Ramelius Resources Limited · ASX:RMS

Ramelius Resources — Investor Presentation (July 2005)

21 slides from Ramelius Resources's investor presentation, Jul 27, 2005

  1. Slide 1: ee _ _ a Le We

    ee _ _ a Le We — — Lo _ 7 ee SS i Wh ge ee @ Le | . _ oe FO Ee ee Be - co oo : ee Gia i ha a _ — Lo. hee Be ae TETRA EEE is. WAC 082 57-58 oe a _ As — < _ : . Cl ane Z SMA VE EAE Ze MID

  2. Slide 2: Slide 2

  3. Slide 3: Slide 3

  4. Slide 4: Slide 4

  5. Slide 5: ee L Z Lo , Tee _ _. oo oo

    ee L Z Lo , Tee _ _. oo 2 oo 7 oo SS — - = — _ : i - ee ; | i 7 . _ DI ATL BD Lo oo } INZIN TY _ poe Co a _ |. _ | _ _: aC : NG A Tt r LL : 1 . _ “4 - : 7 - CC . a . -) a oe a7 a Le A oe We LC yy ye

  6. Slide 6: —

    —

  7. Slide 7: TET Mafic./ ultramafic rocks.

    TET 4 Mafic./ ultramafic rocks. Sediments & yoicaniclastic rocks: | WATTLE DAM PROJECT at | an Sill | il kel Deposits Mandilla Au North Widgiemooltha jckel Deposits Wi 1) Vi ne a, Nn inn a i (hii ie iy | na PROJECT

  8. Slide 8: - Spargos

    - Spargos = Reward (HILDITCH PROJECT| oo Lit Leh Matfic:/‘ultramafic:rocks Sediments &: voleaniclastic: rocks WATTLE DAM PROJECT q North Widgiemooltha % Nickel Deposits

  9. Slide 9: Spargoville/Widgiemooltha Gold Geochemistry Image and Tenure

    RAMELIUS RESOURCES PTY LTD SPARGOVILLE/WIDGIEMOOLTHA GOLD GEOCHEMISTRY IMAGE and TENURE 0 4km

  10. Slide 10: Mandilla Gold Project

    a E1g718 P15/4479 my 100ppb Gold Oppb Gold Spargoville 5A 6530000 mN Spargoville 5D 8,500 Prospect i previous drilling H B® k Andrews Shatt 4m @ 2.3g/t Au _ Breakaway Res. Lid am @ 269i qu mii recent drill intercepts m @ 1 ig/t Au H Spargovilie _|5m @ 13.18g/t Au is wy 5m @ 5.39g/t Au 8m @ 5.02g/ Au

  11. Slide 11: WMA

    WMA “on He DUAN Tia NN M ye

  12. Slide 12: Slide 12

  13. Slide 13: - Spargos

    - Spargos = Reward (HILDITCH PROJECT| oo Lit Leh Matfic:/‘ultramafic:rocks Sediments &: voleaniclastic: rocks WATTLE DAM PROJECT q North Widgiemooltha % Nickel Deposits

  14. Slide 14: Recent Drilling

    ue bo pete mn nn n= 5 ~~ — RECENTORILLING March 2008 {ea HRCO41 - 2m @ 1.1% Ni nd 0. 68% Cu from 74m Mineralisation open aiong Strike and at Dapth * HILDITCH NORTH - +— HILDITCH CENTI 5538000. mM J Yoramere Outre ; ui > 2600ppI i Bossarr Interpeetea Pant Magnetic Ubrernatic Rocks a Line 0 Pals Bang

  15. Slide 15: Hilditch Nickel Project Drillhole Cross Section

    HILDITCH NICKEL PROJECT DRILLHOLE CROSS SECTION HRC3 HRC2 Gossan yRe4 Ultramatic [asonRt: 1/1,40 1/3.30N1, 2/0.41 = 2metres @ 0.41% Ni 0.07 = 2matres @ 0.07% Cu 4 Jari 2005,

  16. Slide 16: Hilditch North

    Hilditch North LEGEND | _ Section 6837180mN . il Hole Coter : seoutoe nec Interpreted Geology and Mineralisation igh Mg Utrarmatic Matic Unit | GBB: 001M Utreratic AAA Sheared Contact —-= Contact Ramelius Resources Limited _ Hilditch North Interpreted Geology and Drilling KALGOORLIE.BOULDER COOLGARD

  17. Slide 17: Hilditch Project Interpretive Geology

    Ej Felsic rocks Porphyry intrusives RAMELIUS RESOURCES LTD HILDITCH PROJECT Ultramafic rocks Mafic rocks INTERPRETIVE GEOLOGY C3 MODELLED Section on 6,536,000mN CONDUCTOR Sediments

  18. Slide 18: —

    —

  19. Slide 19: a a c

    a a c / - a a ae ae _ — aaa | | Overburden Granodiorite Mafic rocks 85.4 metros / git Gold

  20. Slide 20: | il wl i eae

    | il wl i eae Il Wl Ne ion ae Il) iil ‘Ht be H wy nN : i) Ji > lo x ne ini Wi | | 1) ee

  21. Slide 21: Slide 21

Ramelius Resources — Investor Presentation (July 2005) on 6ix