Breaker Resources NL

Breaker Resources NL — Precious Metals Summit, Beaver Creek 2022

26 slides from Breaker Resources NL's conference presentation, Sep 14, 2022

  1. Slide 1: From Discovery to Development, 1.7Moz and Growing

    FROM DISCOVERY TO DEVELOPMENT, 1.7MOZ AND GROWING Precious Metals Summit, Beaver Creek, 14 September 2022 1

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation may not be dist

  3. Slide 3: An Emerging Gold Developer

    AN EMERGING GOLD DEVELOPER Lake Roe Gold Project – 100km East of Kalgoorlie WA Lake Roe Project - A 1.7Moz deposit in an emerging greenfields gold district in Western Australia, the world’s No.1 ranked mining jurisdiction  Virgin high-grade gold discovery; gold within 5m of surface, at least 800m d

  4. Slide 4: Bombora: 3.5km Strike Length, High-Grade at Surface & at Depth

    BOMBORA: 3.5KM STRIKE LENGTH…HIGH-GRADE AT SURFACE & AT DEPTH Long Section Looking West Large-scale with kilometric continuity Open all directions Amenable to open pit and underground mining #ASX Release 13/09/2022 4

  5. Slide 5: Systematic Resource Growth Over 5 Year Period

    SYSTEMATIC RESOURCE GROWTH OVER 5 YEAR PERIOD  Discovery cost AUD$40/oz over a 5 year period (it pays to drill)  1.7Moz Open Pit and Underground Resource  1,684,000oz @ 1.6g/t Au (Global; Optiro Pty Ltd, Dec 2021)  Open Pit Component 1,025,000oz @ 1.3g/t (0.5g/t cut-off) incl. 739,000oz @ 2.0g/t

  6. Slide 6: Corporate Overview

    CORPORATE OVERVIEW Key Metrics  A$ 27M in cash/listed shares Milestone payments of up to A$20M from free-carried lithium JV ASX Code BRB  Strong US institutional backing; strong management equity position Cash & Investments A$27.6m  Electrum 1 Cash A$11.7m  Paulson and Co 2 ASX listed shares A$1

  7. Slide 7: Located in Epicentre of Australian Gold Mining

    LOCATED IN EPICENTRE OF AUSTRALIAN GOLD MINING Concealed by thin, transported cover On eastern margin of world class Kalgoorlie-Kurnalpi Rift Zone1  100km east of Kalgoorlie, the heart of Australian gold mining  Australia is world 3rd largest gold producer 150m wide (315t) after China (332t) and R

  8. Slide 8: Strategic Location

    STRATEGIC LOCATION Lake Roe Project Regional Geology  Situated between two operating gold mines (Carosue Dam and Karonie)  600km2 area with good road/rail access  50km of prospective strike  Granted mining lease  Targeting a 100-150Koz pa standalone gold operation  Between two converging regio

  9. Slide 9: Bombora, Part of Much Larger System

    BOMBORA, PART OF MUCH LARGER SYSTEM Plan View of 9km Gold System 150m wide mineralised zone Crescent-Kopai  A partly drilled gold system extending over 9km inside 50km of strike  Essentially no outcrop so we use aircore drilling as first pass test 150m wide  Three discoveries so far with many are

  10. Slide 10: Bombora, Regular, Repetitive and Predictable Lodes

    BOMBORA, REGULAR, REPETITIVE AND PREDICTABLE LODES* A: Typical steep lode with strong silica-albite-biotite-pyrrhotite alteration (Tura Lode; 5.25m @ 12.71g/t#) B: Gold in steep lode C: Gold in flat lode quartz vein D: West-dipping quartz stockwork (Mindil Lode; 7m @ 32.66g/t^) (North Point 1; 2.9m

  11. Slide 11: Favourable for Open Pit & Underground Mining

    FAVOURABLE FOR OPEN PIT & UNDERGROUND MINING Bombora: Perspective View of RC and Diamond Drilling with all Mineralisation Wireframes #  40m x 20m drill spacing in open pit area to ~200m below surface  Kilometric scale – all lodes which occur in a regular predictable way  80m-spaced sections below

  12. Slide 12: Favourable Open Pit Configuration

    FAVOURABLE OPEN PIT CONFIGURATION Bombora: Cross section along 6602120mN Ounces per vertical metre  The most common style of gold deposit in Australia (dolerite-hosted gold lodes)  Individual lodes up to 2km long Kilometric-scale continuity on all lodes significantly de-risks future mining Indicat

  13. Slide 13: Favourable Open Pit & Underground Studies

    FAVOURABLE OPEN PIT & UNDERGROUND STUDIES  April 2022 open pit study1 at Bombora points to a large, single open pit extending over 3km  Potential to fund capex from 1km-long Northern starter open pit  Preliminary underground study2 indicates potential for A$1,100/oz UG production cost 1km norther

  14. Slide 14: Tura-Style Steep Lode - Good for UG Mining

    TURA-STYLE STEEP LODE - GOOD FOR UG MINING Tura Lode long-section (steep lode)1  Tura lode – high-grade continuity over 900m (open)  One of eight south-plunging steep lodes (2m-5m ETW)  Recent 40m-spaced infill drilling has confirmed continuity Tura Lode: BBRD1135 - 11.82m @ 22.26g/t Au2 1 ASX Re

  15. Slide 15: Strike-Extensive High-Grade Flat Lodes

    STRIKE-EXTENSIVE HIGH-GRADE FLAT LODES Perspective View of 2km-long Northern Flat Lode Array1  2.2km strike length of stacked, high-grade flat lodes  Infill drilling in progress  Has the grade and continuity for underground mining  2m - 10m Estimated True Width 1ASX Releases 9 March 2021, 10 Jun

  16. Slide 16: Metallurgical Testwork – Three Phases, No Issues

    METALLURGICAL TESTWORK – THREE PHASES, NO ISSUES  Excellent gold recovery in oxide and fresh rock1 96%-99% in oxide and fresh (freshwater) 92% in saline site water  High gravity gold 45%  Moderate hardness – modest energy consumption  Amenable to conventional processing (no deleterious elements)

  17. Slide 17: Our Timeline

    OUR TIMELINE Bombora Bombora Resource Resource Planned Phase 1 Discovery Maiden Upgrade Upgrade Resource PFS First RC drill 81% of Resource is drilled 1.7Moz @ 1.6g/t intersections 624,000oz at 1.6g/t to indicated category April 2016 September 2019 December 2021 ~ 6 months April 2018 Extensional & R

  18. Slide 18: Proven Execution Team

    PROVEN EXECUTION TEAM Peter Cook Tom Sanders Non-Executive Chairman Managing Director Geologist and proven mine Founding Director and geologist developer with over 35 years’ with over 35 years experience experience in mining, exploration in exploration, mining and and corporate management. corporate

  19. Slide 19: What Makes Breaker Different?

    WHAT MAKES BREAKER DIFFERENT? √ A large 1.7Moz deposit in an emerging greenfields gold district in world No.1 ranked mining jurisdiction √ Mining potential extensively de-risked (limited downside) Demonstrated growth potential (huge upside) √ Outstanding value proposition √ Well funded with $27M cas

  20. Slide 20: Thank You

    THANK YOU AN EMERGING AUSTRALIAN GOLD PRODUCER WITH 1.7 MILLION OUNCES Precious Metals Summit, Beaver Creek, 14 September 2022 20

  21. Slide 21: Appendix 1: Peer Comparison (ASX-Listed Developers)

    APPENDIX 1: PEER COMPARISON (ASX-LISTED DEVELOPERS) Enterprise Value per Global Resource Ounce (AUD$/oz)* Breaker Resources NL Enterprise Value/ Gold Resource oz Grade g/t gold 0.6g/t 1.1g/t 1.2g/t 1.2g/t 1.3g/t 1.6g/t 1.6g/t 2.3g/t Open Pit or UG OP OP OP/UG OP OP OP/UG OP/UG OP/UG Increasing Grade

  22. Slide 22: Appendix 2: Peer Comparison Source Data

    APPENDIX 2: PEER COMPARISON SOURCE DATA STN DEG AUC MAU KIN GMD BRB MGV Shares (Appendix 2A/3B) 29/07/2022 1/08/2022 6/07/2022 22/07/2022 25/08/2022 31/08/2022 24/09/2020 12/08/2022 Price (ASX close) 10/09/2022 10/09/2022 10/09/2022 10/09/2022 10/09/2022 10/09/2022 10/09/2022 10/09/2022 Debt (Quarte

  23. Slide 23: Appendix 3: Valuable Free-Carried Lithium Interest

    APPENDIX 3: VALUABLE FREE-CARRIED LITHIUM INTEREST  High-grade spodumene discovery within Lake Roe Gold Project  Joint Venture with Global Lithium Resources (affects ~10% of Lake Roe tenement package) 20% interest free-carried to completion of positive BFS…ongoing milestone payments of up to A$20M

  24. Slide 24: Appendix 4: Ularring Project: Another Discovery in Wait?

    APPENDIX 4: ULARRING PROJECT: ANOTHER DISCOVERY IN WAIT?  A 228km2 project located 100km east of Perth Pegged in 2014, now part of a new mineral province 45km east of world-class Julimar discovery (Chalice Mining)  Indications of a Large Gold-Copper-(Tungsten) System  Historical drill intersectio

  25. Slide 25: Appendix 5: Lake Roe Mineral Resource

    APPENDIX 5: LAKE ROE MINERAL RESOURCE# Lake Roe Global Base Case Cut-off Grade Category Tonnes Grade Ounces Indicated 15,153,000 1.46 712,000 Bombora Open Pit above 100mRL 0.5 Inferred 2,703,000 1.3 111,000 (87% Indicated) Subtotal 17,856,000 1.4 824,000 Indicated 710,000 2.88 66,000 Bombora Undergr

  26. Slide 26: Appendix 6: Manna Lithium Resource

    APPENDIX 6: MANNA LITHIUM RESOURCE* Resource Category Tonnes (Mt) Li2O (%) Ta2O5 (ppm) Inferred 9.9 1.14 49 Total 9.9 1.14 49  Reported above a cut-off grade of 0.55% Li2O  Tonnages and grades have been rounded to reflect the relative uncertainty of the estimate  GL1 has an 80% interest in the Ma

Breaker Resources NL — Precious Metals Summit, Beaver Creek 2022 on 6ix