Lomiko Metals Inc.

Lomiko Metals — Investor Presentation (January 2024)

41 slides from Lomiko Metals's investor presentation, January 2024

  1. Slide 1: Developing a strategic stockpile of critical mineral graphite and lithium properties

    Developing a strategic stockpile of critical mineral graphite and lithium properties in Quebec for a North American climate success story January 2024

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation is not a prospectus, offering memorandum or an advertisement and is being provided for information purposes only and does not constitute or form part of, and should not be construed as, an offer or invitation to sell or any solicitation of any offer to purchase or subscr

  3. Slide 3: Land Acknowledgement

    Land Acknowledgement We would like to begin by acknowledging that the land/projects where we operate are located within the traditional land of the Algonquin Anishnaabeg and Cree Eeyou Istchee Peoples. Our vision is to embrace Indigenous people and Indigenous values within our projects to develop a

  4. Slide 4: The Lomiko Advantage

    The Lomiko Advantage Potential for Wealth Creation Diverse & Experienced Team 15 year life of mine (PEA) and Values driven, energetic and additional claims in region experienced management team Premium Product • 70% fines in flake distribution – anode profile Strong Partnership Focus • Located in st

  5. Slide 5: Lomiko – a responsible operator of choice: a leader in 2023

    Lomiko – a responsible operator of choice A leader in 2023 ✓ Increase of 184% in tonnage for the Indicated Mineral Resource category in updated 2023 MRE – the largest southernmost graphite resource in Canada ✓ Met with many local community members and communicated with mayors throughout 2023 ✓ Demon

  6. Slide 6: Lomiko collaborations

    LOMIKO Lomiko collaborations € ss ¢ WA Investissement CRITM LOLS iN = Quebec vactour de tronaformation ndtique International SOMUEM ._.. Canada . National Research UNIVERSITE Council Canada LAVAL Conseil national de recherches Canada ATTRIBUTES EVALUATED: ULCOM/EL NRC-IRAP Industrial Research Assist

  7. Slide 7: www.lomiko.com TSXV: LMR OTC: LMRMF FRANKFURT: DH8C

    www.lomiko.com TSXV: LMR OTC: LMRMF FRANKFURT: DH8C 7

  8. Slide 8: Ranked as the seventh biggest deposit worldwide by Mining.COM

    Lomiko advantage: Ranked as the seventh biggest deposit worldwide by Mining.COM Source: Company filings 8

  9. Slide 9: Market for Graphite

    Market for Graphite 9

  10. Slide 10: PRC announces natural flake and synthetic graphite export restrictions

    PRC announces natural flake and synthetic graphite export restrictions • Restrictions set in December 2023 • China has declared its intention to implement export permits for certain graphite products to safeguard national security. This move is part of China's broader strategy to regulate the supply

  11. Slide 11: Electric Vehicle Market & Outlook

    Electric Vehicle Market & Outlook + Rocks and Stocks + January 2024 North American Market: EV Sales ‘000 sales 240 Husa Canada 180 120 60 ie) Jan- Apr- Jul- = Oct- — Jam-)— Apr- — Jul- = Oct- Jan- — Apr- — Jul- = Oct- = Janm-—s Apr- ss Jul- — Oct- 21 21 21 21 22 22 22 22 23 23 23 23 24 24 24 24 202

  12. Slide 12: The EV market is in high growth mode

    The EV market is in high growth mode • International Energy Agency (IEA): the number of electric cars, vans, trucks and buses on roads is forecast to grow from 11M in 2020 to 145M by 2030 (Right) • In 2022, China accounted for over 50% of all EVs on the road (13.8M of 26M globally) The surging EV ma

  13. Slide 13: Lomiko can provide 10% of North American graphite

    Lomiko can provide 10% of North American graphite A massive increase in battery plant capacity - most to start production from 2025-2030 • A wave of new planned electric vehicle battery plants will increase North America’s battery manufacturing capacity from 55 GWh/year in 2021 to nearly 1,000 GWh/y

  14. Slide 14: Graphite shortfall starting in 2023

    Graphite shortfall starting in 2023 Shortfall to increase to 8Mt by 2040 Projected Anode Demand (Mt) Graphite Market Balance - Projected Demand and Supply (Mt) 12,000,000 9,000,000 8,000,000 DEMAND IS EXPECTED TO 10,000,000 EXCEED SUPPLY BY 2023 – 7,000,000 AND CONTINUE BEYOND 6,000,000 8,000,000 La

  15. Slide 15: La Loutre Graphite Project

    La Loutre Graphite Project 15

  16. Slide 16: La Loutre PEA details

    La Loutre PEA details • Two known deposits currently being explored: EV Carmin Zone and Battery Zone Zone • LOM plant production of 21.8 Mtonnes of mill feed at 6.78% Cg diluted EV Zone • Graphite concentrate production at 1.43 Mtonnes Battery grading 95.0% Cg Zone • 14.7-year mine life producing 10

  17. Slide 17: Achieving 184% Increase in Tonnage Indicated Mineral Resources

    Achieving 184% Increase in Tonnage Indicated Mineral Resources La Loutre Resource Estimate (Effective Date: March 31, 2023) - PFS Source: InnovExplo March 2023 2023 MRE 2021 MRE Deposit EV Battery TOTAL EV Battery TOTAL Cut-off (%) Cg 1.5 1.5 1.5 1.5 1.5 1.5 Indicated Tonnage (kt) 24,267 40,429 64,6

  18. Slide 18: La Loutre graphite project close to infrastructure with great geological setting

    La Loutre graphite project close to infrastructure with great geological setting • 50% complete Preliminary Feasibility Studies (“PFS”) Phase I complete • Phase II La Loutre Graphite Project To PFS for La Loutre Cost ($M) Mining Plan $0.3 Mining Geotechnical $0.9 Power and Access Road Study $0.2 Inf

  19. Slide 19: La Loutre half-cell battery testing surpassed commercial graphite results

    La Loutre half-cell battery testing surpassed commercial graphite results ✓ Demonstrated that La Loutre material is suitable for battery applications – half-coin battery testing with Polaris Battery Labs, LLC, USA, is demonstrating higher reversible capacity compared to commercially available graphi

  20. Slide 20: La Loutre Graphite Met Studies - Summary

    La Loutre Graphite Met Studies - Summary ✓ SGS & Metpro Characterization Study, Feb 2023: 640kg core sample that was homogenized and used to test the graphite mineralization. Optimization of the flotation circuit resulted in achieving 94.7% recovery and reconciled LCT (Locked Cycle Testing) testing

  21. Slide 21: SGS Characterization Study, 2023: 70% fines content

    SGS Characterization Study, 2023 70% fines content in the flotation concentrate • Developed and optimized PFS level flotation plant flowsheet -LCT testing achieved 94.7% recovery and 98.6% - 99.1% Cg reconciled grade • La Loutre flake distribution is ~70% fines - suitable for anode market 37% growth

  22. Slide 22: La Loutre metallurgical program 99.99% purified graphite content

    La Loutre metallurgical program 99.99% purified graphite content ✓ Completed PFS level met testing and optimized flow sheet ✓ Completed value-added testing with ProGraphite – micronization, spheroidization, and purification: ✓ Proved that La Loutre material is suitable for battery applications - Sph

  23. Slide 23: La Loutre graphite development milestones

    La Loutre graphite development milestones • Permitting and capital dependent PFS Pilot Plant Testing Feasibility Study Permitting Construction Production 2024 2025 2026 2027 2028 23

  24. Slide 24: Lomiko Exploration Potential

    Lomiko Exploration Potential 24

  25. Slide 25: Graphite: Carmin

    Graphite: Carmin Carmin - historic PFS contiguous to La Loutre Carmin The original historical estimate contemplated certain assumptions Zone A where the mineral resources are stated as Proven and Probable resources for Sites A and B. • Site A: total 1.55 Mt at 10.0% Cg Proven: 1.47 Mt at 10.29% Cg (

  26. Slide 26: Regional exploration in Grenville belt

    Regional exploration in Grenville belt Most prospective graphite belt in North America • Completed 1,518-line kilometers of heliborne geophysical surveys completed over the six graphite properties, with 55 targets identified • 264 claims in total on 6 early-stage projects covering 15,639 hectares in

  27. Slide 27: Lithium exploration on massive claim package on Nemaska lithium corridor

    Lithium exploration on massive claim package on Nemaska lithium corridor Bourier Property 27

  28. Slide 28: Lithium exploration on massive claim package on Nemaska lithium corridor

    Lithium exploration on massive claim package on Nemaska lithium corridor Bourier • 49% ownership achieved • 203 claims for a total ground position of 10,252 hectares (102 km2) that boasts other lithium deposits and known lithium mineralization • Bourier consists of volcano-sedimentary units, a seque

  29. Slide 29: Lomiko Advantage

    Lomiko Advantage 29

  30. Slide 30: NPV scenario analysis: positively leveraged to graphite price increases

    NPV scenario analysis: Positively leveraged to expected graphite price increases • PEA used a graphite concentrate selling price of US $916/t (basket price) • The current forecast selling price for +94%Cg is US $1,070/t of graphite concentrate (source: Benchmark / Lone Star) • Current public informa

  31. Slide 31: Concentrate Grade and NPV/Capex Multiple

    Lomiko advantage: Concentrate Grade and NPV/Capex Multiple • Updating the Lomiko PEA for USD $1,500/t Graphite selling price improves on current solid project returns. • The La Loutre project combines high-grade coventrate with compelling economics of a post-tax IRR of 43%, post- tax NPV of $520M, a

  32. Slide 32: High Quality project with low capital requirements combined with High-Grade Graphite Concentrate

    Lomiko advantage: High Quality project with low capital requirements combined with High-Grade Graphite Concentrate Project Location Africa/Europe North America 32

  33. Slide 33: Cut-Off Grade & Graphite Con Grade

    Lomiko advantage: Cut-Off Grade & Graphite Con Grade Lower cost and higher recovery Project Location Africa/Europe North America 33

  34. Slide 34: PEA: The La Loutre project delivers 97.4kt/year over a 15-year mine life

    PEA: The La Loutre project delivers 97.4kt/year over a 15-year mine life – PEA only, expansion possible Lomiko – La Loutre Operating Graphite Mines Source: Company filings 34

  35. Slide 35: Capital Structure

    Capital Structure As at Jan 20, 2024 Shares Issued & Outstanding 400.7M Market Cap $6.0M Options 24.3M Cash* $1.5M Warrants 143.0M Debt $- Share Units (PSU/RSU/DSU) 12.2M Total Enterprise $4.5M Value * Cash balance from interim financials – October 31, 2023 Fully Diluted 580.2M Source: Company Data

  36. Slide 36: Diverse leadership & Experienced team, board and advisors

    Diverse leadership & Experienced team, board and advisors MANAGEMENT TEAM BOARD OF DIRECTORS Belinda Labatte, CEO, CFA, MBA, ICD.D Sagiv Shiv, Lead Independent Director and Chair of Audit Committee 1,3 20 years experience in capital markets. Fluent in French. Served as Chief Head of M&A at ACP Capit

  37. Slide 37: For more information

    For more information info@lomiko.com Follow us @lomikometals on socials l l l f l

  38. Slide 38: 97 graphite mines needed to fuel the EV revolution

    97 graphite mines needed to fuel the EV revolution How many mines do we need? • Benchmark forecasts how many mines need to be built in the short time frame to keep up with exceptional volumes of demand needed for key raw materials expected by 2035 • La Loutre is positioning itself for success as a r

  39. Slide 39: La Loutre: PEA Layout – great base to build on

    La Loutre: PEA Layout – great base to build on Mine layout and costs – PEA • Waste rock and tailings co-disposed • Efficient site water management with WASTE ROCK & no wet tailings EV ZONE CODISPOSAL PILE • Pits sequenced to maximize the returns starting from North – EV Pits to South – Battery Pits

  40. Slide 40: A responsible operator with track record of execution

    A responsible operator with track record of execution Studies completed ✓ Completed 13,000m+ of drilling at La Loutre with exceptional results ✓ Completed NI-43-101 mineral Resource for La Loutre ✓ Completed 12 months of environmental baseline studies ✓ Completed pre-feasibility metallurgical test p

  41. Slide 41: Lomiko achieved UL ECOLOGO certification

    Lomiko is pleased to announce that it has achieved UL ECOLOGO certification® What is it? - Ecologo (UL) is a certification specifically designed for mineral exploration. It contributes to the establishment of a social license within the socio-economic ecosystem of projects, in full transparency. - I

Lomiko Metals — Investor Presentation (January 2024) on 6ix