Harte Gold Corp

Harte Gold — Investor Presentation (May 2010)

18 slides from Harte Gold's investor presentation, May 2010

  1. Slide 1: Harte Gold Corp. Investor Presentation May 2010

    H Harte G Gold ld C Corp. Gold Exploration in the Hemlo Camp Ontario,, Canada Investor Presentation May 2010

  2. Slide 2: Property Locations

    Property Locations Canada’s Prolific Abitibi - Wawa Greenstone Belt Ontario Quebec Sugar Zone Stoughton-Abitibi Hemlo Timmins Island Gold Holloway Val d‘Or Eagle River Rouyn-Noranda Kirkland Lake

  3. Slide 3: Sugar Zone

    “S Sugar ga Zone ” „ Th principal The i i l assett off the th Company C is i the th Sugar S Zone Property located 60 kms east of Hemlo, Ontario „ The Sugar Zone contains an NI 43- 43-101 compliant inferred resource of 284,500 ounces grading 9.75 g/t gold „ April / May 2010 diamond drill program conf

  4. Slide 4: Sugar Zone Gold Deposit

    Sugar Zone Gold Deposi os Trench 2 6.95 git / 3S.68nn Trench = Trench 3 ¥.37 git s 5.76m 3.66 grt ¢4.20m Trench 4 6.14 g/t / 2.20m Sugar Zone: Section 130+00M (130 Shoot area), facing grid south, showing weighted average gold values used in resource estimate.

  5. Slide 5: Resource model – expansion potential

    Resource model – expansion potential

  6. Slide 6: Sugar Zone geology and resource outline

    Legend Resource outline 87.8g/t Au DEPOSIT ZONE Claim boundary RESOURCE OUTLINE 284,000 oz Au 2009 Outcrop Sample 30.4g/t Au 7K STRUCTURE 2009 Float Sample p 87.8g/t Au 9.04g/t Au 1 km N 30.4g/t Au Harte Gold Corp S Sugar Z Zone Geology 2009 Sampling Mafic Volcanics Granite Ultramafic

  7. Slide 7: Drill Targets To Expand Resource

    Drill Targets To Expand Resource Area 1 • Virtually no drilling • Numerous untested IP anomalies • 2.3 km untested strike length • Source of mineralized boulders unknown • Zone remains open to the Northwest SUGAR ZONE GOLD RESOURCE OUTLINE 284,500 oz Au Area 2 • Shallow drill testing over 1.3 km str

  8. Slide 8: Sugar Zone intersected at Depth April 2010

    Sugar Zone intersected at Depth April 2010 multiple VG „ SZ 103 LZ „ VG (8.35 g/t over 1.76m incl. 18.13 g/t over 0.62m)

  9. Slide 9: Significant results from 2010 drilling

    Si ifi Significant t results lt from f 2010 d drilling illi Hole # From To Width Grade VG SZ10--102LZ SZ10 363.10 363.94 0.84 15.25 Yes SZ10– SZ10 –105LZ 35.89 35 89 39.09 39 09 3.20 3 20 24 71 24.71 Y Yes SZ10– SZ10 –106LZ 39.82 45.27 3.23 8.02 Yes SZ10– SZ10 –107LZ 44.97 48.03 3.06 12.45 Yes SZ10-

  10. Slide 10: Sugar Zone intersected at Depth April 2010

    Sugar Zone intersected at Depth April 2010 multiple VG

  11. Slide 11: Sugar Zone intersected at Depth April 2010

    Sugar Zone intersected at Depth April 2010 multiple VG

  12. Slide 12: Sugar Zone Intersected 500m south of main deposit

    Sugar Zone Intersected 500m south of main deposit „ SZ09 SZ09--96 „ Visible Gold (8.49 g/t 0.61m)

  13. Slide 13: Sugar Zone - Blue Sky Potential

    Sugar Zone - Blue Sky Potential • Current drill program confirms Sugar Zone extension at depth 0.59% Zn over 1.8 ft • Numerous targets have been identified Shear Zone py, po, minor cpy 0.47% Zn over 2.8 ft over extensive land Trench values to 7.2 gpt Au package 0.33% Ni over 5.0 ft or Grab sample of

  14. Slide 14: Experienced Management Team

    Experienced Management Team „ Stephen G G. Roman Roman, President and CEO over 30 years in mineral exploration and finance, has identified, developed and brought into commercial production a number of mining and oil and gas projects. Responsible for Gold Eagle discovery at Exall Resources and subseq

  15. Slide 15: Share Capital

    Share Capital p HRT – TSXV (May 27, 2010) Common Shares 111,947,531 Warrants 24,196,002 Options 4,450,000 Fullyy Diluted 140,593,533 , ,

  16. Slide 16: Share Price / Trading

    Share Price / Trading ( May 26, 2010)

  17. Slide 17: Next Steps

    N t St Next Steps Sugar g Zone • Update 43 43--101 to include Spring 2010 drill results • Baseline biological / wildlife studies • Sampling & trenching of high grade zones found in 2009 • Economic assessment of property for underground mining • 5,000m 2010 drill program Stoughton St ht Abitibi • Dat

  18. Slide 18: Harte Gold Corp.

    Harte Gold Corp. Gold Exploration in the Hemlo Camp Ontario,, Canada

Harte Gold — Investor Presentation (May 2010) on 6ix