the opportunity 2-stage plan for quick market access Reid’s Dome conventional gas Rolleston-West gas project Strategically located Close to infrastructure networks & Wallumbilla price hub Market optionality CSG & conventional gas, n

  4. Slide 4: Gas Market Dynamics

    Gas Market Dynamics Australian Gas Prices Rising Demand:  Europe looking for non-Russian gas supply LNG Netback 2022 (Historic &  Asian LNG demand strong Forward Price) Average $33.59 (as at 2 May 22)  Support required for volatile renewables  Long term requirement for gas for commercial & indus

  5. Slide 5: Regional Demand Growth will be Long-term

    Regional Demand Growth will be Long-term Asian demand growth to 2040 by source Asian spot purchases as % of imports Source: Shell LNG Outlook 2022 Will result in sustained export demand and price pressure 5

  6. Slide 6: East Coast: Looming Mid-term Supply Shortages

    East Coast: Looming Mid-term Supply Shortages ACCC Forecast Gas Supply and Demand, Southern States Big opportunities for new supplies Source: ACCC Gas Inquiry January 2022 Interim Report 6

  7. Slide 7: Seizing the market window…

    Seizing the market window… Target 2024 Growth to come Synergistic Development Optimised supply Reid’s Dome -a  No domestic gas  Rolleston-West  Adjacent Projects strategic launch pad: reservations  Aligned ownership  Conventional gas across region  CSG for regular pipeline quality  2 new land

  8. Slide 8: Updated Project Areas

    Updated Project Areas  Reid’s Dome, Rolleston-West & New Blocks  2630 km2 of combined acreage  PL 231 – 181 km2  ATP 2062 – 1414 km2  New blocks (Santos JV) – 1035 km2  Highly prospective Bowen Basin sequence  Multiple conventional and unconventional targets  No domestic gas reservation  Qu

  9. Slide 9: A Path to Rapid Development

    A Path to Rapid Development Reid’s Dome conventional gas  Pipeline quality gas, no produced water  Compression & dehydration the only “processing” required Small-scale export pipeline  Lower cost composite  ~60km length Route through Rougemont area  Near pipeline quality gas  Enable early-s

  10. Slide 10: The Path Forward

    The Path Forward Confirm Pipeline • Confirm route • Design • Permit Confirm Rougemont • New horizontal well potential • Production test threshold reached Build, Operate, Sell 10

  11. Slide 11: New Acreage Award

    New Acreage Award  State Gas & Santos QNT preferred tenderers  State Gas 35%, Santos 65% & operator  PLR2021-1-2  727 km2  Connecting State Gas’ Reid’s Dome & Santos interests to east  PLR2021-1-3  308 km2  two export pipelines passing through  Target: Bandanna coals – in production nearby

  12. Slide 12: Supply-Demand & Indicative Timing

    Supply-Demand & Indicative Timing ACCC Forecast Gas Supply and Demand, Southern States First Gas H2-21 H1-22Reid’sH2-22 Dome H1-23 H2-23 H1-24 H2-24 H1-25 H2-25 Confirm scope First Gas Rolleston-West Source: ACCC Gas Inquiry January 2022 Interim Report 12

  13. Slide 13: Carbon Management Project

    Carbon Management Project  JV with minerals explorer Rockminsolutions Pty Ltd  Buckland Basaltic Formation  70km2 area  200m-330m thick  Investigating decarbonisation options:  Advanced weathering  Low carbon cementitious material  In-situ carbon mineralisation (Carbfix process)  Western ed

  14. Slide 14: Executive Chairman quote on 3C resource and gas shortage

    “With nearly 400 PJs of geographically blessed 3C Resource in a tight gas market, State Gas’ task is to convert that resource into reserves in time to address the upcoming national gas shortage." Richard Cottee Executive Chairman State Gas 14

  15. Slide 15: Contact

    Contact Level 8 46 Edward Street Brisbane QLD 4000 Australia Email info@stategas.com stategas.com