Enka Insaat Ve Sanayi A.s — 2Q 2026 Earnings Presentation

45 slides from Enka Insaat Ve Sanayi A.s's earnings presentation, August 2026

  1. Slide 1: 2Q 2026 Presentation

    tlhe EnGinggipearst-s Better Fsture J tia i OR ad 2026 PRESENTATION

  2. Slide 2: Introduction

    Introduction 69 years of engineering & construction  596 projects in 61 countries have been completed or under construction with experience historical value of US$ 68.8 billion worldwide  Employs circa 25,000 personnel worldwide  Among the world’s top contractors since 1981 (Engineering News-Reco

  3. Slide 3: Commitments

    Commitments Our Mission Our Vision Our Values to design, build and deliver safe, to be one of the best and innovative define how we do work at ENKA. We will not high-quality, and cost-effective engineering & construction companies undertake or execute a project which construction projects on schedul

  4. Slide 4: Sustainability

    Sustainability ENKA, which operates in different sectors such as engineering and construction, energy, real estate and trade in many different geographies, has made a commitment to serve sustainable development in all its operations. The approach which ENKA has adopted to corporate sustainability is

  5. Slide 5: Our Business & Principles

    Sustainability Our Business & Principles  Maintains an Ethics & Compliance Program to  Combines its engineering expertise with cutting- ensure open, honest and transparent communication edge applications to benefit both the international with all stakeholders in accordance with applicable communit

  6. Slide 6: Our People & Community

    Sustainability Our People & Community  Respects human rights and assesses the human  Assesses potential health and safety impacts of its rights impacts of its investments and operations as services and products and eliminates any potential part of its social impact assessment process. adverse impa

  7. Slide 7: Our Planet

    Sustainability Our Planet  Assesses, measures and reports its environmental  Implements a waste management approach by impacts and develops plans and procedures to prioritizing elimination at its source and increasing reduce them. reuse and recycling in its businesses and promoting circular practi

  8. Slide 8: Shareholding

    SHAREHOLDING As of March 27, 2026 52,10% TARA FAMILY 8,33% FREE FLOAT AND OTHERS 31,41% 5,87% GÜLÇELİK FAMILY ENKA FOUNDATION * 1,20% out of 9,56% Free Float belongs to Tara Family members 8/45

  9. Slide 9: Financial Highlights

    Financial Highlights 2Q 2026 2025 2024 2023 TOTAL ASSETS 11.655 11.508 10.304 9.408 TOTAL EQUITY 8.819 8.710 7.920 7.325 CASH & MARKETABLE 5.536 5.725 5.520 5.195 SECURITIES REVENUE 1.904 3.966 3.065 3.226 EBITDA 347 858 706 647 EBITDA MARGIN (%) 18,2 21,6 23,0 20,1 NET PROFIT 414 917 753 714 NET MA

  10. Slide 10: Revenues by Business Lines

    REVENUES BY BUSINESS LINES 2Q 2026 2025 2024 2023 USD % USD % USD % USD % CONSTRUCTION 1.209 63,5 2.686 67,7 2.254 73,5 2.042 63,3 POWER GENERATION 364 19,1 674 17,0 328 10,7 701 21,7 REAL ESTATE 237 12,4 400 10,1 335 10,9 324 10,0 TRADE 144 7,6 308 7,8 279 9,1 277 8,6 ELIMINATION (50) (2,6) (102) (

  11. Slide 11: EBITDA by Business Lines

    EBITDA by Business Lines 2Q 2026 2025 2024 2023 USD % MRG USD % MRG USD % MRG USD % MRG CONSTRUCTION 137 39 11 492 57 18 496 60 19 346 53 17 POWER GENERATION 43 12 12 52 6 8 10 1 3 5 1 1 REAL ESTATE 135 39 57 239 28 60 206 29 61 220 34 68 TRADE 33 10 23 75 9 24 66 9 24 75 12 27 ELIMINATION (1) 0 0 0

  12. Slide 12: Share Capital Increases

    12/33 Share Capital Increases PREVIOUS SHARE INCREASED SHARE DATE INCREASE INCREASE (%) CAPITAL CAPITAL 25.02.2012 2.500 300 12,00 2.800 12.06.2013 2.800 400 14,29 3.200 21.05.2014 3.200 400 12,50 3.600 06.05.2015 3.600 400 11,11 4.000 23.05.2016 4.000 200 5,00 4.200 27.04.2017 4.200 400 9,52 4.600

  13. Slide 13: Dividend Payments

    13/33 Dividend Payments Amounts in Millions * Dividend Paid to Founder Shares 13/45

  14. Slide 14: Share Buyback

    Share Buyback YEAR ACTION SHARE AMOUNT EQUITY PERCENTAGE 2016 SHARE BUYBACK 8,4 Million 4,2 Billion 0,20% 2017 SHARE BUYBACK 9,2 Million 4,6 Billion 0,20% 2018 SHARE BUYBACK 30,0 Million 5,0 Billion 0,60% 2019 SHARE BUYBACK 40,0 Million 5,0 Billion 0,80% 2020 SHARE BUYBACK 37,5 Million 5,6 Billion 0

  15. Slide 15: Awards & Recognition

    Awards & recognıtıon  ENKA has once again secured its place on the prestigious ENR Top 250  ENKA was named ”The Most Admired Construction Company of Türkiye” 10 International Contractors list for the 44th consecutive year. In the 2025 ENR years in a row by Turkish business and economics magazine “

  16. Slide 16: HSSE Achievements

    Hsse achıevements Dradenau Combined Heat and Power Plant Samawa 750 MW CCPP – Phase I  The “Merit” award at the International Safety Awards  8,200,000 Person-Hours without LTI by the British Safety Council in 2025  Achieved Distinction in International Safety Awards by British Safety Council Misu

  17. Slide 17: Engineering & Construction

    ENGINEERING & CONSTRUCTION ENKA provides full range of design and engineering, procurement, in-house fabrication, modularization construction, commissioning and start-up, operation and maintenance, and project management services (EPCC, EPC, PC or C only) in the following sectors: OIL, GAS & Power P

  18. Slide 18: Backlog

    Oil, Gas & Petrochemicals $1.476 BACKLOG Power Plants $2.407 18% Manufacturing $1.468 17% 29% Building Works $2.209 Infrastructure 26% $826 10% All figures given above are in Million US Dollars The group «Others» consists of the following countries: Australia, Dominican Republic, France, Malesia, Mo

  19. Slide 19: Central Processing Facility of AGUP Phase 2

    THE CENTRAL PROCESSING FACILITY OF ASSOCIATED GAS UPSTREAM PROJECT (AGUP) PHASE 2 PROJECT DESCRIPTION The contract covers the design and construction of a new facility capable of handling a peak production of 221,000 barrels of oil per day (210,000 bpd at 95% availability). The Central Processing Fa

  20. Slide 20: Nasiriyah 921.8 MW Combined Cycle Power Plant

    NASIRIYAH 921.8 MW COMBINED CYCLE POWER PLANT PROJECT DESCRIPTION The consortium formed by our 100% owned subsidiary Entrade GmbH and Siemens Energy Global GmbH & Co. KG has signed a turnkey contract with the Ministry of Electricity of Iraq for the construction of a 921.8 MW natural gas combined cyc

  21. Slide 21: Bazian-II Power Plant Conversion Project

    BAZIAN-II POWER PLANT CONVERSION PROJECT PROJECT DESCRIPTION ENKA has signed a lump sum turnkey contract with Taurus Arm for Power Generation for the conversion of the existing Bazian power plant into a combined cycle facility, located in Sulaymaniyah, Iraq. The project involves the conversion of an

  22. Slide 22: Low Carbon Hydrogen Production Plant

    LOW CARBON HYDROGEN PRODUCTION PLANT PROJECT DESCRIPTION On January 15th, 2025, ENKA UK Construction Ltd., a subsidiary of ENKA İnşaat ve Sanayi A.Ş., and Essar Energy Transition (EET) Hydrogen, signed a contract for the UK’s leading large-scale Low Carbon Hydrogen Production Plant (HPP1) at the Sta

  23. Slide 23: Propylene Splitter Unit Project İzmit & İzmir Refineries

    Propylene Splitter Unit Project İzmİt & İzmİr Refineries PROJECT DESCRIPTION ENKA signed contracts with TÜPRAŞ (Türkiye Petrol Rafinerileri A.Ş.) for the Propylene Splitter Unit Project for İzmit Refinery and İzmir Refinery on 24.04.2024. ENKA will carry out the detailed engineering, procurement, co

  24. Slide 24: Morava Corridor Motorway

    2024 IRF GLOBAL ROAD ACHIEVEMENT AWARD FOR Morava Corridor Motorway ENVIRONMENTAL STEWARDSHIP PROJECT DESCRIPTION ENKA and its joint venture partner Bechtel have been selected by the Government of the Republic of Serbia to design and build the 112 km Morava Corridor Motorway Project which will conne

  25. Slide 25: Corridors 8 & 10d Motorway

    Corrıdors 8 & 10d Motorway PROJECT DESCRIPTION ENKA, with its joint-venture partner Bechtel, will build 109 km Corridor 8 & 10d Motorway Project in North Macedonia and will complete it within 5 years. Corridor 8 (Tetovo – Gostivar - Bukojcani and Trebenista – Struga - Kjafasan Motorway section) is a

  26. Slide 26: Hinkley Point C Turbine Island Piping Works

    Hinkley Point C Nuclear Power Plant Turbine Island Piping Prefabrication & Erection Works and Insulation & Painting Works PROJECT DESCRIPTION ENKA UK Construction Ltd., a subsidiary of ENKA İnşaat ve Sanayi A.Ş., is contracted by one of the main contractors on the HPC Site to prefabricate, install a

  27. Slide 27: Shotton Paper Mill Project

    SHOTTON PAPER MILL PROJECT PROJECT DESCRIPTION ENKA signed a contract for the construction of a Paper Mill Factory on the Dee Estuary in Flintshire, North Wales for Shotton Mill Limited owned by Modern Karton/EREN Holding, one of the biggest manufacturers of paper, cardboard and corrugated packaging

  28. Slide 28: Dradenau Combined Heat and Power Plant

    Dradenau Combıned Heat and Power Plant PROJECT DESCRIPTION On 15 September 2021, The ARGE Uniper-ENKA Dradenau (UEJV) partnership signed a contract with Hamburger Energiewerke GmbH (former Wärme Hamburg GmbH) for the turnkey construction of approximately 180 MW electric and district heating capacity

  29. Slide 29: Stade Liquefied Natural Gas Regasification Terminal

    Stade Liquefied Natural Gas Regasification Terminal PROJECT DESCRIPTION ENKA’s wholly owned subsidiary Entrade GmbH, in a consortium formed together with Técnicas Reunidas and FCC Industrial, has signed an EPC (Engineering, Procurement and Construction) contract with the Hanseatic Energy Hub company

  30. Slide 30: Temane 456 MW Independent Power Plant

    TEMANE 456 MW INDEPENDENT POWER PLANT PROJECT DESCRIPTION ENKA signed a contract with Central Térmica De Temane S.A. (CTT) for construction works and services related to the 456 MW Temane Independent Power Plant Project in Temane, Mozambique. The project is scheduled for completion within 23 months.

  31. Slide 31: Engineering & Fabrication

    Visit website ENGINEERING & www.cimtas.com FABRICATION ÇİMTAŞ, a subsidiary of ENKA, is a leading provider of integrated engineering, procurement, welded fabrication, assembly and installation solutions for top-tier global customers. ÇİMTAŞ was incorporated in 1973 in Türkiye as a local steel fabric

  32. Slide 32: Engineering & Fabrication

    ENGINEERING & FABRICATION ÇİMTAŞ provides the following services for Power, Oil & Gas, Chemicals, Offshore, Mining & Metals Industries:  Engineering (Structural, Pressure Vessels, Piping, Plant Engineering)  Manufacturing (LSAW Pipes, Fittings, Flanges & Branch Connections) and Fabrication (7 shop

  33. Slide 33: Foundation Engineering

    Foundatıon Visit website engıneerıng www.kasktas.com.tr KASKTAŞ, wholly owned subsidiary of ENKA, was established in 1957 as the piling group of ENKA. Having a vast and modern machinery and equipment fleet, KASKTAŞ has the ability to fulfill diverse requirements in the field of geotechnical engineer

  34. Slide 34: Real Estate

    Real estate ENKA designed, developed and now operates 1.35 million m² of real estate assets in Russian Federation, including A-class offices occupied by dozens of international tenants, shopping malls, a 5 star luxury hotel. All assets are located in Moscow, except 1 shopping TYPE NET LEASABLE AREA

  35. Slide 35: Real Estate

    Real estate RENTAL YEAR EBITDA EBITDA MARGIN REVENUE 2Q 2026 237 135 57,0% 2025 400 239 59,8% 2024 335 206 61,5% 2023 324 220 67,9% 2022 344 194 56,4% 2021 304 194 63,8% 2020 289 187 64,7% All figures given above are in Million US Dollars. 35/45

  36. Slide 36: Data Centers

    DATA CENTERS New Investments ENKA Data Solutions will operate next-generation data centers, delivering reliability, connectivity, and performance at scale. Tuzla Data Center As part of the Data Solutions portfolio, the construction of a data center in Tuzla, İstanbul is currently underway, with an I

  37. Slide 37: Power Generation

    Visit website POWER GENERATION www.enkapower.com ENKA is the leading electricity generator (IPP) with its power plants located in Gebze, Adapazarı and İzmir in Türkiye. The gas fired combined cycle plants have a total installed capacity of 4,000 MW. ENKA’s power plants are among Türkiye’s earliest a

  38. Slide 38: Power Generation: Kırklareli Combined Cycle Power Plant

    POWER GENERATION New Investment Project ENKA Kırklareli Combined Cycle Power Plant The new investment project is fully owned by ENKA and has been financed by equity. The power plant is located in Kırklareli Babaeski. Approximately 200 kilometers away from Istanbul. It has a total production capacity

  39. Slide 39: Power Generation: Kameno Solar PV Power Plant

    POWER GENERATION Kameno Solar Photovoltaic Power Plant Town Up 8 LTD., a wholly owned subsidiary of ENKA, has developed a 45 MWp Solar Photovoltaic Power Plant in Burgas, Bulgaria. The plant is expected to generate approximately 63 GWh of clean electricity annually, supporting regional decarbonizati

  40. Slide 40: Türkiye's Generation 2024-2025

    POWER GENERATION TÜRKİYE’S GENERATION 2024 2025 CHANGE Billion Kwh % Billion Kwh % Kwh COAL 122.2 38.1 121.4 37.6 HYDRO 74.6 23.3 57.2 17.7 NATURAL GAS 63.4 19.8 78.4 24.3 WIND 36.5 11.4 39.2 12.2 GEOTHERMAL 10.2 3.2 10.6 3.3 OTHERS 14.6 4.5 17.6 5.5 INTERNATIONAL [NET] (0.9) (0.3) (2.0) (0.6) TOTAL

  41. Slide 41: Türkiye Electricity Consumption

    POWER GENERATION BILLION Kwh CHANGE % 10% 300 8% 6% 250 4% 200 2% 0% 150 -2% 161 175 190 198 194 210 230 242 246 255 264 275 290 292 290 291 315 311 309 321 322 100 -4% 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 41/45

  42. Slide 42: Enka Pazarlama

    tRADE Visit website Enka pazarlama www.enka.com.tr ENKA Pazarlama is a leader in the supply of heavy construction and lifting equipment and machinery and industrial machinery. It serves the whole of Türkiye through its five regional branches, one sales office, one liaison office and 65 dealers. ENKA

  43. Slide 43: ENTAŞ

    tRADE ENTAŞ Established in 1976 and became a member of the International Air Transport Association in 1982, ENTAŞ, a fully owned subsidiary of ENKA, provides services in the field of travel and tourism, including domestic and international tour operations, flight ticket sales, congress and event org

  44. Slide 44: Enka Foundation

    Enka FOUNDATION Visit website www.enkavakfi.org The ENKA Foundation was founded in 1983 with the idea of preserving the strong tradition of foundations in Turkish culture and sustaining the concepts that are the building blocks of civilization. The natural mission of the foundation is to educate ind

  45. Slide 45: Contact details

    Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul Tel: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 376 19 80 E-mail: enka@enka.com Web: https://www.enka.com 45/45