Mammoth Minerals Limited · ASX:M79

Mammoth Minerals — Merger or Acquisition (November 2026)

18 slides from Mammoth Minerals's merger presentation, Nov 16, 2026

  1. Slide 1: Kilba Tungsten Project Acquisition Investor Presentation

    rsonal use only KILBA TUNGSTEN PROJECT ACQUISITION INVESTOR PRESENTATION NOVEMBER 2026 ASX: M79 mammothminerals.com.au

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains summary information about Mammoth Minerals Limited (Mammoth) (ACN 651 057 822) and is current as of Mineral Resource Estimates reported were previously reported by Tungsten Mining NL on 30 January 2015 in accordance with the JORC Code cover date. The information

  3. Slide 3: Kilba Tungsten Project: An Advanced, High-Grade, Strategic Asset

    Kilba Tungsten Project: An Advanced, High-Grade, Strategic Asset Why Kilba? rsonal use only Option to acquire an advanced Australian tungsten project: • Tier-1 location in the West Pilbara region of Western Australia • Established Mineral Resource: 7.2Mt at 0.19% WO3 (79% Indicated by tonnage) • Min

  4. Slide 4: An Industrial Metal with an Unstable Supply

    An Industrial Metal with an Unstable Supply Unique in its extremes, difficult to replace, and listed as critical or strategic by the US, EU, UK, Australia and Canada rsonal use only VERY HARD VERY HEAT RESISTANT VERY DENSE HARD TO REPLACE 9 Mohs 3,422 °C 19.25 g/cm³ None Cemented carbide (WC-Co). Cl

  5. Slide 5: Tungsten Demand: Critical Across High-Value Industries

    Tungsten Demand: Critical Across High-Value Industries Data Centres & AI • Tungsten hexafluoride (WF₆) gas used to form a microscopic, ultra-thin conductive film rsonal use only inside advanced semiconductors Tungsten First Use by Application • Tungsten is a key material in transistors and contact m

  6. Slide 6: Kilba Tungsten – A Different Market Landscape

    Kilba Tungsten – A Different Market Landscape Last Scoping Study was published in 2013 – tungsten market has changed in policy, pricing and buyer rsonal use only 2013 — when Kilba was studied 2026 — today's market W H AT K I L B A O F F ER S Restrictions on concentrate exports; China a Licensed expo

  7. Slide 7: A Substantial Existing Resource Provides the Foundation

    A Substantial Existing Resource Provides the Foundation Mineral Resource: 7.2Mt at 0.19% WO3 for 13,800t contained WO3 rsonal use only • 79% Indicated (by tonnage) – 5.7Mt at 0.20% WO3 • 21% Inferred – 1.5Mt at 0.15% WO3 Mineralisation • Tungsten occurs as disseminated scheelite within skarn rocks a

  8. Slide 8: Exploration Upside – Resource Open Along Strike and at Depth

    Exploration Upside – Resource Open Along Strike and at Depth Zone 11 Drilling – Shallow, Significant and Open rsonal use only • 13m at 1.01% WO3 from 59m 150m incl. 1m at 8.24% WO3 from 68m (KRC0157) • 14.5m at 0.80% WO3 from 42.5m (KDD0003) • 7m at 0.90% WO3 from 41m incl. 4m at 1.49% WO3 from 41m

  9. Slide 9: Mapped Skarn Targets Adjacent to Resources

    Mapped Skarn Targets Adjacent to Resources Along Strike Opportunities rsonal use only • Along strike continuations mapped at Zone 12 • Skarn targets mapped between Zone 11 and Zone 8 which are yet to be drill tested along ~850m strike Zone 12: Inf. 0.56Mt at 0.11% WO3 Total: 0.56Mt at 0.11% WO3 Rock

  10. Slide 10: 4.5km Strike of Mapped Skarn Targets – Yet to be Drill Tested

    4.5km Strike of Mapped Skarn Targets – Yet to be Drill Tested Mapping rsonal use only • 4.5km strike of skarn mineralisation targets mapped at surface • Untested ground under alluvial cover – geophysics proposed Drill Testing Zone 12 • None of the mapped 4.5km of strike of skarn targets have been dr

  11. Slide 11: What's Next: A Clear Path to Rapid Resource Delineation

    What’s Next: A Clear Path to Rapid Resource Delineation Structural Mapping rsonal use only • Determine optimal position and orientation of RC drilling to be undertaken Surface Sampling • Mapped skarns will be sampled to assist with target ranking and prioritisation • Initial focus on areas along str

  12. Slide 12: Transaction Structure and Near-Term News-Flow

    Transaction Structure and Near-Term News-Flow Pro Forma Capital Structure Upcoming News-Flow rsonal use only • Settlement of Tranche 1 Placement (19 Nov 2026) Existing Shares on Issue 558.9M Tranche 1 Placement at $0.026 (LR 7.1 capacity) 61.0M • Notice of AGM (Tranche 2 and Consideration Shares) Tr

  13. Slide 13: Strategic Partnership with AT4: Vertical Integration from Mine to APT

    Strategic Partnership with AT4: Vertical Integration from Mine to APT AT4 joins as a cornerstone shareholder with an exclusive right to 20% of offtake from the existing Kilba MRE rsonal use only MAMMOT H | K I L B A T U N G S T E N P R O J E C T ( 8 0 %) AT 4 | DEL SOL REFI NERY AND US MARKET KILBA

  14. Slide 14: Experienced Team to Drive the Next Phase

    Experienced Team to Drive the Next Phase Rob Jewson Glenn Poole Simon Lawson Kevin Puil rsonal use only Executive Chairman Managing Director Non-Executive Director Non-Executive Director Rob has a wealth of experience globally in corporate Experienced geologist with a proven track record in Mining E

  15. Slide 15: Key Takeaways: The Mammoth Investment Case

    Key Takeaways: The Mammoth Investment Case • Kilba Project acquisition provides a new flagship asset that ticks all the right boxes for shareholders: rsonal use only • Location: West Pilbara region of Western Australia – an established, Tier-1 mining district • Commodity: Tungsten has an exceptional

  16. Slide 16: Appendix: How Kilba Compares with Listed Tungsten Peers

    Appendix: How Kilba Compares with Listed Tungsten Peers Kilba matches its peers on grade and resource confidence, and is priced at a fraction of their in-ground value rsonal use only Meas. + EV Company / project Stage Mineral Resource Contained WO3 Ind. EV (A$M) A$/mtu EV US$/t W H AT TH E PEER S SH

  17. Slide 17: Appendix: Peer Mineral Resources by Category

    Appendix: Peer Mineral Resources by Category Category breakdown, grade, contained metal and reporting source for each peer resource estimate Tonnes Contained WO3 rsonal use only Project Deposit / component Category WO3 (%) Source of Mineral Resource estimate (Mt) (t) Kilba Tungsten Project Zones 8,

  18. Slide 18: Mammoth Minerals Limited

    MAMMOTH MINERALS LIMITED rsonal use only INVESTORS MEDIA Glenn Poole Nicholas Read Managing Director Read Corporate Mammoth Minerals Limited +61 8 9388 1474 +61 8 9322 2338 info@readcorporate.com.au info@m79.com.au www.mammothminerals.com.au ASX: M79 mammothminerals.com.au

Mammoth Minerals — Merger or Acquisition (November 2026) on 6ix