K92 Mining, Inc. · TSX:KNT

K92 Mining — Investor Presentation (March 2025)

62 slides from K92 Mining's investor presentation, March 2025

  1. Slide 1: Investor Presentation March 2025 – Kainantu Gold Mine

    INVESTOR PRESENTATION • March 2025 K1 Vein, Kora Deposit Kainantu Gold Mine 2021 THAYER LINDSLEY AWARD Papua New Guinea (BEST GLOBAL DISCOVERY)

  2. Slide 2: Forward-Looking and Cautionary Statements

    Forward-Looking and Cautionary Statements TSX: KNT OTCQX: KNTNF This Presentation is being provided for information purposes only and does not constitute or form part of, and should not be construed as, an offer or invitation to sell or any solicitation of any offer to purchase or subscribe for any

  3. Slide 3: K92 Mining – A Unique Tier-1 Opportunity

    K92 Mining – A Unique Tier-1 Opportunity TSX: KNT OTCQX: KNTNF Rapid near-term growth to Tier 1 Mid-Tier Producer Large, high-grade resource with significant growth towards 500 koz AuEq pa at industry leading low costs potential from multiple deposits • Stage 3 Expansion to 300 koz AuEq pa (commissi

  4. Slide 4: Located Amongst World Class Geology and Excellent Infrastructure

    Located Amongst World Class Geology and Excellent Infrastructure TSX: KNT OTCQX: KNTNF Natural Resource Friendly Jurisdiction Large ~830 km2 land package along major regional • Multiple Senior Mining Companies Operating (Barrick, Harmony, Newmont) structure hosting multiple large world-class • Vibra

  5. Slide 5: Corporate Structure

    Corporate Structure TSX: KNT OTCQX: KNTNF Key Financial Data (as at Sep 30/24) Fully Funded to Execute Growth Trajectory Symbol TSX: KNT, OTXQX: KNTNF Strong Cash Balance Fully Diluted Shares Outstanding 246.1 Cash US$120m Significant Available Liquidity From Credit Facilities Restricted Cash(1) US$

  6. Slide 6: Underground Assets: High-Grade Resource Comparison

    +5mozAuEq Resource, High-Grade Assets (N. America, Australia & Europe Primary Listing) TSX: KNT OTCQX: KNTNF Producer Developer (2) (3) (4) Resource 4.5 - 3.8 g/t 3.3 - 2.5 g/t 3.4 g/t C$246/t 3.0 g/t 3.1 g/t 3.8 g/t 3.1 - 2.8 g/t US$217/t 4.3 g/t Cut-Off Grade Underground Assets 8.3 g/t 6.6 g/t 8.5

  7. Slide 7: Delivering Sustainable Value For the Prosperity of Papua New Guinea

    Delivering Sustainable Value For the Prosperity of Papua New Guinea TSX: KNT OTCQX: KNTNF At K92, we have a strong focus on the prosperity and development of PNG and our host communities through responsible mining practices. We are proud to: ▪ Currently employ +2,000 people (employees & contractors)

  8. Slide 8: Value Creation Through Discovery – May 2017 (Kora North Discovery)

    Value Creation Through Discovery – May 2017 (Kora North Discovery) TSX: KNT OTCQX: KNTNF (Long Section, Looking West) May 2017 – Total Resource: 1.7 moz at 11.6 g/t AuEq Inferred 8 Note: Inferred Resource Grade: 11.6 g/t AuEq (7.1 g/t Au, 34 g/t Ag, 2.2% Cu).

  9. Slide 9: Value Creation Through Discovery – Oct/2021 (Kora) / Dec/2021 (Judd)

    Value Creation Through Discovery – Oct/2021 (Kora) / Dec/2021 (Judd) TSX: KNT OTCQX: KNTNF (Long Section, Looking West) 2.3 moz at 9.3 g/t AuEq Measured & Indicated, 2.6 moz at 9.1 g/t AuEq Inferred 9 Note: Measured and Indicated Resource Grade: 9.3 g/t AuEq (7.7 g/t Au, 18 g/t Ag, 0.9% Cu). Inferre

  10. Slide 10: Value Creation Through Discovery – September 2023

    Value Creation Through Discovery – September 2023 TSX: KNT OTCQX: KNTNF (Long Section, Looking West) 2.6 moz at 10.0 g/t AuEq Measured & Indicated, 4.5 moz at 8.5 g/t AuEq Inferred 10 Note: Measured and Indicated Resource Grade: 10.0 g/t AuEq (7.8 g/t Au, 21 g/t Ag, 1.2% Cu). Inferred Resource Grade

  11. Slide 11: Systematically Executing to Become a Tier 1 Mid-Tier Producer

    Systematically Executing to Become a Tier 1 Mid-Tier Producer TSX: KNT OTCQX: KNTNF Start of Commissioning Targeting Second Half Q2 2025 4Q 2020 2Q 2023 Targeting 2H 2027 Stage 3 Stage 4 Stage 2 Stage 2A 1,200,000 tpa 303 koz AuEq pa 1,800,000 tpa 400,000 tpa 500,000 tpa Low Capex Upgrades to Low Ca

  12. Slide 12: Operational Performance – Since Commercial Production

    Operational Performance – Since Commercial Production TSX: KNT OTCQX: KNTNF AuEq Production (koz), Cash Cost ($/oz Au) and AISC ($/oz Au) Significant Portion of Sustaining Capex is for Upcoming Expansions 60koz Cash Cost (Au) AISC (Au) $1,506 $1,510 53koz 50koz $1,366 $1,300 39koz 44koz 31koz 40koz

  13. Slide 13: Kainantu Mine Execution

    1Q19 27kt 2Q19 38kt 3Q19 32kt 4Q19 30kt 1Q20 47kt 2Q20 49kt 3Q20 65kt 4Q20 69kt 1Q21 73kt 2Q21 76kt 3Q21 88kt 4Q21 100kt 1Q22 100kt 2Q22 109kt 3Q22 118kt 4Q22 122kt 1Q23 118kt 2Q23 112kt 3Q23 121kt Total Ore Processed (kt) 4Q23 152kt 1Q24 131kt Note: Q4 head grade of 18.0 g/t AuEq or 17.3 g/t Au, 0.

  14. Slide 14: Development Ramp-Up Key Enablers

    Development Ramp-Up Key Enablers TSX: KNT OTCQX: KNTNF Multiple Key Enablers To Increase Lateral Development: Power Upgrade 3.0x Interim Water Management Upgrade (Completed at End of January) - Both Stage 1 and Stage 2 Complete 1.8x Significant increase in number of available headings - Multi Headin

  15. Slide 15: Strong Process Plant Performance

    Strong Process Plant Performance TSX: KNT OTCQX: KNTNF Throughput Recoveries Gold Copper 96.4% 95.3% 94.6% 95.3% 95.1% 93.7% 94.7% 94.2% 94.1% 92.6% 91.9% 90.7% 1Q24 Updated IDP 2Q24 3Q24 4Q24 2024 1Q24 Updated IDP 2Q24 3Q24 4Q24 2024 Parameter Average Parameter Average Plant throughput deliberately

  16. Slide 16: Updated IDP Highlights – Kainantu is a Tier 1 Asset

    Updated IDP Highlights – Kainantu is a Tier 1 Asset TSX: KNT OTCQX: KNTNF Stage 3 DFS Stage 4 PEA • 100% Throughput Increase from 600 ktpa Stage 2A Plant - • 200% Throughput Increase from 600 ktpa Stage 2A Plant New Standalone 1.2 mtpa Stage 3 Plant to 1.8 mtpa (Stage 3 & 2A Plants Both Operating) •

  17. Slide 17: Life of Mine Plan Material Movement Schedule

    Life of Mine Plan Material Movement Schedule TSX: KNT OTCQX: KNTNF Mill Feed Material Movement (kt) and Head Grade (g/t AuEq) Processed Tonnage (kt) Head Grade - AuEq (g/t AuEq) Conversion of Inferred & Exploration Focused on Maintaining 473kt 1,200kt 1,200kt 1,200kt 13.72 and Growing Peak Throughpu

  18. Slide 18: Near-Term Mine Transformation: Major Infrastructure Upgrades

    Near-Term Mine Transformation: Major Infrastructure Upgrades TSX: KNT OTCQX: KNTNF Kora-Irumafimpa Planned Twin Incline and Development Long Section (Looking West) 1 Twin Incline Scope: High Speed 2.9km twin incline, capable of +5 mtpa with conveyors Status: Effectively Complete Impact: Transforms m

  19. Slide 19: Rapid Ore Transport - Twin Incline Effectively Complete

    Rapid Ore Transport - Twin Incline Effectively Complete TSX: KNT OTCQX: KNTNF Existing Incline to Main Mine New Twin Incline (#2) Under Development Transported 1 mt (waste & ore) in 2022 High Speed, Large Travel way, Gradual Gradient 6.5 metres 4.5 metres The Twin Inclines Are Effectively An Undergr

  20. Slide 20: Ore Pass System – Raise Bore Rigs Operational

    Ore Pass System – Raise Bore Rigs Operational TSX: KNT OTCQX: KNTNF Underground raise bore site setup Reaming of First Raise (5m diameter) completed to upgrade Ventilation to Main Mine Completed Development of First Waste/Ore Pass Connecting Main Mine to Twin Incline to drive significant productivit

  21. Slide 21: 3x Increase of Mining Fronts by End of 2025

    3x Increase of Mining Fronts by End of 2025 TSX: KNT OTCQX: KNTNF Kora-Irumafimpa Long Section (Looking West) 1 Current Mining Front (Kora and Judd) 2 Current Status: Developing First Sublevel To Access Ore 3 Current Status: Inclining to Establish New Mining Front 4 2026: New Mining Front Once Paste

  22. Slide 22: February Site Visit - Governor of Morobe Province

    February Site Visit - Governor of Morobe Province Hon. Luther Wenge TSX: KNT OTCQX: KNTNF Morobe Province Governor Hon. Luther Wenge Conducted a Site Visit Where K92 Showcased Its Operations, Upcoming Expansions and Various Community Initiatives New Article Source: TVWAN, https://tvwan.com.pg/news/3

  23. Slide 23: Life of Mine Plan Production Schedule

    Life of Mine Plan Production Schedule TSX: KNT OTCQX: KNTNF Production Profile (koz AuEq) and AISC Co-Product (US$/oz AuEq) Production (koz AuEq) AISC (US$/oz AuEq) - Co-Product Conversion of Inferred & Exploration Focused on Maintaining 179koz 319koz 303koz 225koz 287koz and Growing Peak Production

  24. Slide 24: Life of Mine After-Tax Cash Flow Estimates ($1,900/oz)

    Life of Mine After-Tax Cash Flow Estimates ($1,900/oz, $4.5/lb Cu, $25/oz Ag) TSX: KNT OTCQX: KNTNF After-Tax Free Cash Flows (US$m) Conversion of Inferred & Exploration Focused on Maintaining $247m $252m and Growing Peak Cash Flows $219m $147m $116m Stage 3 DFS ($14m) ($98m) 2024 2025 2026 2027 202

  25. Slide 25: Life of Mine After-Tax Cash Flow Estimates ($2,600/oz)

    Life of Mine After-Tax Cash Flow Estimates ($2,600/oz, $4.5/lb Cu, $31/oz Ag) TSX: KNT OTCQX: KNTNF After-Tax Free Cash Flows (US$m) Conversion of Inferred & Exploration Focused on Maintaining $365m $362m and Growing Peak Cash Flows $309m $238m Stage 3 DFS $166m $58m ($48m) 2024 2025 2026 2027 2028

  26. Slide 26: Gold Price Sensitivity Analysis

    Gold Price Sensitivity Analysis TSX: KNT OTCQX: KNTNF After Tax Net Present Value5% – Sensitivity Analysis Stage 3 DFS Stage 4 PEA $4,309m $3,806m $3,302m $2,798m $2,295m $1,791m $1,501m $1,296m $1,091m $886m $680m $475m $1,600 / oz Au $1,900 / oz Au $2,200 / oz Au $2,500 / oz Au $2,800 / oz Au $3,1

  27. Slide 27: Near-Term Delivery of Stage 3 & 4 Expansions

    Near-Term Delivery of Stage 3 & 4 Expansions TSX: KNT OTCQX: KNTNF 2025 2026 2027 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 New Standalone Stage 3 Expansion Process Plant (1.2 mtpa) Pastefill Plant Process Capacity Ramp-up to 1.8 mtpa Mine Ramp-up to 1.8 mtpa Life of Mine Primary Ventilation Upgrade Ore/W

  28. Slide 28: Process Plant Construction Rapidly Advancing

    Process Plant Construction Rapidly Advancing TSX: KNT OTCQX: KNTNF Structural and Mechanical Steelwork Long Lead Items Construction of the process plant is rapidly advancing with all long-lead items having already arrived on site 28

  29. Slide 29: Construction Rapidly Advancing

    Construction Rapidly Advancing TSX: KNT OTCQX: KNTNF Grinding Circuit Flotation Circuit (SAG + Ball Mill) Flotation Surge Bin Circuit Construction is most advanced at the grinding circuit (SAG + Ball), which is the critical path for the process plant construction schedule 29

  30. Slide 30: Ancillary Construction Projects Progressing Well

    Ancillary Construction Projects Progressing Well TSX: KNT OTCQX: KNTNF Interim Power Station - Complete Warehouse Construction - Complete Construction works on multiple ancillary packages is successfully complete, supporting the next phase of expansion 30

  31. Slide 31: Stage 3 Expansion Update – All Paste Fill Plant Long Lead Items Ordered

    Stage 3 Expansion Update – All Paste Fill Plant Long Lead Items Ordered TSX: KNT OTCQX: KNTNF Underground Paste Plant Surface Storage System Near Portal Tailings Filtration Plant Paste Fill Plant Front End Engineering and Design Complete, Detailed Engineering and Design Contract Awarded to GR Engine

  32. Slide 32: Multiple High Priority Near-Mine Targets

    Multiple High Priority Near-Mine Targets TSX: KNT OTCQX: KNTNF Multiple High Priority Near-Mine Vein and Porphyry Targets Airborne Geophysics and Target Locations Kora & Kora Deeps (Vein) 1 • Kora open to depth and along strike Kora South & Judd South (Vein) 2 • • Structure extends +1km beyond minin

  33. Slide 33: Exploration Target: Kora, Kora South & Kora Deeps

    Exploration Target: Kora, Kora South & Kora Deeps TSX: KNT OTCQX: KNTNF Multiple Highly Prospective Exploration Fronts Being Drilled Concurrently Kora South from Surface, Kora Deeps Underway from Twin Incline and Kora South Underway from 1205 Level Drill Drive Note: See slide 61 for complete grade i

  34. Slide 34: Judd and Judd South Vein System is Very Underexplored

    Judd and Judd South Vein System is Very Underexplored TSX: KNT OTCQX: KNTNF Judd is Sparsely Drilled, Has at Least 4 Known Veins and Open in All Directions Significant Amount of Drilling Completed Since the Judd Resource and Drill Defined Strike Length has Increased +130% Since End of 2021 Note: See

  35. Slide 35: Latest Drilling Results Kora-Kora South – K1 & K2 Vein Plan View

    Latest Drilling Results Kora-Kora South – K1 & K2 Vein Plan View TSX: KNT OTCQX: KNTNF Key Facts • The dilatant zones identified are the first to be drilled with significant drill density, demonstrating large interpreted strike lengths of approximately 60m in K1 and approximately 100m in K2, providi

  36. Slide 36: Copper Grade Tenor Increasing to the South towards A1 Porphyry

    Copper Grade Tenor Increasing to the South towards A1 Porphyry TSX: KNT OTCQX: KNTNF K2 Vein Copper Grade (%) Long-Section (Looking West)(1) Kora South/Judd South Drill Drive Well Established for Step-Out Drilling 36

  37. Slide 37: High Priority Exploration Targets: Arakompa and Maniape

    High Priority Exploration Targets: Arakompa and Maniape TSX: KNT OTCQX: KNTNF Arakompa and Maniape Veins Key Facts • Arakompa – Sparsely drilled, open along strike, at depth and along its width • Located ~4.5km from Kainantu process plant, with similar mineralization to the producing high grade Kora

  38. Slide 38: Two Major High-Grade Veins Confirmed to Date – AR1 and AR2

    Two Major High-Grade Veins Confirmed to Date – AR1 and AR2 TSX: KNT OTCQX: KNTNF Drilling at Arakompa has confirmed two major sub-parallel veins AR1 and AR2, defined over extensive strike and depth with a substantial average vein thickness of ~3 metres, respectively Both veins are open in multiple d

  39. Slide 39: First Program in 32 Years Continues to Define Interpreted Bulk Tonnage Zone

    First Program in 32 Years Continues to Define Interpreted Bulk Tonnage Zone TSX: KNT OTCQX: KNTNF Arakompa Target is Very Large: +1.7km Strike, +650m Vertical and 150- 225m Wide Corridor Open Along Strike, Depth and Width Note: See slide 62 for complete grade information for intersections. 39

  40. Slide 40: Significant Pipeline of Highly Prospective Exploration Targets

    Significant Pipeline of Highly Prospective Exploration Targets TSX: KNT OTCQX: KNTNF Vein Targets Porphyry Targets Kora/ Skarn Operations Judd Epithermal & Skarn Kora/Judd South Current Exploration Focus Feasibility Exploration Planned Within 24 months Pre-Feasibility Concept Resource Definition Blu

  41. Slide 41: Appendix

    K92 & MINING INC. Appendix

  42. Slide 42: Management & Directors

    Management & Directors TSX: KNT OTCQX: KNTNF Management Team Board of Directors Mineral engineer with +35yrs of global experience (Africa, Australia, Asia, N. America Over 35 years' experience as a lawyer, senior executive, director, journalist and author, and has held several John Lewins & former S

  43. Slide 43: 2030 GHG Emissions Reduction Target

    2030 GHG Emissions Reduction Target TSX: KNT OTCQX: KNTNF 40% lower carbon intensity compared to global average K92 has set a target to reduce Scope 1 and Scope 2 emissions by 25% on a business-as-usual basis by 2030 Kainantu has below industry average emissions and we are committed to further impro

  44. Slide 44: Operational Guidance - Investing in Our Major Expansion

    Operational Guidance - Investing in Our Major Expansion TSX: KNT OTCQX: KNTNF Key Figures Key Highlights • Production Growth: Production in the second half of 2025 is expected to Amount be the strongest, with operations ramping up ahead of the commissioning and ramp-up of the 1.2 mtpa Stage 3 Expans

  45. Slide 45: Kora Deposit Overview & Mining Conditions Summary

    Kora Deposit Overview & Mining Conditions Summary TSX: KNT OTCQX: KNTNF Deposit: Intermediate Sulphidation Multiple sub-vertical Au-Cu-Ag sulphide veins Focus is on the K1 and K2 veins, with the system also hosting other veins and link structures AuEq Grade: 10.2g/t (3g/t cut-off – M&I) with multipl

  46. Slide 46: Judd Deposit Overview & Mining Conditions Summary

    Judd Deposit Overview & Mining Conditions Summary TSX: KNT OTCQX: KNTNF Deposit: Intermediate Sulphidation Multiple sub-vertical Au-Cu-Ag sulphide veins, located ~150-200m east of Kora Focus is on the J1 vein, with the system also hosting at least three other veins AuEq Grade: 8.7g/t (3g/t cut-off –

  47. Slide 47: Kainantu Consolidated NI 43-101 Resources

    Kainantu Consolidated NI 43-101 Resources TSX: KNT OTCQX: KNTNF Tonnes Gold Silver Copper Gold Equivalent mt g/t moz g/t moz % kt g/t moz Kora Deposit Resource Summary (September 12/2023) Measured 3.7 8.7 1.0 21 2.5 1.2 45 11.0 1.3 Indicated 3.1 7.0 0.7 22 2.2 1.3 41 9.4 1.0 Measured & Indicated 6.9

  48. Slide 48: Efficient and Systematic Exploration – Kora and Judd

    Efficient and Systematic Exploration – Kora and Judd TSX: KNT OTCQX: KNTNF M&I – Kora and Judd (moz AuEq) Inferred – Kora and Judd (moz AuEq) Total – Kora and Judd (moz AuEq) (1) M&I Inferred Production Depletion 7.4 moz 0.3 moz 9.2 g/t 2.5 moz 8.7 g/t 4.9 moz 4.5 moz 8.5 g/t 2.6 moz 9.1 g/t 2.6 moz

  49. Slide 49: Comparison to Prior/2022 IDP – Major Improvement in Economics

    Comparison to Prior/2022 IDP – Major Improvement in Economics TSX: KNT OTCQX: KNTNF Stage 3 DFS Stage 4 PEA Prior IDP Updated IDP Prior IDP Updated IDP Start Year (Beginning of Year) 2022 2 yrs 2024 Start Year (Beginning of Year) 2022 2 yrs 2024 +16% $680m at $1,900/oz +73% $2.3b at $1,900/oz After-

  50. Slide 50: Cash Costs and AISC Breakdown

    Cash Costs and AISC Breakdown TSX: KNT OTCQX: KNTNF DFS Costs (Co-Product) PEA Costs (Co-Product) $3/oz $3/oz $224/oz $187/oz $54/oz $54/oz $130/oz $129/oz $152/oz $920/oz $822/oz $108/oz $80/oz $77/oz $279/oz $265/oz Mining Processing G&A Royalties, Refining, Sustaining Accretion AISC Mining Proces

  51. Slide 51: Significant Upcoming Reduction in Operating Costs – Mining

    Significant Upcoming Reduction in Operating Costs – Mining TSX: KNT OTCQX: KNTNF Mining Costs (US$/tonne) Multiple Drivers to Lower Mining Cost Per Tonne From the Expansions: Significant Increase in Ore Tonnes to Drive Economies of Scale Significant Reduction in Waste Tonnes Mined Significant Upgrad

  52. Slide 52: Significant Upcoming Reduction in Operating Costs – G&A

    Significant Upcoming Reduction in Operating Costs – G&A TSX: KNT OTCQX: KNTNF G&A Costs (US$/tonne)(1) Drivers to Lower G&A Cost Per Tonne with Expansions: From 2024 to Stage 4 Run-Rate, G&A costs in USD millions increases ~27% while throughput increases ~285% = significant economies of scale and re

  53. Slide 53: Operating Costs – Processing

    Operating Costs – Processing TSX: KNT OTCQX: KNTNF Processing Costs (US$/tonne) Multiple Drivers to Lower Processing Cost Per Tonne Stage 2A Process Plant Stage 3 Process Plant + with Expansions: Stage 2A Process Plant +3.8x Throughput Increase from 2024 to Stage 4 Expansion Run-Rate = Economies of

  54. Slide 54: Operating Costs – Summary

    Operating Costs – Summary TSX: KNT OTCQX: KNTNF Total Unit Costs (US$/tonne)(1,2) Key Points • Unit costs are elevated in the short term through elevated waste and ore development in addition to additional overheads ahead of the Stage 3 and 4 Expansions that transform Kainantu into a Tier 1, mid-tie

  55. Slide 55: Setting Up the Mine to Deliver the Expansions

    Setting Up the Mine to Deliver the Expansions TSX: KNT OTCQX: KNTNF Tonnage (t) and Production (koz AuEq) Once Stage 3 and 4 are online, total material mined increases slightly from 2024 (Stage 3 DFS: +32%, Stage 4 PEA: +117%) while AuEq Production is multiples greater PLUS the benefit of the major

  56. Slide 56: Capital Costs – Remain closely aligned with Operational Guidance

    Capital Costs – Remain closely aligned with Operational Guidance TSX: KNT OTCQX: KNTNF DFS Capital Costs PEA Capital Costs Power Station Electrical River Crossing Power Station Electrical OHPL River Crossing OHPL 6% Infrastructure Upgrade 5% Infrastructure 1% Upgrade 1% 4% 7% 4% Maintenance Faciliti

  57. Slide 57: Airborne Geophysics Identifies Many New Targets

    Airborne Geophysics Identifies Many New Targets TSX: KNT OTCQX: KNTNF Key Facts • Advanced MobileMT deep penetrating airborne geophysics flown over the entire ~830 km2 land package • First major geophysics program completed on property in +10 years • Results demonstrate an extensive untested potenti

  58. Slide 58: Blue Lake Porphyry Project - Significant Potential to Grow Resource Size

    Blue Lake Porphyry Project - Significant Potential to Grow Resource Size TSX: KNT OTCQX: KNTNF 10.8 moz AuEq / 2.9 blbs CuEq Maiden Inferred Resource Declared in August 2022 Grade Tenor Increasing with Depth & High Grade Potassic Core is Open at Depth Note: Estimates are based on Technical Report ti

  59. Slide 59: Blue Lake Porphyry Project – 10.8 moz Maiden Resource

    Blue Lake Porphyry Project – 10.8 moz Maiden Resource (August TSX: KNT OTCQX: KNTNF 2022) Blue Lake Resource Summary (August/2022) Large 10.8 moz AuEq / 4.7 blbs CuEq Tonnes Gold Silver Copper Gold Equivalent Copper Equivalent Inferred Resource mt g/t moz g/t moz % Blb g/t moz % Blb Blue Lake Inferr

  60. Slide 60: Kora and Judd Highlight Intersections From Presentation Images

    Kora and Judd Highlight Intersections From Presentation Images TSX: KNT OTCQX: KNTNF Drill Hole ID Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq Drill Hole ID Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KUDD0053 78.5 11.86 24.94 116 0.38 27.03 KUDD0038 28.7 18

  61. Slide 61: Arakompa Highlight Intersections From Presentation Images

    Arakompa Highlight Intersections From Presentation Images TSX: KNT OTCQX: KNTNF Hole_ID From (m) To (m) Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq Hole_ID From (m) To (m) Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KARDD0002 5.2 225 219.8 112.14 1.45 3 0.07

  62. Slide 62: Contact: dmedilek@k92mining.com

    E-mail: dmedilek@k92mining.com Phone: +1 (604) 416 4445

K92 Mining — Investor Presentation (March 2025) on 6ix