Goldmining Inc. · TSX:GOLD

Goldmining — Investor Presentation (February 2019)

33 slides from Goldmining's investor presentation, February 2019

  1. Slide 1: Corporate Presentation February 2019

    GOLD:TSX | GLDLF:OTCQX GoldMining.com Corporate Presentation February 2019

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains certain forward-looking statements that reflect the current views and/or expectations of GoldMining with respect to its business and future events including statements regarding GoldMining’s growth strategy and exploration plans. Forward-looking

  3. Slide 3: GoldMining: Consolidating Gold Resource in the Americas

    GoldMining Consolidating Gold Resource in the Americas 9.5 Moz Multi-million ounce gold resource M&I RESOURCE • Portfolio of highly prospective gold and copper projects 11.7 Moz • Located in mining friendly jurisdictions in the Americas INFERRED RESOURCE • Significant exploration and expansion poten

  4. Slide 4: GoldMining Assets

    GoldMining Assets Pipeline of Gold & Copper Resource-Stage Projects Yellowknife Gold Project, Canada (Independent Resource Estimate Underway) Whistler Project, USA Contained Metal Category (Oz Au) (Mlbs Cu) Rea Uranium Project, Canada M&I 1,765,000 343.1 (25% JV with Orano) Inferred 4,626,000 713.5

  5. Slide 5: Gold Discoveries Decreasing

    Gold Discoveries Decreasing Average discovery cost has increased from US$34/oz to US$174/oz Gold in Major Discoveries (Moz) Projected New Gold in Discoveries (Moz) Gold Prices 200 $2,000 Discovery Cost $34/oz $174/oz 150 $1,500 Gold in Major Discoveries Gold Prices (US$/oz) (Moz) 100 $1,000 50 $500

  6. Slide 6: Acquisitions Near Bottom of the Gold Cycle

    Acquisitions Near Bottom of the Gold Cycle Seven Acquisitions in 5 Years 175% 4,000 IPO: May 2011 3,500 TSX-V Index Closing Prices (C$) 3,000 M&I: 0.69 Moz Au INF: 0.54 Moz Au 2,500 M&I: 9.5 Moz Au INF: 11.7 Moz Au 2,000 Commodity Bull Market 1,500 1,000 Commodity 500 Bear Market 0 2002 2003 2004 20

  7. Slide 7: Peak Market Cap of Acquisitions

    Peak Market Cap of Acquisitions Using Low Gold Price to Build Value Total Cost of Acquisitions $80 Crucero (Peru) $63 Yellowknife (NWT) $102 La Mina (Colombia) $63 Titiribi (Colombia) $334 Whistler (Alaska) $122 Sao Jorge (Brazil) $136 Total Peak Market Cap $822 0 100 200 300 400 500 600 700 800 900

  8. Slide 8: GoldMining at a Glance

    GoldMining at a Glance Share Structure Key Shareholders Issued & Outstanding 137.4 M KCR Fund Sprott Global Options 10.0 M BRASILINVEST Extract Capital Warrants 7.4 M IAMGOLD Corporation Marin Katusa Fully Diluted* 154.8 M Ruffer Gold Market Cap C$128 M Financial Cash (no debt)** C$9.2 M 41% GOLD: T

  9. Slide 9: Para State, Brazil

    Para State, Brazil Second Most Active Mining State in Brazil Tucano (Au)/Beadell Para State Belem Aurizona (Au)/Equinox Cachoeira (Au)/GMI Gurupi (Au)/Avanco Montes Aureos (Au)/GMI Trinta (Au)/GMI Volta Grande (Au)/Belo Sun Cuiu Cuiu (Au)/Cabral Salobo (Cu)/Vale Tocantinzinho (Au)/Eldorado Serra Pel

  10. Slide 10: Para State Projects

    Para State Projects Exceptional Exploration Upside Indicated Inferred Cut-off Project Tonnage Grade Gold Insitu Tonnage Grade Gold Insitu g/t Mt g/t oz Mt g/t oz Sao Jorge 0.3 14.420 1.54 715,000 28.190 1.14 1,035,000 Cachoeira 0.35 17.470 1.23 692,000 15.667 1.07 538,000 Surubim 0.3 - - - 19.440 0.

  11. Slide 11: Sao Jorge

    Sao Jorge Open Pit Deposit – 1.54 g/t Indicated Resource Grade • Near surface mineralization amenable to open pit extraction • Disseminated and stockwork style mineralization over wide intervals • 145 diamond drill holes • Metallurgical recoveries of 93% Mineralized • ~80% of land holding un- Envelo

  12. Slide 12: Sao Jorge

    Sao Jorge Gold Mineralization Associated with Resistivity High – Extends 2.5 km South 12 GOLD:TSX | GLDLF:OTCQX | GOLDMINING.COM

  13. Slide 13: Cachoeira

    Cachoeira Eastern side of Cachoeira Gurupi Greenstone Belt Shear unexplored • Three deposits located along western side of Cachoeira Shear Zone • 31,302 m drilling (285 holes) • Average depth of drilling is 100 m • Underground workings • Gold mineralization hosted in albite-quartz- sulphide alterati

  14. Slide 14: Mid-Cauca Belt

    Mid-Cauca Belt One of the Most Prospective Gold Belts in the World Approx. 100 million ounces gold discovered in the last 10 years Newly elected President pledges to boost Colombia’s competitiveness in extractive industries and bolster foreign investment Miocene age porphyry and epithermal deposits

  15. Slide 15: Titiribi & La Mina

    Titiribi & La Mina Gold-Copper Porphyries and Gold Epithermal Deposits Grade Contained Metal Cut-off4 Tonnage Deposit Gold Silver Copper Gold Eq Gold Silver Copper Gold Eq (g/t) (Mt) (g/t) (g/t) (%) (g/t) (oz) (oz) (Mlbs) (oz) Measured Resources Titiribi 0.3 51.60 0.49 - 0.17 0.78 820,000 - 195.1 1,

  16. Slide 16: Titiribi

    Titiribi Two-year Drill Program (2011-2012) – Three Deposits & Six Prospects Selected drill hole intersections Chisperos NW Breccia Interval Au Cu Deposit/Target Drill Hole M g/t % Cerro Vetas CV-046 70.3 1.21 0.27 Cerro Vetas CV-053 442.0 0.86 0.19 Maria Jo Cerro Vetas CV-054 185.1 0.90 0.29 Cerro

  17. Slide 17: La Mina

    La Mina Three-year Drill Program (2011-2013) – Three Deposits & Several Targets Selected drill hole intersections Interval Au Cu Deposit/Target Drill Hole Buenavista M g/t % El Limon LME-1084 49.07 0.36 0.11 Middle Zone LMDDH-012 94.00 0.76 0.39 Media Luna Middle Zone LME-1034 102.42 0.71 0.24 Middl

  18. Slide 18: Titiribi & La Mina

    Titiribi & La Mina Office, Accommodation and Core Storage Titiribi Office and Core Facility La Mina Core Facility La Mina Office La Mina Office 18 GOLD:TSX | GLDLF:OTCQX | GOLDMINING.COM

  19. Slide 19: Peru

    Peru One of Worlds Largest Producers of Base and Precious Metals • Top global producer Colombia Ecuador • 2nd in copper • 6th in gold Iquitos Orogenic Gold Belt • First in Mining Investment in Latin America (Fraser Institute) Chiclayo Brazil • Mining is 14% of GDP and 60% of exports Yanacocha Pataz

  20. Slide 20: Crucero

    Crucero Underexplored Gold Belt Indicated Inferred Cut-off Project Tonnage Grade Gold Insitu Tonnage Grade Gold Insitu g/t Mt g/t oz Mt g/t oz Crucero 0.4 30.653 1.0 993,000 35.779 1.0 1,147,000 • Orogenic gold deposit • Hosted in Carbonaceous sediments • Structurally controlled A1 deposit • Gold mi

  21. Slide 21: Yellowknife Gold

    Yellowknife Gold One of Canada’s Highest Grade Gold Belts Nicholas • Yellowknife Greenstone Belt Discovery Mine (1 Moz) Ormsby-Bruce • On trend with 3 of the highest grade gold mines in Canada N • Giant Mine – 8.1 Moz @ +0.5 oz/t Goodwin Lake • Con Mine – 6.1 Moz @ +0.5 oz/t • Discovery Mine – 1 Moz

  22. Slide 22: Yellowknife Gold

    Yellowknife Gold Discovery Mine with nearby Nicholas Lake, Bruce and Ormsby Camp Ormsby portal 22 GOLD:TSX | GLDLF:OTCQX | GOLDMINING.COM

  23. Slide 23: Whistler

    Whistler Alaska – Mining Friendly Jurisdiction Whistler Project • Access • Charter flights from Anchorage to all-season airstrip • Permitted and built ice road in 2010 to build new camp • Roads to Resources Program • Land Tenure • State claims • Exploration permitting – straightforward • Project Ben

  24. Slide 24: Whistler

    Whistler Comparison with Pebble – Both in Kahiltna Terrane and Similar Age Minerals/ Project: Pebble Whistler Copper (Blb) 72 1 Gold (Moz) 94 6.4 Silver (Moz) 514 29 Molybdenum (Blb) 4.8 NA Drilling (m) 325,358 70,000 24 GOLD:TSX | GLDLF:OTCQX | GOLDMINING.COM

  25. Slide 25: Whistler

    Whistler District Scale Project – 170 sq km Grade Contained Metal Cut-off Classification Tonnes Gold Copper Gold Eq Gold Copper Gold Eq g/t g/t %) (g/t) (Moz (Mlbs) (Moz) Indicated 110.3 0.50 0.14 0.79 1.77 343.1 2.80 Inferred 311.3 0.47 0.11 0.68 4.63 713.5 6.73 • Bulk mineable near surface porphyr

  26. Slide 26: Rea Uranium

    Rea Uranium Western Athabasca Basin • Acquired through acquisition of Brazilian Gold in 2013 • $10 M in exploration • District scale – 125,000 Ha GoldMining Areva • GoldMining 75% and Orano 25% • Surrounds Orano’s high-grade Maybelle deposit • Discovered in 1988 • 17.7% U over 5.0m in MR-39 • Orano

  27. Slide 27: Experienced Leadership Team

    Experienced Leadership Team Directors and Management Amir Adnani Garnet Dawson David Kong Gloria Ballesta Herb Dhaliwal BSc MSc, PGeo BBA, CA, CPA LLB (Hon), MSc BComm Chairman CEO & Director Director Director Director Entrepreneur and Over 30 years in the Director for several mining Based in Colomb

  28. Slide 28: Capital Market and Technical Experience

    Capital Market and Technical Experience Advisory Board Mario Garnero Ken Wang Ross Sherlock Jeremy Richards Paul Zweng LLB PhD PhD, PGeo PhD, PGeo PhD Based in Brazil, Chairman Over the past 20 years, Dr. Over 28 years in the Research geologist Blended technical and of Brasilinvest Group, a Wang has

  29. Slide 29: Analyst Coverage

    Analyst Coverage Heiko Ihle, Managing Director • “GoldMining's resources remain undervalued. In short, the firm has accumulated a portfolio of projects in favorable mining jurisdictions such as Brazil, Colombia, Peru, the U.S., and Canada.” • “GoldMining continues to execute on its strategy of acqui

  30. Slide 30: Pipeline of Resource-Stage Projects

    Pipeline of Resource-Stage Projects Global Classified Resource Statement Grade Contained Metal Cut-off4 Tonnage Deposit Gold Silver Copper Gold Eq Gold Silver Copper Gold Eq (g/t) (Mt) (g/t) (g/t) (%) (g/t) (Moz) (Moz) (Mlbs) (Moz) Measured Resources Titiribi5 0.3 51.60 0.49 - 0.17 0.78 0.820 - 195.

  31. Slide 31: Global Classified Resource

    Global Classified Resource Table Notes 1. Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources will be converted into mineral reserves. The estimate of mineral resources may be materially affec

  32. Slide 32: Global Classified Resource

    Global Classified Resource Table Notes • Gold equivalent estimated for the Whistler deposit assumes metal prices of US$990/oz gold, US$15.40/oz silver and US$2.91/lb copper and recoveries of 75% for gold and silver and 85% for copper. • Gold equivalent estimated for the Raintree West deposit assumes

  33. Slide 33: People Strategy Gold

    GOLD:TSX | GLDLF:OTCQX GoldMining.com PEOPLE STRATEGY GOLD Toll Free: (855) 630-1001 Corporate Head Office Chairman: Amir Adnani Fax: (604) 682-3591 1830-1030 West Georgia Street CEO: Garnet Dawson Email: info@goldmining.com Vancouver, British Columbia President: Paulo Pereira www.goldmining.com Can

GoldMining — Investor Presentation (February 2019) on 6ix