Variscan Mines Limited · ASX:VAR

Variscan Mines — Shareholder Meeting (November 2025)

40 slides from Variscan Mines's shareholder meeting presentation, Nov 28, 2025

  1. Slide 1: Spain's Next High-Grade Zinc Mine

    SPAIN’S NEXT HIGH-GRADE ZINC MINE Powering The Energy Transition I NVES T OR PRE SE NT AT IO N – AN NU AL GE NER AL MEE T ING NOVEMBER 2025 ASX:VAR

  2. Slide 2: Disclaimer & Important Notice

    DISCLAIMER & IMPORTANT NOTICE ASX:VAR This document is for information purposes only. It is not a prospectus, disclosure document or offering document under Australian law or under any other law and does not constitute an offer or invitation to apply for securities. In particular, this presentation

  3. Slide 3: Purpose, Strategy & Delivery

    Purpose, Strategy & Delivery Purpose To expand and develop our high-grade zinc assets to transition to a producing mining company Our Explorer-Producer Strategy is designed to deliver: early cashflow from production at the San Strategy Jose and Udías Mines, achieve attractive financial returns and s

  4. Slide 4: Explorer-Producer Strategy

    Explorer-Producer Strategy Opportunity to leverage brownfield assets + greenfield upside Saw-Tooth Growth Model: cashflow re-invested in phased scale-up → • VAR strategy to get best returns from its Production ramp-up and increase in Exploration activity / tonnage primary asset • Enter ‘starter oper

  5. Slide 5: AGM – Year in Review

    AGM – Year in Review Significant progress → growing and advancing Novales-Udías Project 3x Mineral Resource Upgrade Drilling results at San Jose Mine 3D laser 2nd highest Zn grade MRE on ASX • NDDT059: 15.3m @ 17.42% Zn, 4.40% Pb • • NDDT058: 14.30m @ 8.09% Zn, 1.28% Pb survey at • 3.4Mt @ 7.6% Zn,

  6. Slide 6: Recent Developments

    Recent Developments September 2025 September 2025 September 2025 WELL SUPPORTED CAPITAL 3D LASER SURVEY AT SURFACE DRILLING DATA RAISE COMPLETED UDÍAS MINE (2) OVER NEW LICENCES (3) • Second tranche placement (1) to raise $2.25 • 3D underground survey completed, • Acquisition of 146 historic drillho

  7. Slide 7: Recent Developments

    Recent Developments September 2025 October 2025 October 2025 SAN JOSE MINE RESTORATION POSITIVE POLITICAL POSITIVE ZINC MARKET PLAN APPROVED FOR MINING ENGAGEMENT DYNAMICS LICENCE AREAS (1) • Invitation from Government of Western • London Metal Exchange (LME) zinc price firmly • Clear and unambiguou

  8. Slide 8: Recent Developments → Near-Term Deliverables

    Recent Developments → Near-Term Deliverables November 2025 November 2025 Q4 2025 DRILLING RESULTS FROM EARN-IN TO IRISH ZINC ASSETS PRE-CONCENTRATION MET UDÍAS MINE (1) MDF TECHNICAL SERVICES & TEST WORK • >20%Zn intercept drilled; highest grade FIRST RIGHT OPPORTUNITY (2) • TOMRA engaged to conduct

  9. Slide 9: Near-Term Deliverables – Results being Finalised

    Near-Term Deliverables – Results being Finalised Q4 2025 Q4 2025 Q4 2025 FLOATATION MET TEST WORK GEOTECHNICAL TEST WORK MINE RE-START STUDY • Post Pre-Concentration, Characterisation and • Preliminary laboratory testing to derive the • San Jose ‘starter’ operation is a catalyst for Floatation testi

  10. Slide 10: Corporate Snapshot

    Corporate Snapshot Anthony Wehby Stewart Dickson Dr. Frank Bierlein Nicholas Farr-Jones Chairman Managing Director & CEO Non-Exec Director Non-Exec Director Proven track record Project development Financing Operational experience Successful financial exits Capital Structure ASX Code VAR Share Price(

  11. Slide 11: Zinc

    Zinc Future-facing metal critical for energy transition & infrastructure Global Zinc Exploration Budget 2005–2024 (USD, millions)(2) Zinc industry larger than Lithium + Cobalt + Uranium combined Value of commodity markets 2025e (3) Falling ore grades and limited exploration through declining explora

  12. Slide 12: Zinc: Rising Prices + Depleted LME Inventories

    Zinc Rising prices + Depleted LME Inventories Base Metals' price indices (12mth rolling) (1) Zinc inventories vs LME price (US$/t, kt) (2) LME Zinc Prices +$3,000 / tonne Stocks Less Than One Day of Global Demand Base metals upward price performance over LTM Refined zinc market most severe supply cr

  13. Slide 13: Proven Assets: Right Location

    Proven Assets: Right Location Spain: one of Europe’s most active mining jurisdictions 4th largest EU economy 2nd largest copper producer in Europe (2) Only producer of strontium in Europe(2) International mining companies established with multi- decade track record of operating in Spain Mine permitt

  14. Slide 14: Proven Assets: Past Production + Exploration

    Proven Assets: Past Production + Exploration One of Europe’s highest-grade, development stage zinc deposits • Premier Zinc-Lead District: Basque- Cantabrian basin is well-understood & hosts world-class former Reocín Mine, produced approximately 62 Mt of ore grading 8.7% Zn and 1.0% Pb(1). • Near-Ter

  15. Slide 15: JORC Mineral Resource Estimate

    JORC Mineral Resource Estimate Novales-Udías Project Grade Contained Metal Mineral Resource Tonnage Zinc Lead Zinc + Lead Zinc Lead Zinc + Lead Deposit Classification (t) (%) (%) (%) (t) (t) (t) Measured 480,254 9.18 1.80 10.98 44,064 8,654 52,718 Indicated 641,881 8.69 1.50 10.19 55,782 9,607 65,38

  16. Slide 16: San Jose Mine

    San Jose Mine Measured & Indicated Resources → Basis For Mine Re-start Study 3D View of JORC Mineral Resource Estimate Sources: ASX:VAR (1) Refer ASX announcement 9 December 2024 16

  17. Slide 17: Proven Assets: High-Grade Zinc Project

    Proven Assets: High-Grade Zinc Project Past Production → Realistic Re-Start San Jose ‘starter’ operation a catalyst for larger operation Linking San Jose Mine & Udías Mine • Drilling upside with mineralisation at San Jose and Udías open in all directions • Initial, high-grade resource: 1.7Mt @ 8.6%

  18. Slide 18: San Jose Mine Re-Start Study

    San Jose Mine Re-Start Study Scoping Level with delivery scheduled for Dec 2025 Study Objectives • Mine Re-Start Study is well advanced and will provide basis to move to FID • Near term production opportunity, targeting production by 2027-28 • Objective to establish, profitable mining ‘starter’ oper

  19. Slide 19: San Jose Mine Re-Start Study

    San Jose Mine Re-Start Study Ultra Low Capex Expected Brownfield advantages to decrease capital requirement & execution Leveraging existing infrastructure with site lease agreed risk • Valid Mining Licence & Restoration Plan approval enables mining to commence • Existing mine-site & regional infrast

  20. Slide 20: Near-term Producer Enablers

    Near-term Producer Enablers Strategically located with world-class infrastructure World’s largest Zinc smelter (1) within trucking distance (San Juan de Neiva Zinc smelter owned by Glencore) Met test underway to confirm concentrate specification & suitability Onsite sealed road access already connec

  21. Slide 21: Exploration drilling planned at San Jose Mine

    Exploration drilling planned at San Jose Mine Permitted for +13,000m high-impact surface drilling campaign Future Priority Drilling designed & permitted (1) → MRE Uplift 1 Step Out drilling on trend Extending on-trend in NNE direction to link up with mineralized zones outside of the MRE and small mi

  22. Slide 22: Udías Mine

    Udías Mine Untapped upside at interlinked deposit • San Jose Mine links to much larger historical Udías zinc mine complex that closed in 1930s • Interlinked underground mining operation with much of the tenement covered by San Jose mining licence • > 3.5 km of linear length, within permit area but o

  23. Slide 23: Udías Mine

    Udías Mine Excellent maiden underground drilling results Drilling to continue along mine development to link up with existing Top 20 best-ever intercepts drilled by Variscan at the Mineral Resource Estimate and beyond to San Jose Mine Udías Mine in 2025 ASX Date Drillhole ID Length (m) Zn (%) m x Zn

  24. Slide 24: Drilling-led Exploration

    Drilling-led Exploration Highly successful drilling indicates scope to grow… Drilling success evidences quality of deposits across Underground access → efficient & cost- the Novales-Udías project on global basis effective drilling Results in 2025 include 5 of the best-ever 20 drill holes VAR owned &

  25. Slide 25: Exploration Upside for Future Growth

    Exploration Upside for Future Growth Significantly expanded tenements (111 km2) → Zinc District Scale Opportunity Significant historical drilling activity over the licences → Substantially reassembled Asturiana de Zinc (Xstrata) MRE upside / de-risked exploration land & licence package • Hipolita Li

  26. Slide 26: Exploration Upside for Future Growth

    Exploration Upside for Future Growth Acquisition of 146 historic drillholes for 52,034 metres → multiple high-grade Zn & Pb intercepts across newly granted licences. Drillholes are outside the current MRE supporting a larger, longer-term, 90 drillholes over possible unmined extensions of mineralizat

  27. Slide 27: Near-term Producer Enablers

    Near-term Producer Enablers Full Government Support and Excellent Social Licence Government of Cantabria fully support the Company’s plans to recommence mining. A dedicated working group has been established by the Minister to streamline coordination across departments Existing approvals, community

  28. Slide 28: Near-term Producer Enablers

    Near-term Producer Enablers Strong Backing with Equity Alignment and Offtake Potential • Strategic shareholder support with significant mining sector expertise Strategic Shareholders • Long-term holders with credibility and funding capability • Top 20 account for 75% of VAR ownership • Directors hol

  29. Slide 29: Proposed Acquisition: BMex Exploration

    Proposed Acquisition: BMex Exploration Low risk Earn-In to prospective Zinc opportunities BMEx Projects Midlands Project Mines / zinc Deposits . • Located in the Irish Midland Zinc Belt, County of Longford, consists of two licences over 58 km2 in aggregate. Abbeytown • The licences are valid to Octo

  30. Slide 30: Proposed Acquisition: BMex Exploration

    Proposed Acquisition: BMex Exploration Transaction Rationale & Conditions Precedent Transaction Rationale Conditions Precedent Deepen our zinc focus which is complementary to existing Variscan shareholders approving the Proposed Transaction 1 asset base pursuant to Listing Rule 10.1 Expand our busin

  31. Slide 31: Proposed Acquisition: BMex Exploration

    Proposed Acquisition: BMex Exploration More than Zn Assets → Technical Services & First Right Opportunity with MDF Transaction confers strategic growth opportunities to Variscan with MDF (1) 1 Technical Services • MDF may provide to VAR technical services and subject matter expertise to assist with

  32. Slide 32: Future Newsflow & Catalysts

    Future Newsflow & Catalysts Advancing to Near-Term Production & Growth through Exploration Udías Mine Drilling + Results Step-Out on Strike Surface Drilling + Results (1) Updated MRE Updated MRE FID Study / Decision Pre-Conc Test Work San Jose Preliminary Project Filing with local government Re-Star

  33. Slide 33: Value Opportunity: EV/Attributable tonne contained Zinc

    Value Opportunity EV / Resource comparable analysis indicates value upside Enterprise Value Per Attributable tonne Contained Zinc (M, I & I): VAR vs. ASX Zinc Pre-Production Companies 450 EV/Attributable tonne contained Zinc (A$/t) 400 385.8 350 300 250 225.7 199.8 200 150 131.2 112.0 100 65.8 50 20

  34. Slide 34: One of the Highest-grade Zn Projects on ASX

    Zinc Grade (%) 0.0 4.0 2.0 8.0 10.0 6.0 12.0 Seal-American West Metals San Jose-Variscan Mines Gorno-Altamin Source: Company reports; refer Appendix 1 for source data Sulphur Springs-Develop Global Ltd Mineral Resource Estimate Queen Grade-Tartana Minerals Limited Tala Hamza-Terramin One of the High

  35. Slide 35: Investment Summary

    Investment Summary • One of the highest-grade zinc MREs on ASX: 3.4Mt @ 7.6% Zn, 0.9% Pb (1) Advancing a Tier-1 Zinc • Brownfield project with sunk capital enables low-cost restart Asset Towards • San Jose mine previously operated for 20 years; zinc price now 2x higher Production • Mining Licence gr

  36. Slide 36: Outlook

    Outlook Unlocking the value opportunity Selected milestone achievements since Q4 2024 raise Delivering capital efficient results (1) 3x 2x #1 Growth in Mineral Growth in exploration Best-ever drill result Resource Estimate licence areas to 111km2 15.3m @ 17.4% Zn, 4.4% Pb Future catalysts Geotechnic

  37. Slide 37: Appendices

    APPENDICES

  38. Slide 38: Appendix 1 – Data sources for grades of ASX listed zinc projects

    Appendix 1 – Data sources for grades of ASX listed zinc projects Resource Category Measured Indicated Inferred Total Source Exploration Company Market Deposit Stage Tonnes Grade (Zn%) Tonnes Grade (Zn%) Tonnes Grade (Zn%) Tonnes Grade (Zn%) American W est Metals ASX Seal Resource - - - - 1,006,000 1

  39. Slide 39: Appendix 2 – Data sources Enterprise Value Per Attributable tonne Contained Zinc

    Appendix 2 – Data sources Enterprise Value Per Attributable tonne Contained Zinc: VAR vs ASX Listed Peers Contained EV per Net Cash/ Grade Market Cap Project Exploration Metal attributable Company Market (Debt) EV (AUD) Deposit Tonnes (t) Source (AUD) Ownership Stage tonne Zn (AUD) (AUD/t) Zn (%) Zn

  40. Slide 40: Spain's Next High-Grade Zinc Mine

    SPAIN’S NEXT HIGH-GRADE ZINC MINE For more information, please contact: Stewart Dickson Chloe Hayes Managing Director & CEO Investor & Media Relations +44 7799 694 195 +61 458 619 317 +61 8 9316 9100 chloe@janemorganmanagement.com.au stewart.dickson@variscan.com.au ASX:VAR variscan.com.au 40

Variscan Mines — Shareholder Meeting (November 2025) on 6ix